Forwards Update 6 to FSAR for TMI-1,reflecting Facility & Procedure Changes & Analyses Since Previous Update Submitted on 861022.Plant Configurations Made During Outage 6R Also Included
ML20236B359
Person / Time
Site: Crane 
Issue date: 07/21/1987
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236B361 List:
References
5211-87-2143, NUDOCS 8707290078
Download: ML20236B359 (1)


Text

- _ _

e-A J

[A y'

.c s.t e

GPU Nuclear Corporation I

U Nucle.ar-

=',emgaao o

h J

Middletown, Pennsylvania 17057 0191

,\\

x' 717 944 7621 J-sep 3

TELEX 64 2386

(

Writer's Direct Dial Number:

July 21, 1987 A

5211-87-2143 1

'.N

's NJ.S. Nuclear Regulatory Comission.

/

' ;Atte.ition: Document. Control Desk

.d.

Washi ngton,. D.C. - 20555 g[g he x

h*

Gent 1emen:

Three Mile Island Eclear Station Unit 1 (TMI-1)

N

[N 3

Operating l.icens~e ~No. DPR-50 4

Docket No. 50-289 Final Safety Analysis P.eport Update - 6 x

Enclosed-are one signed original and ten copfes of the Final Safety Analysis Report' Update - 6 for TMI-1, filed pursuant to 10CFR50.71(e). This FSAR Update contains changes 7ecessary to reflect information, facility. changes, procedure changes, and adlyses since the submittal of the last update (Update i 5, submitted October 22, 1986). This updates the FSAR primarily through b

January 22, 1987 however some changes in plant configuration made during 1

outage 6R have also been includeA'acle as of January 2?.,1987, k'the drawing where feasible. Note that sost of 'the-s Update 6 fiaures.are those avail

(

M revision process requires that, chjnges to drawings be made only subsequent to N

4 completion of system design moditjcations. Therefore, the text of the FSAR 1

f*

may have been updated but Miidffesponding FSAR drawins will not be updated t

{

until 1988 Update 7.

'4y s

i s s, Sincerely, it )

u.

1 N

' PVR ADOCK 05000289.

".3

<f k.

970729007hh70721

'*f,?

v s.

K PDR

~\\

H. D.

u ill s

3 Vice President and Director, TMI-1 HDH:RJM:l s, S

44399/0Pj5A A '

'II Enclosure

?

i cc:

R. Conte, USNRr, Sworkandsubscribedto d

G. Edison, USNRC, (w/o encl. )

beforAmethisy/

day of R. Blough, USNRC, (w/ encl.)

Uu/d

,1987.

D

/

I

,\\

SMMIC'.i l', Mk E01Ala (Uf.:.IC M f[

i MICMET0"A'3Gi.0. hilPHm 40DKTY O Cofi.ittss::t Mi' lim Jun.'.2,1$r3

/

Notary Pu-ic O

. i bmber, Pennsy(venia Assocation #4 Notatics GPU Nuclear Corporation is a subsidlary of the G'enefal Public Utilities Corporation I g{

y9 s

aJ.k

_