Summary of 890216 Meeting to Discuss Licensee Updated Schedule for Completion of Corrective Actions on Enforcement Items Identified Subsequent to Sept 1987.Issues Discussed Included Nuclear Fuel Integrated Improvement Plan
ML20236A820
Person / Time
Site: 07001100
Issue date: 03/03/1989
From: Pasciak W, Roth J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20236A818 List:
References
NUDOCS 8903200182
Download: ML20236A820 (3)


Text

4

)

s' l

o i

i U.S. NUCLEAR REGULATORY COMMISSION REGION I Docket No. 70-1100 License No. - SNM-1067 Licensee: Combustion Engineering, Incorporated i 100 Prospect Hill Road Windsor, Connecticut 06095-0500 Facility Name: Windsor Nuclear Fuel Fabrication Facility Type of Meeting: Management Meeting l

Meeting Date: February 16, 1989 '

3 Inspectors: 1 E/3 89 J. R th, Project Engineer d' ate /

1 Approved by: M f- ~ @Coc ~3 3 '

ak, Chief, Effluents Radiation W.J.PapcySection,FacilitiesRadiological /datp Protectibn Safety and Safeguards Branch Meeting _ Summary: A management meeting was held at Region I, King of Prussia Pennsylvania, on February 16, 1989, to discuss the licensee's updated schedult '

for completion of corrective actions on enforcement items identified at the Windsor Fuel Manufacturing facility subsequent to September 1987. The meeting was attended by NRC and licensee management. Two main issues were discussed:

(1) procedure for making necessary changes to commitment dates and (2) the demonstration of incremental progress on completion of corrective actions and on implementation of the Nuclear Fuel Integrated Improvement Plan.

l l

9903 00182 S0307 0 PDR ADOCK 0700 1

L___________.____ _ _ __

i :l

s

~

L _

i

_D_ETAI LS 1.0 Meeting Attendees j

~

l

a. Combustion Engineering, Incorporated P. McGill, Vice President, Nuclear Fuel j C.' Waterman, Vice President and General Manager, Nuclear Fuel 1 Manufacturing >

A. Scherer, Director, Nuclear . Licensing P. Rosenthal, Program Manager, Radiological and Industrial Safety

b. Nuclear Re'gulatory Commission
5. Ebneter, Director, Division of radiation Safety and Safeguards W.-Johnston, Deputy Director, Division of Radiation Safety and Safeguards R. Bellamy, Chief, Facilities Radiological Safety and Safeguards Branch W.. Pasciak, Chief, Ef fluents Radiattor' Protection Section, FRS&SB D. McCaughey, Licensing Project Manager, NMSS J. Roth, Project Engineer, ERPS, FRS&SB R. Loesch, Radiation-Specialist, FRPS, FRS&SB c '. .0thers

, .{

D. Duffy, Reporter, Hartford Cou, ant '

2.0 S p ary of Discussion Mr. Ebneter opened the meeting and expressed NRC's concern relative to an apparent misunderstanding of licensee actions which were allegedly pre-viously discussed durirg a management meeting on January. 17, 1989.

fir. Ebneter stated that during the January 17, 1989 meeting (1) the NRC agreed with the licensee on the concept of the revised organizational structure; however, the licensee must request approval of this structure from NMSS as soon as possible; and (2) the NRC accepted a revision in the date for incorporation of the task force results into the Nuclear Fuel Integrated Improvement Plan (NFIIP) from March 1, 1989 to March 31, 1989.

No additional revisions of commitment dates were discussed or agreed upon.

Mr. Pasciak requested information on the status of completion for each of >

the commitment dates previously identified.  ;

Mr. Waterman provided information on the status of some of the -i programmatic elements of the NFIIP and on a revised graphical computerized tracking system (PROMISE vs P2). The status of completion of each of the Radiological Protection Instructions (RPIs) was also presented.

1 i

3 f

3.0 Conclusions Mr. Ebneter concluded the meeting by stating that (1) the licensee can not make unilateral changes to commitment dates without first discussing those changes with the NRC; and (2) the licensee must be able to show the NRC that progrri* i' heing made on the completion of corrective actions and on implementors :n 4 the NFIIP.

1