ML20236A588

From kanterella
Jump to navigation Jump to search
Recommends That Proposed Rev 2 to Lakeview Remedial Action Insp Plan Be Accepted,Except for Paragraph 6.2.1.1 Which Would Provide for One Classification Test Out of Five to Fail Plasticity Index Requirement
ML20236A588
Person / Time
Issue date: 07/20/1987
From: Hawkins E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: James Anderson
ENERGY, DEPT. OF
References
REF-WM-64 NUDOCS 8707280143
Download: ML20236A588 (2)


Text

.

DISTRIBUT10N v

Docket.Eile WM-64 PDR/DCS' WM-64/DLJ/87/07/20/0 "by*

D T01sen JUL to ES7 FMiera, OR LLW Branch, WMLU URF0 r/f URF0:DLJ Docket No. WM-64 040WM064840E James R. Anderson, Project Manager Uranium Mill Tailings Project Office U.S. Department of Energy Albuquerque Operations Office P.O. Box 5400 i

Albuquerque, New Mexico 87115 n

}

Dear Mr. Anderson:

My staff has completed their review of Revision 2 of the Lakeview Remedial Action Inspection Plan (RAIP) and a copy of the memorandum to file containing comments is enclosed.

In summary, we are recommending that the proposed revisions be accepted, except for paragraph 6.2.1.1 which would provide for one classification test out of five to fail the plasticity index (PI) requirement.

We feel that the inclusion of this paragraph is needed only so that the stockpiled soil will be acceptable for radon cover material.

It has still not been established that the: stockpiled soil represents the best reasonably available material for construction of the radon cover.

Without further justification of why soil generally considered poor for engineering projects was selected as cover material, there is no reason to relax design and specifications just to accommodate it.

If it can be demonstrated that more suitable material is not reasonably available, the stockpiled material will be considered and the design of the cover will be evaluated.

This information may have been gathered in the conce phase of the project, and no further exploration may be necessary. ptual 1

J OFC :

................................__J.........:..........__.:.............:............:__.........

NAME :

DATE :87/07/21 8707280143 870720 PDR WASTE WM-64 PDR

~

______m.

n.,

WM-64/DLJ/87/07/20/0 JUL 2 01987

-g.

Should you have any comments or questions, please contact Tom Olsen of my staff at FTS776-2813.

Sincerely, Ro9 Edward F. Hawkins, Chief Licensing Branch 1 Uranium Recovery Field Office Region IV

Enclosure:

As stated n

6 1

1

)

\\o 0FC : URF0

URF

.......L..........:._......_...:._..........:............:....._._...

...g.

NAME : DJacoby

EHawkins

.. _ _ _........../.l DATE. :87/07/20

of#7 #

x s j.