ML20236A231
| ML20236A231 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/08/1989 |
| From: | Adensam E Office of Nuclear Reactor Regulation |
| To: | City of Dalton, GA, Georgia Power Co, Municipal Electric Authority of Georgia, Oglethorpe Power Corp |
| Shared Package | |
| ML20236A235 | List: |
| References | |
| NPF-68-A-019, NPF-79-A-001 NUDOCS 8903160512 | |
| Download: ML20236A231 (8) | |
Text
_ _ - - -. -__ __ -_ _. _ - ___
o UNITED STATES
~,,
NUCLEAR REGULATORY COMMISSION o
E WASHINGTON, D. C. 20555
%...../
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA V0GTLE ELECTRIC GENERATING PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE 1
Amendment No. 19 I
License No. NPF-68 1.
The Nuclear Regulatory Comission (the Comission) has found that:
The app (lication for amendment to the Vogtle Electric Generating Plant, A.
Unit 1 the facility) Facility Operating License No. NPF-68 filed by the Georgia Power Company actir.g for itself, Oglethorpe Power Corpo-ration, Municipal Electric Authority of Georgia, and City of Dalton, Georgia, (the licensees) dated March 6,1989, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
l l
ADO-[,hhhk24 8903160 PDC PDR P
0 l 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-68 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No.19, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. GPC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of March 8, 1989.
FOR THE NUCLEAR REGULATORY COMMISSION Elinor G. Adensam, Acting Assistant Director Division of Reactor Projects I/II I
Office of Nuclear Reactor Regulation l
Attachment:
i Technical Specification Changes l
Date of Issuance: March 8, 1989 i
l l
l
[
l
' 2.
Accordingly, the license is hereby anended by page changes to the Technical Specifications as indicated in the attachment to this license amendment dnd paragraph 2.C.(E) of Facility Operating License No. ' NPF-68 is hereby ar. ended to read as follows:
(2)' Technical Specifications and Environmental Protection Plan 1
The Technical Specifications contained in Appendix A, as revised t
through Amendment No.19, and the Environmental Protection Plan contained in Appendix 0, both of which are attached hereto, are hereby incorporated into this license.
GPC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of March 8, 1989.
FOR THE NUCLEAR REGULATORY COMMISSION S
Elinor G. Adensam, Acting Assistant Director Division of Reactcr Projects I/II Office of. Nuclear Reactor Regulation Attachnent:
Technical Specification Changes Date of Issuance:
March 8, 1989 l
si 0FFICIAL RECORD COPY i
53-bbdd[I-3 LAJD PM:PDII-3 OGC-WJp D. DIl 3 A
f,03q/89 JHopkins:ls nu/
DMatthews EAd am
/89 03/j/89 03/ y,p/89 03/J,pq 03/f/89
E g
f*"*4
,,,,y,,,
[
.g NUCLEAR REGULATORY COMMIS$10N-y, t
WASHINGTON, D. C. 20066 i
...../
f GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA V0GTLE ELECTRIC GENERATING PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 1 License No. NPF-79 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment to the Vogtle Electric Generating Plant, Unit 2 (the facility) Facility Operating License No. NPF-79 filed by the Georgia Power Company acting for itself, Oglethorpe Power Corpo-ration, Municipal Electric Authority of Georgia, and City of Dalton, Georgia, (the licensees) dated March 6,1989, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, as amended, the provisions'of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) 'that the activities authorizad by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
i 1
l
}
. 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-79 is hereby amended to read as follows:
(2). Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 1, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. GPC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendnient is effective as of March 8, 1989.
FOR THE NUCLEAR REGULATORY COMMISSION i
^
Elinor G. Adensam, Acting Assistant Director Division of Reactor Projects I/II i
Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance:
March 8, 1989
. 2.
' Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. NPF-79 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 1, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license.
GPC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of March 8, 1989.
FOR THE NUCLEAR REGULATORY COMW.>SION Elinor G. Adensam, Acting Assistant Director Division of Reactor Projects I/II Office of Nuclear Reactor Regulation Attachnent:
1 Technical Specification Changes 1
Date of Issuance:
March 8, 1989 l
l l
l 1
f i
0FFICIAL RECORD COPY j
OGC-k%h Dil-3 DRO LA[ JI-3 M:PDII-3 Riio JHopkins:ls h\\ g DNatthews E en am 03/ /89 03/g/89 03/7/Ih 03/{/89 03/ /89 I
1 1
i
l I
l:
l l:
ATTACHMENT TO LICENSE AMENDMENT NO. 19 FACILITY OPERATING LICENSE NO.'NPF-68 AND LICENSE AMENDMENT NO. 1 FACILITY OPERATING LICENSE N0. NPF-79 DOCKET NOS. 50-424 AND 50-425 Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised page is identified by Amendment number and contains a vertical line indicating the area of change. The corresponding overleaf page is also provided to maintain document completeness.
Amended Page Overleaf Page 3/4.5-6 3/4 5-5 i
l I
i I
a EMERGENCY CORE COOLING SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) h.
By performing a flow balance test, during shutdown, following com-piction of modifications to the ECCS subsystems that alter the subsystem flow characteristics and verifying that:
1)
For centrifugal charging pump lines, with a single pump running:
a)
The sum of the injection line flow rates, excluding the.
highest flow rate, is greater than or equal to 284 gpm, and b)
The total pump flow rate is less than or equal to 550 gpm (Unit 1) or 555 9pn (Unit 2),
2)
For Safety Injection pump lines, with a single pump running:
a)
The sum of the injection line flow rates, excluding the highest flow rate, is greater than or equal to 406 gpm, and b)
The total pump flow rate is less than or equal to 660 gpm.
3)
For RHR pump lines, with a single pump running, the sum of the injection line flow rates is greater than or equal to 3788 gpm.
l
)
V0GTLE UNITS - 1 & 2 3/4 5-6 Anendment No. 10 Unit 1
?.nendment No. 1 Unit 2