Forwards CEN-382(B)-NP, Verification of Acceptability of 1-Pin Burnup Limit of 30 Mwd/Kg for Calvert Cliffs Units 1 & 2, Per Request.Rept Supports Unit 2 Cycle 9 Reload Analysis
ML20236A088
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 03/03/1989
From: Lippold W
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20236A091 List:
References
NUDOCS 8903160364
Download: ML20236A088 (1)


Text

, '.

. .. 4 BALTIMORE GAS AND ELECTRIC N

CHARLES CENTER . P.O. BOX 1475 BALTIMORE. MARYLAND 21203 NUCLEAR ENGINEERING SERVICES DEPARTMENT CALVERT CUFFS NUCLEAR POWER PLANT LUSBY. MARYLAND 20657 March 3,1989 l

l U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Additional Information Needed to Sunoort Unit 2 Cvele Reload

REFERENCE:

(a) Letter from Mr. G. C. Creel (BG&E) to NRC Document Control Desk, dated February 7,1989, Unit 2 Ninth Cycle License Application Gentlemen:

As requested, we are providing a copy of the non-proprietary version of CEN-382(B)-NP, Verification of the Acceptability of a one-pin Burnup Limit of 60 MWD /kg for Calvert Cliffs Units I and 2. This report supports the Unit 2 Cycle 9 reload analysis presented in Reference (a).

Should you have any further questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, W. James Lippold General Supervisor Technical Services Engineering WJL/ PSF / dim o 00.

88 Attachment os u7

  • O kk cc: (Without Attachment)

$f D. A. Brune, Esquire (d ro o J. E. Silberg, Esquire h0 O@

o R. A.Capra, NRC g S. A.McNeil, NRC oct W. T. Russell, NRC [ 0(k

$$a V. L. Pritchett, NRC -

_ _ _ _ _ _ . _ . _ _ __