Application for Amend to License NPF-1,revising Tech Specs to Allow Operability Check of Auxiliary Feedwater Pumps at Low Steam Pressure & to Clarify Points Re Control Room Emergency Ventilation Sys & Containment Isolation Valves
ML20236A052
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 03/13/1978
From: Goodwin C
PORTLAND GENERAL ELECTRIC CO.
To:
Shared Package
ML20236A040 List:
References
TAC-07457, TAC-7457, NUDOCS 8710210355
Download: ML20236A052 (3)


Text

- - _ - - _ .

.s .

n 3

PORTLAND GENERAL ELECTRIC COMPANY EUGENE WATER & ELECTRIC BOARD AND PACIFIC POWER & LIGHT COMPANY TROJAN NUCLEAR PLANT Operating License NPF-1 l Docket 50-344' License Change Application 44 This License Change Application is submitted in support of Licensee's l request to revise specific surveillance requirements in the Trojan Technical Specificaticas (Appendix A to Operating License NPF-1) l regarding the Auxiliary Feedwater Pumps, Control Room Emergency Ventila-tion System, and Containment Isolation Valves.

PORTLAND GENERAL ELECTRIC COMPANY By i

]

C. Goodwin, Jp'(  ;

Assistant Vice President  !

Thermal Plant Operation and Maintenance l f

! Subscribed and swcrn to before me this 13th day of March 1978.  !

)

i l '

ed k 4Wn Notary Public of Or'egon My Commission Expires : mf ((ff '

  1. \

l 1

1 I

I 8710210355 780313 P0fL ADOCK 05000344 d

PtR.

. - _ - ._ __ _J

LCA 44

<Pags 1 of 2 LICENSE CHANGE APPNCAil"0N 44

1. Standard Technical Specification 4.7.1.2.1.a. of Page 3/4 7-5:

The minimum steam pressure at which the steam-driven auxiliary feedwater pump can be adequately tested should be raised from 200 psig to 275 psig and the discharge pressure on recirculation should be increased from 1470 psig to 1580 psig. .,

1

2. Standard Technical Specification 4.7.6.1.a.'of Page 3/4 7-18:

Control Room Emergency Ventilation System, the paragraph should -l specify the preheater as ON during surveillance testing. The intent of the specification is to regulate the relative. humidity of air passing through. the charcoal filter bed and this is met with preheat coils on. ,

3. Standard Technical Specification 3.6.3.1 of Page 3/4 6-22; Contain- f ment Isolation Valves, the following valves should be footnoted to indicate that they may be exempted from being closed:

1 l MO-2069A and M0-2069B - SIS recirculation sump -

open in all modes.

Proposed replacement . pages for the above changes .are provided as Attachment A to this LCA.  !

l l

l' REASON FOR CHANGE

1. The minimum allowable auxiliary feedwater pump discharge pressure specified in Technical Specification 4.7.1.2.1.a. is actually the design discharge pressure at design flow and design operating conditions. The discharge pressure expected when operating on recirculation flow is in excess of 1700 psig. Since the pumps are to be tested on recirculation flow, the minimum allowable discharge pressure should be >93 percent (per ASME Section XI) of nominal. design discharge pressure on recirculation which is approximately 1580 psig.

Experience in operational testing of the steam-driven auxiliary feedwater pump has shown that steam pressures <275 psig are insuff t-cient to develop a discharge pressure that is indicative of pump capability, operability, or performance. Furthermore, although the pump is operable at steam pressures <800 psig, it is difficult to correlate actual pump performance with that expected by turbine pump curves. Therefore, since it- is desirable to tes t the steam-driven auxiliary feedwater pump at. steam pressures >800 psig and not always  ;

possib?e to accomplish, it is proposed to test it in two phases if j the plat.t is in the process of starting-up and the 31-day test '

interval has elapsed. This will allow an overall operability check [

of the pi.mp and turbine driver at low steam pressures (>275 psig).

and a performance evaluation test as soon as possible after reaching 800 psig steam pressure.

_ - - . - - - - - - - - -_--_ l

' LCA 44 Pago 2 of 2 s

LICENSE CHANGE APPLICATION 44 REASON FOR CHANGE (Concluded)

2. The purpose of Technical Specification 4.7.6.1.a. is to demonstrate

' the operability 'of the Control Room Emergency Ventilation Sys tem.

This system has both preheaters, for regulating the relative humidity of the air prior to passing through the charcoal adsorbers, and af ter heaters, for maintaining proper temperature in the control-room. The af ter heaters are only necessary for habitability; the preheaters are necessary to prevent exhaustion of the charcoal adsorbers due to excessive moisture in the air. Proper operability of the Control Room Emergency Ventilation System-then is dependent only upon proper operation of the preheaters regardless of the operation of the af ter heaters. The wording of this specifica-

~

tion (4.7.6.1.a.) is not clear which heaters are to be energized for the 10-hr test. This change will clarify that point.

3. Amendment 20 to the Trojan FSAR specified that valves M0-2069A and M0-2069B, Containment Sump SIS Recirculation Trains A and B, I respectively, must be open in all modes of operation. By adding

! the described footnote to Table 3.6-1, the Technical Specifications l

are clarified to incorporate this requirement.

l l

l SAFETY EVALUATION l l

These proposed changes have been determined to not constitute an unre- )

viewed safety question nor change or alter the consequences or probability )

of an accident previously considered. Furthe rmore , it has been determined that no new accidents are created.

The change proposed by Item 1 involves improved means to demonstrate the operability of the auxiliary feedwater pumps. It clarifies the steam pressures at which the steam-driven auxiliary pump is physically able to be tested with meaningful results.

Changes proposed by Items 2 and 3 involve clarification of specific concerns relative to the respective sys tems. There is no change to the intent of either Technical Specification.

SCHEDULE CONSIDERATIONS Since these changes are of an editorial nature, it is exp( cted that diey could be acted upon in a reasonable amount of time or by August 1, 1978.