ML20235Z270

From kanterella
Jump to navigation Jump to search
Forwards Revised Restart Rept for Rancho Seco Nuclear Generating Station Following 851226 Overcooling Event, for Use in Generating Ser.Rept Will Be Base Document from Which Restart Action Plan Rept Will Be Developed
ML20235Z270
Person / Time
Site: Rancho Seco
Issue date: 07/20/1987
From: Andognini G
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Miraglia F
Office of Nuclear Reactor Regulation
Shared Package
ML20235Z272 List:
References
GCA-87-227, NUDOCS 8707270247
Download: ML20235Z270 (3)


Text

-

7 p ; n... -

7"~ 1 r-<a E'_ ' >,

s 5

h [5ACRAMENTO MUNICIPAL UTILIT( DISTR!CT D P. O. Box 15830, Sacramento CA 95852-1E'30, (916) 452-3211

. i' AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA g 2 0 1987

-( .,

i GCA 87-227 3  !!.' E. Nur: lear Regulatory Commission

, , Attnf . Frank J. Miraglia, Jr.

Asacciate Director for Projects Phflips B1dg. -

.7926 Norfolk Avenue-Bethest'a; MD 20014 DOCKET 50-312 RANCilo SECO WELEAR GENERATING STATION UNIT #1 RESTART ' ACTION P1AN REPORT

Reference:

Letter from J. E. Ward to F. Miraglia dated December 15, 1987 '

Dear Mr. .Miraglia:

The District has reviewed the Restart Report (referenced) and has updated it to reflect those changes which have occurred since its issue. This revised report will be the base document from which the Restart Action Plan Report

!! , L(RAPR) will be dev11cped. The RAPR document will incorporate the Restart Report (attached), Rancho Seco Action Plan and the restart scope list. It is intended to provide a single source of information for use in determining the District's plan for restarting Rancho Seco.

~

' The update to the Restart Report is provided to the staff for use in the generation of the staff's Safety Evaluation Report. ifnen the restart scope list has been assembled and verified, it will be incorporated into the RAPR for subinittal to the NRC as described above. If there are any questions pertaining to this 9estart Report update or the RAPR document, please contact Karl Meyer of ry staff.  !

Sincera1y, I An g Chief Executive Officer, Huclear  !

L -

Attachment j 4

)

cc: G. Kalman, NRC, Bethesda (2) ,

J. B. Martin, NRC, Region V

, A. D' Angelo, NRC, Rancho Seco o a 0707270247 ADOCK 97

$2 /

\

\

PDR PDR ,

S RANCHO sECO NUCLEAR GENERATING STATION O 1444o Twin Cities Road, Herald, CA 95638 9799;(209) 333 2935

)

%20 W GCA 87-227 Frank J. Miraglia, Jr. bc: General Manager MS 41 Chief Executive Officer, Nuclear MS 209 (2)*

AGM, Nuclear Power Production MS 254

- Directo", Technical Se vices MS 206A l

- Director, Nuclear, Adm. Services MS 213 i Restart Impleinentation Manager MS 206 )

Plant Modifications MS 201  ;

- Manager, Nuclear Training MS 296  !

Manager, Nuclear Licensing MS 286

- Manager, Nuclear Engineering MS 208-6 l Support Services Manager MS 270  ;

-Executive Assistant MS 207 Manager, Env. Protection MS 16

- Public Infonnation MS 204 l

- Quality Assurance MS 271 1 Manager Technical Support MS 254 Manager Maintenance MS 2S4 Plant Support Eng. Manager MS 208-6 Manager Operations MS 255 Reg. Comp 1. Superintendent MS 286 Incident Analysis Group MS 298 NAC (5) MS 209  ;

F. Burke (B&W)

Fourth Floor Fiies MS 43 Licensing Files MS 286 RIC Files MS 224

  • 1 w/atch + 1 w/o atch JKA/dpn

SA,CRAMENTO MUNICIPAlmUTILITY DISTRICT OFFICE MEMORANDUld TO: ' Distribution DATE: Jun'e 18,1987

' FROM: C. Carl Andognini Y

sus.lEc'r: RESTART REPORT /

The 6ttached copy of the Restart Report has been sent to the NRC. It is provided to'you for your use, information, and distribution.

Attachment Distribution:

W. K. L'atham Board Members-(5)

.D. Kaplan J. P. O'Hanlon A. C.'Gehr D. Montgomery R. C. DeYoung, Jr. P. Herbert B. Bibb R. Martinez

- G. Ke man (?) - T. D'Angelo G. Ferez C. Myer G. Coward G. Cranston (6)

.B. Crosby R. Huebner (6)

S. Knight (6) R. Lawrence D. Martin T. Robertson (6)

B. Croley (6) K. Shearer /B. Thomas J. Shetler J. Vinquist P. Turner /F. Gowers (6) 4th Floor Files L.'Fossum D. Whitney-