Forwards Integrated Assessment Team Insp Repts 50-277/89-81 & 50-278/89-81 on 890203-17.Team Concluded W/High Confidence That Util Mgt Controls,Programs & Personnel Performing at Level to Support Safe Startup & Operation of Plant
ML20235Z243
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/06/1989
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Corbin McNeil
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20235Z246 List:
References
NUDOCS 8903150252
Download: ML20235Z243 (3)


See also: IR 05000277/1989081

Text

_.

_ - _ - _ _ - -

.

(

!

06 MAR 1989

Docket No. 50-277

50-278

Philadelphia Electric Company

ATTN: Mr. C. A. McNeill

Executive Vice President - Nuclear

Correspondence Control Desk

Philadelphia, PA 19101

Gentlemen:

Subject:

INTEGRATED ASSESSMENT TEAM INSPECTION 50-277/89-81; 50-278/89-81

This letter transmits the findings of the Integrated Assessment Team Inspection

(IATI) led by Mr. J. Linville of this office on February 3 - 17, 1989 at the

Peach Bottom Atomic Power Station (PBAPS), Delta, Pennsylvania.

The results

were discussed with you and others of your staff at the conclusion of the

inspection.

s

The purpose of this team inspection was to perform an independent, in-depth

assessment of the readiness of management controls, programs, and personnel

to support safe restart and operation of the facility.

The inspection team

performed an integrated evaluation of various functional areas including

site management / operations, licensed operator resource development, station

cultural changes, corporate oversight, radiation protection, maintenance /

surveillance, engineering / technical support and security. Within these

areas, the inspection consisted of interviews with personnel, observations

of plent activities, and examinations of procedures, records, and documents by

the inspectors.

Within the scope of its review, the team concluded with high confidence

that Philadelphia Electric Company (PECo) management controls, programs,

and personnel are performing at a level to support safe startup and operation

of the facility. Those technical items requiring resolution or completion prior

to restart are being addressed and tracked by PECo. The team identified a

relatively small number of additional items for which actions or evaluations

are needed; PEco has made commitments in those areas, as detailed in section

2.4 of the enclosed report. As a result of onis inspection, the team concluded

that there are currently no fundamental flaws in PEco's management structure,

management performance, programs, or program implementation that would inhibit

its ability to assure reactor or public safety during plant operation,

l

0FFICIAL RECORD COPY

PB IATI RPT - 0001.0.0

8903150252 890306

PDR

ADOCK 0500027e

03/06/89

o

PDC

,

{

'

ol'

(

_ _ _ _ _ .

-

J

---

____ _

. _ _ - _ - _ _ _ - _ _ - - _ _ . .

_ _ _ _ _ _

-

_.

_ _ _ _ _ _

1

.

O

Philadelphia Electric Company

2

06 MAR 1989

If your understanding of ary matter discussed in the enclosed report differs

from that stated, please contact Mr. Linville or me promptly.

Please inform us

in writing within 30 days of the status of those commitments detailed in Section

2.4 of the enclosed report. Subsequent periodic responses are also requested

in section 2.4.

The NRC will review the status of these issues prior to any

restart of PBAPS. The results of this team inspection will be one of the

principle considerations of the NRC staff's deliberations as it develops its

decision regarding a PBAPS restart recommendation to the Commission.

. In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosures will be placed in the Public Document Room. The response

requested by this letter and the accompanying notice are not subject to the

clearance procedures of the Office of Management and Budget as required by

the Paperwork Reduction Act of 1980, PL 96-511.

Your cooperation is appreciated.

Sincerely,

William F. Kane, Director

Division of Reactor Projects.

Enclosure:

Inspection Report 50-277/89-81; 50-278/89-81

cc w/ enc 1:

' John S. Kemper, Sr., Senior Vice President-Nuclear

Jack Urban, General Manager, Fuels Department, Delmarva Power

D. M. Smith, Vice President, Peach Bottom Atomic Power Station

J. W. Gallagher, Vice President, Nuclear Services

E. C. Kistner, Chairman, Nuclear Review Board

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic

Electric

B. W. Gorman, Manager-External Affairs, Public Service Electric & Gas

Company

J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station

Troy B. Conner, Jr., Esquire (Without Report)

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations

W. M. Alden, Director, Licensing Section

Doris Poulsen, Secretary of Harford County Council

Dane Honan

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

OFFICIAL RECORD COPY

PB IATI RPT - 0001.0.1

03/06/89

_ _ _ _ - _ - _ _ _ _ _ _ _ _ _

--

_

_

- - _ _

- _ _ - - - - - - - - _ _ - - - - _ _ _ - _ - - - _ _ _ _ _ _ - - _ - - - - - _ _ _ _ - - _ _ _ _ - -

.

(.u

,

Philadelphia'El'ectric Company

3

06 VAR 1989

bec w/ enc 1:

l

Re'gion I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

J. C. Linville Section Chief, DRP

~

PA0 (2) SALP Reports Only + All Inspection Reports

Robert.J. - Bores, DRSS

<

M. Shanbaky, Chief, FRPS, DRSS

SRI, Limerick I

Karl Abraham, Public Affairs Officer (2)

R. E. Martin, Project Engineer, NRR

!

B. Boger, NRR-

W. Regan, NRR

.

J. Schoenfeld, NRR

D.'Morrisseau, NRR

R. Gallo, DRS

R. Bellamy, DRSS

-

W.'Schmidt, DRP-

G. Meyer,'DRP

D. Caphton, DRS

' D. Florek, DRS ,

L

RI 'D

R

RP

P

fDRP

RP

Myer

Urban

ohnson

1111ams

inville

nger

3/h/89

3/h/89

3/f/89M3/

3/h/89

3/ /89

3/6/89

89

0FFkCIALRECORDCOPYPB IATI PT - 0002.0.0

03/06/89

_ _ _ _ _ _ _ _ _ - _ _ _ _ _

_