06 MAR 1989
Docket No. 50-277
50-278
Philadelphia Electric Company
ATTN: Mr. C. A. McNeill
Executive Vice President - Nuclear
Correspondence Control Desk
Philadelphia, PA 19101
Gentlemen:
Subject:
INTEGRATED ASSESSMENT TEAM INSPECTION 50-277/89-81; 50-278/89-81
This letter transmits the findings of the Integrated Assessment Team Inspection
(IATI) led by Mr. J. Linville of this office on February 3 - 17, 1989 at the
Peach Bottom Atomic Power Station (PBAPS), Delta, Pennsylvania.
The results
were discussed with you and others of your staff at the conclusion of the
inspection.
s
The purpose of this team inspection was to perform an independent, in-depth
assessment of the readiness of management controls, programs, and personnel
to support safe restart and operation of the facility.
The inspection team
performed an integrated evaluation of various functional areas including
site management / operations, licensed operator resource development, station
cultural changes, corporate oversight, radiation protection, maintenance /
surveillance, engineering / technical support and security. Within these
areas, the inspection consisted of interviews with personnel, observations
of plent activities, and examinations of procedures, records, and documents by
the inspectors.
Within the scope of its review, the team concluded with high confidence
that Philadelphia Electric Company (PECo) management controls, programs,
and personnel are performing at a level to support safe startup and operation
of the facility. Those technical items requiring resolution or completion prior
to restart are being addressed and tracked by PECo. The team identified a
relatively small number of additional items for which actions or evaluations
are needed; PEco has made commitments in those areas, as detailed in section
2.4 of the enclosed report. As a result of onis inspection, the team concluded
that there are currently no fundamental flaws in PEco's management structure,
management performance, programs, or program implementation that would inhibit
its ability to assure reactor or public safety during plant operation,
l
0FFICIAL RECORD COPY
PB IATI RPT - 0001.0.0
8903150252 890306
ADOCK 0500027e
03/06/89
o
,
{
'
ol'
(
_ _ _ _ _ .
-
J
---
____ _
. _ _ - _ - _ _ _ - _ _ - - _ _ . .
_ _ _ _ _ _
-
_.
_ _ _ _ _ _
1
.
O
Philadelphia Electric Company
2
06 MAR 1989
If your understanding of ary matter discussed in the enclosed report differs
from that stated, please contact Mr. Linville or me promptly.
Please inform us
in writing within 30 days of the status of those commitments detailed in Section
2.4 of the enclosed report. Subsequent periodic responses are also requested
in section 2.4.
The NRC will review the status of these issues prior to any
restart of PBAPS. The results of this team inspection will be one of the
principle considerations of the NRC staff's deliberations as it develops its
decision regarding a PBAPS restart recommendation to the Commission.
. In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosures will be placed in the Public Document Room. The response
requested by this letter and the accompanying notice are not subject to the
clearance procedures of the Office of Management and Budget as required by
the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation is appreciated.
Sincerely,
William F. Kane, Director
Division of Reactor Projects.
Enclosure:
Inspection Report 50-277/89-81; 50-278/89-81
cc w/ enc 1:
' John S. Kemper, Sr., Senior Vice President-Nuclear
Jack Urban, General Manager, Fuels Department, Delmarva Power
D. M. Smith, Vice President, Peach Bottom Atomic Power Station
J. W. Gallagher, Vice President, Nuclear Services
E. C. Kistner, Chairman, Nuclear Review Board
W. H. Hirst, Director, Joint Generation Projects Department, Atlantic
Electric
B. W. Gorman, Manager-External Affairs, Public Service Electric & Gas
Company
J. F. Franz, Plant Manager, Peach Bottom Atomic Power Station
Troy B. Conner, Jr., Esquire (Without Report)
Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)
Raymond L. Hovis, Esquire (Without Report)
Thomas Magette, Power Plant Siting, Nuclear Evaluations
W. M. Alden, Director, Licensing Section
Doris Poulsen, Secretary of Harford County Council
Dane Honan
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
OFFICIAL RECORD COPY
PB IATI RPT - 0001.0.1
03/06/89
_ _ _ _ - _ - _ _ _ _ _ _ _ _ _
--
_
_
- - _ _
- _ _ - - - - - - - - _ _ - - - - _ _ _ - _ - - - _ _ _ _ _ _ - - _ - - - - - _ _ _ _ - - _ _ _ _ - -
.
(.u
,
Philadelphia'El'ectric Company
3
06 VAR 1989
bec w/ enc 1:
l
Re'gion I Docket Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
J. C. Linville Section Chief, DRP
~
PA0 (2) SALP Reports Only + All Inspection Reports
Robert.J. - Bores, DRSS
<
M. Shanbaky, Chief, FRPS, DRSS
SRI, Limerick I
Karl Abraham, Public Affairs Officer (2)
R. E. Martin, Project Engineer, NRR
!
B. Boger, NRR-
W. Regan, NRR
.
J. Schoenfeld, NRR
D.'Morrisseau, NRR
R. Gallo, DRS
R. Bellamy, DRSS
- -
W.'Schmidt, DRP-
G. Meyer,'DRP
D. Caphton, DRS
' D. Florek, DRS ,
L
RI 'D
R
P
fDRP
Myer
Urban
ohnson
1111ams
inville
nger
3/h/89
3/h/89
3/f/89M3/
3/h/89
3/ /89
3/6/89
89
0FFkCIALRECORDCOPYPB IATI PT - 0002.0.0
03/06/89
_ _ _ _ _ _ _ _ _ - _ _ _ _ _
_