T4f5 M
2NRC-7-174 Beaver Valley No. 2 Unit Project Organization b
Ext.160 Teiecopy 4 )
S.E.G. Building P.O. Box 328 July 10, 1987 Shippingport, PA 15077 United States Nuclear Regulatory Commission ATTN:
Document Cortrol Desk Washington, DC 20555
SUBJECT:
Beaver Valley Power Station Unit No. 2 Docket No. 50-412 IE Bulletin 80-06 Concerns SER Confirmatory Item #28 Gentlemen:
As required by IE Bulletin 80-06, DLC has completed test P0-2.01A.04.
This test revealed that all safety-related components remained in their safety state after the engineered safety features (ESF) actuation system logic had been reset.
DLC considers this matter closed.
If you should have any questions, please call Mr. A. N. DiCesaro at (412) 393-7742.
DUQUESNE LIGHT COMPANY
/
'/
By
~
f L/CErey /
Serio{rVicePresident AND/ijr IV/AND/SER/28 AR/NAR cc:
Mr. P. Tam, Project Manager Mr. W. T. Russell, fRC Region I Administrator Mr. J. Beall, NRC Sr. Resident Inspector Mr. L. Prividy, tRC Resident Inspector INP0 Records Center l
l I
B707240230 870710 PDR ADOCK 05000412 o