ML20235X303
| ML20235X303 | |
| Person / Time | |
|---|---|
| Issue date: | 10/16/1987 |
| From: | Merschoff E Office of Nuclear Reactor Regulation |
| To: | Craig T JOHNSTON PUMP CO. |
| References | |
| REF-QA-99901023 NUDOCS 8710190293 | |
| Download: ML20235X303 (3) | |
Text
_ _ _ _. _ _ _
l
- gs>R **:vq'o
. UNITED STAYES g
'b 8
NUCLEAR REGULATORY COMMISSION o
^h' WASHINGTON, D. C. 2M55 l
October 16, 1987-Docket No. 99901023 l
Johnston Pump / General Valve Incorporated ATTN: Mr. Tommy Craig Quality Assurance Manager 2601 East 34th Street Chattanooga, TN 37407 i
j Gentlemen:
l Your letter to me dated June 26, 1987, requested the Commission's response to the following question:
1 "When a utility imposes the provisions of 10 CFR 21 in a purchase 1
l-order for pumping equipment or finished parts thereof, specified by the utility as Nuclear Safety Related, is the Contractor l-obligated to pass on the same provisions to subsuppliers of raw or finished items that the Contractor's Engineers have determined to be non-critical to equipment operability, or whose failure will not result in imediate catastrophic failure of the pump or in the l
case of an installed pump component, the entire assembly?"
j The requirements of Section 21.31 of 10 CFR Part 21 state that the regulation must be specified in procurement documents for a basic component. A basic I
component is a part or component defined in Section 21.3.(a) of CFR Part 21 and includes pressure retaining material constructed in accordance with Section l
III of the ASME Code or identified by the customer as " safety related." For i
those components which do not satisfy the definition of basic component in i
Section 21.3(a) of Part 21 or the customer does not specifically call out the application of Part 21, the requirements of 10 CFR Part 21 do not have to be i
passed on'to subtier vendors. However, if the customer calls out the applica-tion of Part 21 the requirements must be passed down even though the Contractor's Engineers have determined the items to be non-critical to equipment operability, i
or whose failure will not result in immediate catastrophic failure of the pump.
l If you have any questions on the NRC's position on this subject, you may contact JimStone(301-492-9661) of the Vendor Inspection Branch or Chip Cameron (301-492-8689) of the Office of the General Counsel of the NRC.
Sincerely,
).f
/
Ellis W. Merschof,, Chief I
go190293871016 Vendor Inspection, Branch 99901k$99 ENWOHPC Division of Reactor Inspection and Safeguards PDR Office of Nuclear Reactor Regulation i
k y
[,h _' h
- '. f.
(! t N
!Johnston Pump / General Valve, USNRC-DS 2 -
Incorporated September.16, 1987:
W10CT19 A D13
-r
) DISTRIBUTION:
'2455 Code-IE:09
-VIB. Reading-
+'
DRIS Reading.
'JPartlow BGrimes EMerschoff JStone.
LJConway.
2
.g I
i I
.i L
f0 i
/
i;0 OGc/c Cow,m RIS 0FC
- VID: RI 5 --
- 5C/ vip:DRIS
- bC 6-. -.:
- /- :-(1..
0 6 :------------:----------.-:--------
h6ff :@
L N/41E.:J y:tt
- JStone
(--------:fht.28---::.----------::---.-------::--------
% OCamm>,g DATE :i 11 7
- T /21/87
- /o/ 0/87
\\_)
l/e/fr 7
m:
>r-
.),
','J' l
e 4
11
./
- y l),/
.t 4
If il
..).
,'_l'
_ Johnston' Pump /GeneralIalve, i
! Incorporated September 16, 1987 ia c
l s
.y,J '
DISTRIBUTION:-
RIDS Code II:09
+
~#
VIB Reading DRIS Reading JPartlow BGrimes EMerschoff
'I JStone JConway i
c i
~,.
4 1
I 4
OGC/C,Cawren OFC :VID: RIS
- 5C/ vip:DR15 :bC RI : ( g*,
.:..:..[h*1em...................................
............:......v.\\.....:
N/41E :J y:tt
- JStond E.f....ff....:.px7d....::............::............:........
.....:d 11 DATE :
7
- 1 /at/87
- /o/ 0/87
- W dContervn:
\\.)
"ye/rr7