Advises That Util Expects to Respond to Generic Ltr 87-12 Concern,Re Loss of RHR Leading to RCS Pressurization & Potential Ejection of Coolant Via Cold Leg Opening,By 871116.Time Needed to Review C-E Final Rept on Subj
ML20235X003
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 10/13/1987
From: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GL-87-12, NUDOCS 8710190161
Download: ML20235X003 (2)


Text

.

x v

i M

l Ne f

4 jf.

s ' g' '

V ?/ '

1 *-

.p MI

p e

r eACTIMORE

  • i k

'f hb-

.SOEcNiEl VuhNRC-D'S

~i f...

SOCI.19 A O ILt-r s-1 CHARLES CENTER < P. O. BOX 1475 BALTIMORE, MAP)l' AND 21203 -

}i ).

't s% 4 5,

s

[

JostPH A.TirrM29

'\\

vice Passiout(. T t.'.

NUCLEAR ENtn0Y, # j}', f 4

a.

October 13,~1987 s

t:

-)

i U. S. Nuclear Regulatory Commission Washington, DC 20555 y

s s

' ATTENTION:

. Document Con'tro'.Tysk i

SUBJECT:

Calvert CIiIfs Ncch. ear Power Plant Unit Nos.1 & 2; l'dcket Nos. 50-317 & 50-318 Response to Generic Leiter 87-12. " Loss of Residual IIcat Removal Whi'le-4

' h the Reactor Coolant Svilqd.i2. Partially filled" (a) Letter from Mr. J. A. Tierna(u (f(G&E) to NRC Document Control Des

~

s.\\ Y Q

REFERENCES:

dated September 14, 1987, mmi(s<ibject t

't s

(b) Telephone cong$rsaVon betdeeir Mr.

R.

A.

Capra (NRC) and Mr L.' S. Lyragoite!(BG&E), October 5,1987, same subject

$' [ %l4 q',\\

. Gentlemen:

q

.f 3

a

<d weric' Letter' 87-12' (Reference a), we pro <,ided a description of in our response to (i} operation Calvert Cliffs' plant during the approach s.to, and viith, a partially filled Reactor Coolant' %ystem (RCS). In addition, we statev lthat ' we 'were' working with the j

Combustion' Engineering Owners Group to review-one concern prevented in the Generic Letter, Specifically, the concern is a loss of res? dual heat remov;at (RiiR), leading to i

.RCS pressurization and pokniial eNetiou^,0f coolant via a cold leg opening (e.g.,

maintenance on iNReactor Coolant Pump seal assembly).

We will not receive Cortbustion E93ineering's final report, which qualitatively assesses this scenario, any earlieg than the end of October. As discussed in Reference (b), we expect to, pro 4ide our gesponse to t)id concern by November 16, 1987 This will allow approximately two weeks for rehw of the final report.

',')

')

Should you have any que't;ons't'egarding this matter, we will be pleased to discuss them with yoe.

i Very truly yogrs,

e y

b~

1 JAT/LSL/ dim mmme 3

P s

t.

Document Control Desk

. October 13, 1987 Page 2 cc:

D. A. Brune, Esquire J. E.

Silberg, Esquire R. A.Capra, NRC S. A.McNeil,NRC W. T. Russell, NRC T. Foley/D. C. Trimble, NRC l