ML20235W672

From kanterella
Jump to navigation Jump to search
Rev 2 to 861222 Application for Rev to Certificate of Compliance 9019,demonstrating Model BU-7 Compliance W/ 10CFR71 Requirements.Rev Consists of Replacement Pages 15-21 to Original Submittal
ML20235W672
Person / Time
Site: 07109019
Issue date: 09/29/1987
From:
GENERAL ELECTRIC CO.
To:
Shared Package
ML20235W644 List:
References
NUDOCS 8710160353
Download: ML20235W672 (9)


Text

_ _ _

GENERAL $ ELECTRIC O

l l

I

\\

l l

ATTACHMENT 2 PAGE CHANGES TO THE 12/22/86 BU-7 SHIPPING PACKAGE SUBMITTAL.

THESE REPLACEMENT PAGES ARE IDENTIFIED AS REVISION 2.

O pataanBliTu'

_e

L E: -

w-.

s

y.

5.0 OPERATING' PROCEDURES, ACCEPTANCE TESTING AND MAINTENANCE L

fPROGRAM 5.1-OPERATING PROCEDURES

The following procedures represent the ' activities involved in loading - the BU-7 package.

5.1 1' Priorf to placing the ' three or five gallon. pails in the q

BU-7's. inner drum, the pails are inspected.

This inspection ' incl udes :

o. Physical integrity (no holes, broken seals, or cracks) o No excessive ' rust o

Proper fitting lids e

No dents great.er than 1/2 inch deep I

o Unbroken tampersafe seals are in place l

5.1.2 Prior to loading, BU-7 inner drums are inspected to i

assure:

i

+

o There are no visible cracks J

o There is no visible moisture inside container 1

o Inner drwn gasket surfaces are visibly clean, smooth and flat with no holes except bolt holes j

LICENSE SNM-1097 DATE 09/29/87 PAGE

(~ }]

DOCKET 71-9019 REVISION 2

15 -

)

a u y-

'I wb 1

r cV, 1

o'

' Inner ~ drum is visibly : clean, cpainted, and.withL no' l [\\_/

^

~

1 rust spots larger. than 1. square inch o

Ii 01 Bolts or studs are in good condition o'

Inner container cover is clean, flat, dry, painted,

no rust. spots larger than one square inch, and gasket 1 f

surf ace visibly smooth. and flat 5.1.3-Prior to loading BU-7, outer drums are inspected to assure:

o Exterior. paint' is in good condition o

Container is durably marked o:. There are no visible. holes, punctures, or cracks

~

(~{

o Closure rings and bolts are in good condition o

The four 1/4 inch holes are covered from the inside

-with water-proof tape I

o No visible dents greater than 1/2 inch deep i

o Phenolic Foam plug in good condition i

o Outer drum cover in good condition with no holes or cracks LICENSE SNM-1097 DATE 09/29/87 PAGE

' DOCKET 71-9019 REVISION 2 '

}.

N q.

Q' l

~BU-7. drums are packed as follows:,

5.1.4-

.:l, -j !

U o

Three 3-gallon-or two 5-gallon. pails are placed in' side inner' drum h

.l

\\

l c..

'o Place gasket in position o

Bolt inner; 1id..in po'sition. using ' a minimum torque of 12.5 ft. lbs.

L o-Insert insulation plug

'o.

Install cover and secure. closure ring with bolt and

~

nut'

.i

'o-Affix tampersafing seal to the~ bol't o.

The maximum. weight of material per drum is. verified.

.',O

' Limits are based upon the' quantities authorized by.-

' wr.

the certificate of compliance.

I 5.2 ACCEPTANCE TESTING i

The following represent the tests or inspections that are performed prior to the first use' of packaging :

i l

l LICENSE SNM-1097 DATE 09/29/87 PAGE DOCKET 71-9019 REVISION 2.

m

-_-__i_____._.____m.

_, y i

i

'J=

79 f{l c 5. 2 ' 1.,

Inspection Criteria

~

y~D.,..

,^'

Typical Typical

,)

Container Characteristic' Inspection Specifications

. Phenolic Plug-

_15 lbs. ' minimum ~ weig ht of Pl ug Submerged bubble pressure 15' PSIG' minimum I

test for the inner container.

Leak tightness is verified by a submerged bubble pressure test at115.0 PSIG, minimum.. Submersion : time is one minute minimum.

Test is conducted using the silicone rubber container gasket 'as the only seal'ing j()

agent, between' flange and Cover.

Verification of Based on approved f

container measurements dimensions on licensed drawing Appearance integrity No visible holes or cracks, (Visual) and no significant absence of paint.

'5.2.2 Failures are rejected and, where appropriate, reworked and retested.

p l

LICENSE

.SNM-1097 DATE 09/29/87 PAGE

. {}

DOCKET 71-9019 REVISION 2

18 -

l 1

---_.1L__-

y y

n =J

", 93 15.3

< MAINTENANCE' ' PROGRAM Th'e' BU-7. outer drum. and cover are inspected - to. assure :

5.3.1-

~

)

Good adherence -'of L paint o

o ' No ' visible holes? or cracks in ' the metal surf aces-No 'dentsiwhich affect drum integrity o

o.

Closure ) rings and bolts are in good condition-Therfour 1/4 Linch holes l'n sides near top of drum are -

o covered with' weatherproof. tape o.

Phenol'ic ' foam insulation! plug is in serviceable.

J"

. cond ition

()

o. Container'is appropriately marked' a

5.3.2>

The BU-7 inner drum and lid are ' inspected to assure:

'1 1

b o

Flange weld is intact o

Inner drum, is visibly' clean and painted j

o Inner drum gasket sealing surf ace is clean, smooth and flat y_

L LICENSE SNM-1097 DATE 09/29/87 PAGE

(])

. DOCKET 71-9019 REVISION 2

19 -

l i.

,a.

3:

e A new-gasketEis used', orithe existing gasket ~ is o:

replaced with a.new gasket-i'f inspection shows any -

defects.. An installed gasket' wil1~be replaced with a L.

' new 'g asket every twelve. months.

I o

Threads are in good condition o.

There is no visible indication of holes-ie 5.4 Replacement Schedules Containers, or:their components.or subsystems, are replaced, on an.as-needed basis, when they do not meet-the' inspection-criteria.

l' l'

5.5 Criteria for Repair of Components and Subsystems Outer container and' inner ' container covers are replaced

()

-when they.will not meet inspection criteria.- Inner gaskets are replaced every 12 months, or ~ sooner. if found damaged when inspected.

Phenolic foam insulation plugs are. replaced if found. damaged when inspected.

Damag ed or deficient 1 bolts and nuts are replaced at inspection during the packir.g process.

i i

l l

l

)

LICENSE SNM-1097 DATE 09/29/87 PAGE

(

DOCKET 71-9019 REVISION 2.

___m

Y'

~

O.

'&,'s

\\,

,p l,

,u ljlT o

. 6.0; BU-7 TRANSPORT PACKAGE SPECIFICATIONS

.F

'Specificat' ions for the BU-7 transport package are~ shown

on, General Electric Drawing 112D1592 in Appendix A.

' Ii,. y f

I e

l i

' LICENSE SNM-1097 DATE 09/29/87 PAGE

-]

DOCKET 71-9019 REVISION 2

- 21 t

i YL_-_:_=_= _ :__ _

7 0

1

. M.

4
m.. _.. _.

....,w g.

l1 7

/

p p : eez O

__-