ML20235W631

From kanterella
Jump to navigation Jump to search

Application for Amend to License DPR-57,revising Tech Specs Re Definition of Surveillance Frequency.Fee Paid
ML20235W631
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/13/1987
From: James O'Reilly
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20235W634 List:
References
SL-2813, TAC-65711, TAC-65712, TAC-65997, NUDOCS 8707230624
Download: ML20235W631 (3)


Text

__ _ _

, Georgia fbwer Company

,,; .  ; *. - '333 Piedmont Avenue Atlanta, Georgia 30308 ,

Telephone 404 526 7851 Mailing Mdress -

' ibst Office Box 4545 Atlanta, Georgia 30302

~

io Vre r dent '

' Nuclear Operations )

SL-2813.

1474C X7GJ17-H600 July 13, 1987 U. S. Nuclear Regulatory Commission' ATTN: Document Control Desk Washington, D. C. 20555-PLANT HATCH - UNIT 1 NRC DOCKET 50-321 OPERATING LICENSE DPR-57 REQUEST TO REVISE TECHNICAL SPECIFICATIONS:

DEFINITION OF SURVEILLANCE FRE0VENCY Gentlemen:

In . accordance with the _ provisions of 10 CFR'50.90, as required by 10 CFR 50.59(c)(1), Georgia Power Company hereby proposes a change to the Plant Hatch Unit 1 . Technical Specifications, _ Appendix A to Operating License DPf4-57.

The proposed change would revise a provision contained in' the -

definition of the term, " Surveillance Frequency" which limits , the operating Ocle interval for instrument and electrical surveillance.

Enclosure i provides a detailed description of the proposed change--

and~the basis for the change.

Enclosure 2 details the basis for our determination that the proposed change does not involve a significant hazards consideration.

Enclosure 3 provides page change instructions for incorporating the proposed change into the Unit 1 Technical Specifications.

The proposed changed Technical Specifications pages follow Enclosure 3.

8707230624 870713 P PDR ADOCK 05000322 (9

\

e em y

sw rso...

U. S. Nuclear Regulatory Commission July 13, 1987 Page Two Payment of the filing fee in the amount of one hundred and fifty dollars is enclosed.

In order to allow time for procedure revision and orderly incorporation into copies of the Technical Specifications, we request that the proposed amendments, once approved by the NRC, be issued with an effective date to be no later than 60 days from the issuance of the amendment.

Pursuant to the requirements of 10 CFR 50.91, a copy of this letter and all applicable enclosures will be sent to Mr. J. L. Ledbetter of the Environmental Protection Division of the Georgia Department of Natural Resources.

Mr. James P. O'Reilly states that he is Senior Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief, the facts set forth in this letter and enclosures are true.

GEORGIA POWER COMPANY By: ' awn C e' James P. O'Reilly '

Sworn to and subscribed before me this 13th_d y of July 1937. (

H m hp E

~ Ifs ~/ 18, 7 N'otary Public REB /lc

Enclosures:

1. Basis for Proposed Change
2. Significant Hazards Consideration
3. Change Instructions
4. Filing Fee - $150.00 c: (see next page) 1474C

U. S. Nuclear Regulatory Commission July 13, 1987 Page Three c: Georaia Power Comp 10y Mr. J. T. Beckham, Jr., Vice President - Plant Hatch GO-NORMS U. S. Nuclear Regulatory Commission. Washinaton Mr. L. P. Crocker, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Region II Dr. J. N. Grace, Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch State of Georaia Mr. J. L. Ledbetter l

1474C

. _ _ _ _ _ _ - _ _