Public Version of Summary of 890201 Meeting W/Util in Region V Re Licensee Action on Potential Release of Contaminated Resin in Liquid Effluent Waste Stream During 890115-19. Agenda & Outline of Events Encl
ML20235U489
Person / Time
Site: Rancho Seco
Issue date: 02/06/1989
From: Yuhas G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8903090226
Download: ML20235U489 (12)


Text

_ _ - _ - - _ _ _ -_ _ _

a ,

,, tk

  • Yi.

Docket No. 50-312 MEMORANDUM FOR: File, Docket No. 50-312 FROM: G. P. Yubas, Ch%f Emergency9 . raparedness & Radiological Protection Branch

SUBJECT:

MEETING WITH REPRESENTATIVES OF SACRAMENTO MUNICIPAL UTILITY' DISTRICT (SMUD) TO DISCUSS THE LICENSEE'S ACTIONS REGARDING THE P0TENTIAL RELEASE OF CONTAMINATED RESIN IN THE LIQUID EFFLUENT WASTE STREAM DURING JANUARY 15-19, 1989 On Wednesday, February 1,1989, members of the Region V staff and SMUD met at 10:00 A.M., in the Chief, Emergency Preparedness & Radiological Protection l Branch's office, to discuss actions'taken and those planned to determine if any resin was released offsite, the source of the resin, the cause of the incident, and corrective measures to prevent recurrence. This meeting was requested by the licensee.

NRC Attendees: G. P. Yuhas, Chief Emergency Preparedness & Radiological Protection Branch H. S. North, Acting Chief, Facilities Radiological Protection Section C. A. Hooker, Radiation Specialist SMUD Attendees: S. P. Melancon, Project Manager S. Crunk, Manager, Nuclear Licensing-The agenda addressed at the meeting is included in the attachment.

Mr. Melancon discussed the scope of the actions taken, those in progress, and those proposed to address concerns associated with the release of contaminated resins from the "B" Regenerate Holdup Tank to the North retention basin. The items discussed are also contained in the attachment.

Mr. Yuhas requested that the licensee keep the Region V office abreast of the

, results from Lawrence Livermore National Laboratory's stream bed surveys, sample analysis data from the RHUT discharge filters, and sample analysis data from the condensate polisher sump. Mr. Melancon' acknowledged the request.

l l'

8903090226 890206  %' a#04 PDR P

ADOCK 05000312

n. ., .

PDC L; hI [

  • .. d

'Mr.-Melancon stated that they expect to complete their investigation by February 15, 1989. Mr. Yuhas stated.that NRC will . review the licensee's evaluation on completion.

l G. P. Yuhas, Chief Emergency Preparedness & Radiological Protection Branch Attachment as stated cc w/ enclosures:

R. Scarano, Director, DRSS,'RV A. Chaffee, Acting Director, DRSP G. Kalman, NRR/ Project Manager C.'Willis, NRR/DREP 4

C YEj /, NO ] (YES)./ N0 1 LPfrQUEST COPY J LSENb)TO P P [,]

pjfHtBEST COPY J LRJQUEST COPY .

(YEj / N0 ] (YES/ / DiO >

b o H r GYuhas 3

2/3/89 2/,f/89 2/6/89 i

j

s 0

. =

AGENDA  !

1.

SUMMARY

OF EVENT  !

2. RESIN MIGRATION
3. ACTION PLAN
4. ASSESSMENT

(

l'.'. j 4 A 4

i OUTLINE \

l.

l^

1.

SUMMARY

OF EVENT o SEQUENCE o KEY FACTORS

- WATER INVENTORY

- TORN SOCK STRAINER

- TIME REQUIRED FOR SAMPLE ANALYSIS

2. RESIN MIGRATION o POSSIBLE PATHWAYS

- ADDITION OF NEW RESIN TO SEPARATION TANK

- NEW RESIN PREPARATION PROCESS

- NEW RESIN TRANSFER TO ISOLATED POLISHER

- TRANSFER OF SPENT RESIN TO DEWATERING SKID

- DEWATERING PROCESS OF SPENT POLISHER RESIN o MOST PROBABLE PATHWAY IS NEW RESIN PREP PROCESS "B" RHUT SAMPLE INDICATED THAT MOST OF.THE ACTIVITY WAS IN THE WATER - NOT THE RESIN CESIUM CONCENTRATIONS IN RESIN FOUND IN THE NORTH BASIN IDENTICAL TO THAT IN THE SILT 0

o FIGURES

L ,

1

3. ACTION PLAN l I

o RETENTION BASIN STRAINER INSTALLATION o SOURCE DETERMINATION o OPERATING PROCEDURE REVISIONS o HARDWARE MODIFICATIONS o VERIFY EFFLUENT STRAINER OPERABILITY o CLEAN OUT RETENTION BASIN SILT

4. ASSESSMENT.0F EVENT .

o ACTIONS TAKEN TO DETERMINE THE EXTENT OF RESIN MIGRATION o RESULTS OF ANALYSES CONDUCTED o POTENTIAL BIOLOGICAL EFFECT OF RESIN

n; ,

SEQUENCE OF EVENTS JAN 15 1700 "B" RHUT ISOLATED SAMPLED AND ANALYZED SAMPLE AND ANALYSIS SHOWED' HIGHER THAN NORMAL ACTIVITY AND PRESENCE OF RESIN (Cs 137 = 5 E-7, Cs 134 = 7 E-8)

FURTHER ANALYSIS REVEALED ALMOST ALL OF THE ACTIVITY, WAS IN THE LIQUID - NOT IN THE RESIN-JAN 16 0900 "B" RHUT WAS RESAMPLED TO VERIFY HIGHER THAN NORMAL ACTIVITY LEVELS

  • PROCESSED "B" RHUT ON RECIRCULATION THROUGH THE EFFLUENT DEMINERALIZERS AND STRAINERS FOR 17 HOURS JAN 17 1300 TRANSFERRED 1/2 "B" RHUT TO THE NORTH RETENTION BASIN TO ENSURE DOSE PROJECTION LIMITS WOULD NOT BE EXCEEDED AND TO PROVIDE TIME FOR FURTHER CLEAN UP DURING TRANSFER THE EFFLUENT STRAINER BECAME CLOGGED AND THE:

STRAINER WAS BYPASSED TO ALLEVIATE THE WATER INVENTORY DURING THE~ RELEASE AN OPERATOR NOTICED THAT THE SOCK STRAINER AT THE INLET TO THE NORTH BASIN WAS TORN THE RELEASE WAS TERMINATED, THE SOCK REPLACED AND THEN THE RELEASE WAS RESUMED 1800 THE RELEASE WAS COMPLETED JAN 18 1200 "B" RHUT WAS ISOLATED AND PROCESSED FOR 41 HOURS (Cs 137 = 5 E-9)

~

4 ,

SEQUENCE OF EVENTS (CONTINUED)

JAM 19 0300 NORTH RETENTION BASIN DISCHARCED (A PRE-RELEASE SAMPLE OF THE BASIN CONTAINED NO RESIN)

JAN 20 1300 RP TECHNICIAN OBSERVED RESIN IN THE NORTH RETENTION BASIN REMAINDER OF LIQUID IN THE NORTH BASIN WAS PUMPED TO THE SOUTH BASIN THROUGH A STRAINER ALL VISIBLE RESIN WAS REMOVED FROM THE NORTH RETENTION BASIN e

l I

I

\

'4

  • a .

ACTION TAKEN TO DETERMINE IF RESIN WAS RELEASED FROM THE SITE

1. ~

THE SAMPLE TAKEN OF THE NORTH RETENTION BASIN CONTENTS PRIOR TO THE RELEASE INDICATED NO RESIN WAS PRESENT IN THE WATER DISCHARGED OFFSITE

2. VISUAL INSPECTIONS AND RADIOIDGICAL SURVEYS PERFORMED DOWNSTREAM OF THE RETENTION BASINS IN THE CREEK INDICATED NO RESIN WAS RELEASED OFFSITE 3.

LIQUID EFFLUENT RADIATION MONITOR (R-15017A). DATA RECORDED DURING THE BASIN RELEASE SHOWED NO ABNORMAL READINGS

4. EXAMINATION OF THE PREFILTER, STRAINERS AND SITE GLASS FOR THE R-15017A RADIATION MONITOR INDICATED NO- RESIN WAS DISCHARGED OFFSITE >

5.

EXAMINATION OF THE LIQUID EFFLUENT STREAM COMPOSITE SAMPLER INDICATED NO RESIN WAS DISCHARGED OFFSITE ,,

6.

LLNL IS CONDUCTING ENVIRONMENTAL SURVEYS DOWNSTREAM OF THE RETENTION BASIN DISCHARGE. SEVEN (7) WATER SAMPLES AND FOURTEEN (14) SEDIMENT SAMPLES WERE TAKEN. (PRELIMINARY RESULTS FROM THE ANALYSIS OF THE WATER SAMPLES SHOWED NO EVIDENCE OF RESIN. PRELIMINARY SEDIMENT ANALYSES REVEALED THE PRESENCE OF RESIN IN TWO SAMPLES.)

THE PHYSICAL ORIENTATION OF THE INLET TO A RETENTION BASIN AND THE DISCHARGE POINT, THE MECHANICS OF RETENTION BASIN OPERATION, THE BEHAVIOR OF RESIN IN WATER AND THE LOCATION OF THE RESIN DISCOVERED IN THE NORTH RETENTION INDICATE THAT RESIN WAS PROBABLY NOT RELEASED OFFSITE.

DISCHARGE OF BASIN THROUGH STRAINER INDICATED NO RESIN.

?. jl.

)

7 o 6 -

0 n 9

R E

Z I

L A

R N E E N

I O

I T T I M U S E L F D I F D O

_- " M.

t I

I S =

Y S

T N

O N

R I

TI N E U

NS N EA L P T R I T8 UK NE KA E F DN cR R LA B EN oT F h

UI SS OT L A E H FR FT ES D

I U

i u

Q I

= L T P N , UK A

L L DN LA A vR c F.

P OT ON N H SI A O I N TI R

T NS SE S EA SN T8 E

AIL P R Y

- B

(

l l 11l ll l 1lI

T T o_

NIN U ES H

$ PE R SR O

T

~ =

T N R E E PP M GZ E

G NUL H

I AE CNMM UU SP A SR S I

E ES n

L N O N VI A P M E

M D R P E  ;

M T U S

A E G K W o A

R N R

E R

E A T H D O T T A S N S W I L

/ O A R I

P A

S T

N R K '

E E X N o I d

U P P

MAT L O F H F

E T U E

L N

u K

- X N n u IMA T Pi A

R u T

( .

,r'

'a

'a

'a

= .

m

'a

' 'a

'a 4,^ 'a 1 i y p, > i

'n

/A%,, - 'a

's "v a u3 n

i e m ;i1I

' e e

l s l

l T _ =

Q N

E M

p

?- -

l

=

E I G

_. = o A )

O Te 4= Q_ ,_

e N " m

    • s*

A e Q_. da .,

s M

(

(

- ,y M.

w

~ .,

.i m ,

% N, _ U

  • m R _

E _

T -

  • s' O A  ! w' Ya ' uuOi O"G D-C W E &

>3 fjy 2

- I.l

,v n

o r

y .ar S

e.

wi S

y j {

Il T fg_

O N .

y_

HE b g y_

C NLF U

v y_ ys y

g, _

g

/

A F RE '

r- ]x ,?]/ hy -

L. +:,, ,.

'gf  % UNITED STATES 8~ Yi NUCLEAR REGULATORY COMMISSION p, t, WASHINGTON, D. C. 20555

  • s....../
  • g'.'.

-Docket No. 50-312 Rancho Seco Nuclear Generating Station MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM: Director, Division of Rules and Records, ADM I

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records'has reviewed the attached document and has determined that it may now be made publicly available, j{[,p /Y / =' 'N Donnie H. Grimsley, Director Division of Rules and Records Office of Administration Atti ;hinent: As statea

]$