ML20235T666
| ML20235T666 | |
| Person / Time | |
|---|---|
| Site: | Neely Research Reactor |
| Issue date: | 02/17/1989 |
| From: | Karam R Neely Research Reactor, ATLANTA, GA |
| To: | Alexander Adams Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8903080407 | |
| Download: ML20235T666 (3) | |
Text
-
(f l
~
(/,,...,,,,'t, Georgia institute of Technology 1
1
'E.;
NEELY NUCLEAR RESEARCH CENTER e oy Boo ATLANTIC DAlVE e,#
/
ATLANTA, GEORGIA 3o332-0425 4
6' (404)S94-3000 8 eso February 17, 1989 Mr. Alexander Adams, Jr.
Project Manager, Standardization and Non-Power Reactor Projects Division of Reactor Projects U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Dear Mr. Adams:
SUBJECT:
EMERGENCY PLAN REVISION NUMBER, DOCKET 50-160 LICENSE R-97 Per our recent telephone conversation concerning the proper revision number for the Georgia Tech Emergency Plan, it is understood that Revision No.
I was the last to be approved by your office.
The history of later revision numbers is noted below.
In July
- 1988, an amendment to the GTRR Technical Specifications was approved by the USNRC which reflected a change to the organizational structure for the reactor.
Consequently, the Emergency Plan was changed to reflect the new approved management structure and was distributed locally as Revision 2.
After the distribution, the clerical staff noted that typographical errors were present on the title page.
These were corrected and sent out as the third revision to the' Plan.
In reality, other than the organizational structure, ne changes were made to the plan.
A review of the Emergency Plan was performed during November 1988, which pointed out the need for editing.
This was performed and the revision was sent to you for approval as Revision 4.
Technically, this revision should be considered as Revision 2 since former editions have never received official approval.
This revision of the Emergency Plan includes the new organizational changes and all the editorial improvements.
We recommend that the submittal to you be designated as Revision 2 and that all other versions of the Plan be discounted.
8903080407 890217 4
PDR ADOCK 05000160 A ff O
F PDC y 'I{ l Te4ea.: 542507 GTRCCAATL Fax: 404-4044120 (Ven4 404-0944951)
A tht of the LNees.ty Sysism of Georgia An Essal Educanon and Engdoynen: Oppornsvir bestution
Mr. Alexander Adams, Jr.
{
' February 17, 1989 i
Page 2 Consequently, a
new cover page for the Plan.is enclosed reflecting the proper revision number which should be included as part of the Georgia Tech Emergency Plan submittal.
Should you have any questions, please let me know.
Sincerely yours, Ws? -
w R. A. Kar Director Neely Nuclear Research Center RAK:dwa c
-?)
s se p -
,e e
, +.
i
- i' Copy No.
EMERGENCY PREPAREDNESS PLAN for the Neely Nuclear Research Center Georgia Institute of Technology Atlanta, Georgia 30332 Draft Revision No. 2 (Pending NRC Approval)
Facility License No. R-97 Docket No. 50-160 h
a l.