Advises That Controlled Work Procedure (CWP) Manual & Procedure G-9, CWPs Will Not Be Completed by 860331. Procedures Will Be Effective After Completion of Equipment Qualification Const Outage or by 860801
ML20235T483
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/24/1986
From: Warembourg D
PUBLIC SERVICE CO. OF COLORADO
To: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
P-86230, NUDOCS 8710130103
Download: ML20235T483 (2)


Text

...v 0 Public Service-

.uo..,..

Company of Colorado 2420'W. 26th Avenue, Suite 100D, Denver,. Colorado 80211 March 24, 1986 Fort St. Vrain Unit No. 1 P-86230 yip e w_.....

4 J

Chief, Reactor Projects. Branch Region IV p~ ',

1 I

U.S. Nuclear Regulatory Commission

%' i M 2 81986 s.;!

i 611 Ryan Plaza Drive, Suite 1000 O'

llh l

Arlington, Texas 76011 Attn: Mr. J. E. Gagliardo l

1 l

l Docket No. 50-267

SUBJECT:

I&E Inspection Report 85-14 i

REFERENCE:

1) PSC Letter, Gahm to Johnson, dated September 4, 1985 l

(P-85303) l l

Dear Mr. Gagliardo:

In Reference 1,

PSC indicated that the Controlled Work Procedures (CWP) Manual and Procedure G-9, " Controlled Work Procedures" would be revised and comprehensive training of CWP preparer's would be completed by March 31, 1986. We now find we cannot meet this date.

The CWP Manual is being deleted, and in its place, two new procedures' are currently being written. G-9 is in the process of being revised.

We expect these procedures to be completed and approved by April 30, 1986.

In order-to have procedure. implementation and training completion dates coincide, the effective date of the i

procedures will be after completion of the EQ Construction Outage or by August 1, 1986, whichever is later.

l 8710130103 860324

(

PDR ADOCK 05000267 h

(

ko G

PDR l

gc-osdSk

i N

P-86230 March 24, 1986 i

We now plan to conduct comprehensive, performance based training on-l these two procedures utilizing the INP0 guidelines for training 2

contained -in INP0 85-002, "The Accreditation of Training in the Nuclear Power Industry". We expect the lesson plans and examinations to be completed by July 10,-1986.

1 s

We now plan to have CWP preparers trained after completion of the EQ l

Construction Outage or by August 1,1986, whichevu.is later.

If have any questions, please contact Mr. M.H. Holmes at (303)you 480-6960.

I Very truly yours, l

I

0. W 1%~C D. W. Warembourg, her Nuclear Engineering Division DWW/MJD:kb i