Requests Written Statement That Oak Ridge Associated Univ Survey Performed on 870817 Constitutes Confirmatory Survey So That Repainting Can Be Performed W/Nrc Concurrence.B&W Will Accept Risk for Repainting Before Final Survey Rept
ML20235T269
Person / Time
Site: 07000824
Issue date: 09/22/1987
From: Olsen A
BABCOCK & WILCOX CO.
To: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
28609, NUDOCS 8710130003
Download: ML20235T269 (3)


Text

70- D ETUR

. Ig 39 -33 g,

e

\\

pocm t0 N,

Babcock & Wilcox

(

USM NMD ESEARCH LA90RATORY SEP23 $$M N P.o. Box 11165 a McDermott company 2

Lynchburg, VA 24506 1165 c)-

WSS (804) 522 6000 September 22, 1987 4 @

E gguaq Fuel Cycle Safety Branch ATTN: Mr. Leland C., Rouse, Chief RECEIVED g

Division of Fuel Cycle, Medical, SEP 231987. )3 Academic, and Commercial Use Safety NMSS LL3., NUCLEAR REcVLATORY /

l U. S. Nuclear Regulatory Commission Ef

[

7 ""I Washington, DC 20555 o

b2TTT

Subject:

NNFD-RL, Building C Decommissioning

Reference:

Letter, June 20, 1987, W. T. Crow to A. F. Olsen Gentlemen:

The referenced letter was issued af ter your review of the Region II Final Report for Phase I of the Building C Decommissioning Project.

The letter lists four conclusions that were reached.

Of specific interest is conclusion No. 3, which states:

The licensee will have to demonstrate there is no contami-nation beneath any painted surfaces in Building C (any contamination beneath painted surfaces must meet release criteria ). The NRC shall make a confirmatory survey before B&W repaints any surfaces in Building C.

A survey team from Oak Ridge Associated Universities (0RAU), under contract to the NRC, arrived on site on August '17,1987, performed confirmatory-surveys in Building C and lef t on September 2, 1987.

The completion of the rough draft of their report is scheduled for the middle of November, 1987.

B&W desires the use of portions of Building C and would like to paint some of the rooms.

However, the prohibition stated in Conclusion No.

3 prevents us from proceeding because it is the latest written commit-ment addressing this subject for Building C.

If indeed the ORAU survey constitutes the confirmatory survey required in Conclusion No.

3, I request that this be stated in writing, so that it is clear that repainting can be performed with the concurrence of your office.

B&W is aware that painting the surfaces in Building C before the re-sults of the survey are formalized carries with it the risk that additional decontamination 'may be necessary, and that removing some of this paint may be required.

Due to the result of our surveys indicating that further decontamination is not.needed and that there is a need to use the space, B&W is willing to accept the risk.

~EE NOT RFQUBED~

gr3885! Fo'ge

~

F c29609

.g.

I am requesting your written concurrence now because it has been my experience that considerable time is required for the confirmatory surveys to be finalized and the results published.

Based on this experience, Building C will be needed before the final report is l

l published.

l l

Very truly yours.

l BABC0CK & WILC0X NNFD Research Laboratory

/ cu V

Arne F. 01sen Senior License Administrator jhc 1

l 1

1 I

I I

i

.g g

.p 1

ri -

y.

,r g

f

1 tt?

)

1 wy; u u '

._ ]0T'S0f

_276$9 M a 87 Mx8 j

d' D.a l l~

h !'

'l l

u l