NOTICE OF VIOLATION Consnonwealth Edison Company.
Docket No..50-249 As a. result.of the inspection conducted on June 4,1988 through February 8, 1989,-and in accordance with 10 CFR Part 2, Appendix C - General Statement of Policy 'and Procedure.for NRC Enforcement Actions (1988), the following
. violation was identified:
DresdenLTechnical Specification Section 6.2, entitled, " Plant Operating Procedures,"
requires that detailed Fire Protection. Program Procedures'be prepared, approved and adhered to.
The licensee's Fire Preventive Proce'ure 3-2 requires that when cutting or d
welding' activities are in progress care shall be taken.not.to direct slag from cutting operations through nearby openings.
- Contrary to the above, on June 4,1988, the licensee did not adequately protect-penetration X-114, which leads to the combustible drywell liner, from cutting
' and welding activities. As a result, a fire was initiated in the drywell liner.
Th.is is a Severity Level IV violation (Supplement 1).
The inspection showed that actiuns had been taken to correct the identified
- violation and.to prevent recurrence. Consequently, no reply to the violation
'is. required and we have no further. questions regarding this matter.
pg g
FEB 281989 Dated R. W. Cooper", Chief Engineering Branch 3'