ML20235T233
| ML20235T233 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 07/13/1987 |
| From: | James O'Reilly GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20235T236 | List: |
| References | |
| SL-2778, NUDOCS 8707220079 | |
| Download: ML20235T233 (2) | |
Text
a;;
- - /
Georgia Power Company 333 Medmont Avenue Atlanta, Geergia 30308 Telephone 404 526-7851 Ma!Mg Address:
Rest Office Box 4545 Attanta, Georgia 30302 James P. O'Rolfly tv southern ec:tv sprem Senior Vice Presdent Nuclear Operations h
SL-2778 1476C X7GJ17-H720 July 13, 1987 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.
20555 PLANT HATCH - UNITS 1, 2 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 ANNUAL FSAR AND FHA AMENDMENTS Gentlemen:
9 In accordance with the provisions of 10 CFR 50.71, Georgia Power Company hereby submits one signed original and ten copies each of the annual amendments to the Final Safety Analysis Reports (FSARs) and the Fire Hazards Analysis and Fire Protection Program (FHA) for Plant Hatch Units 1 and 2.
In accordance with 10 CFR 50.71(e)(2)(i), Mr. James P.
O'Reilly states that he is Senior Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief, the information contained in each of the enclosed FSAR and FHA amendments " accurately presents changes made since the previous submittal, necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission Requirement."
O GEORGIA POWER COMPANY
\\
\\'\\ nw4 L 0
~
By:
h James P. O'Rei Sworn t and subscribed, before,me thi S
day of July 1987.
Nofary P'ublic ~bu' 4 %. Sta6e at tagre AL Mes Sept.18,1987 REBl1c g&'
/f0$$
[SAk
Enclosures:
(see next page) h@
8707220079 870713 gpdh [f[g 4'**fe,/
A PDR ADOCK 05000321 j)g'Sf K
w W
- _ j :_
-fh
~
U.S.' Nuclear Regulatory Commission July 13, 1987 Page Two l-
Enclosures:
- 1. - Plant Hatch Unit 1-FSAR Amendment p
2.
Plant Hatch Unit 2 FSAR Amendment 3.
Plant Hatch Units 1 and 2 FHA Amendment
~
'c: Georgia Power Comoany
?
~Mr. J. T. Beckham, Jr.,.Vice President - Plant Hatch w/o enclosures
-G0-NORMS w/o enclosures U.S. Nuclear Regulatorv Commission. Washington. D.C.
Mr. L. P. Crocker.. Licensing Project Manager - Hatch wic enclosures U.S. Nuclear Regulatorv Commission. Reaion II Dr. J. N. Grace, Regional Administrator w/ enclosures
-Mr. P. Holmes-Ray, Senior Resident, Inspector - Hatch w/ enclosures lO g
yo 10 1476C
______________