ML20235T181

From kanterella
Jump to navigation Jump to search
Forwards Ei Hatch Nuclear Plant Unit 1 1988 Reactor Containment Bldg Integrated Leakage Rate Test. Info on Reactor Containment Bldg as Found Condition as Requested by NRC IE Notice 85-071 Included in Rept
ML20235T181
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/22/1989
From: Hairston W
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20235T184 List:
References
HL-303, IEIN-85-071, IEIN-85-71, NUDOCS 8903080182
Download: ML20235T181 (2)


Text

-_

c,wa se acey 333 Fred 9rf t A (.--

Atts dit CJ greg;n 33.3 ; e, r

T.*;mre 404 Ns > W-e Id 3 lifif;j $ De~

40 in M

! Ce!er P2'-<S r

REI O"

! E 0x Q 4 i

f U 7.s

4 ; n. [iy, i V aw
M3
wt fy t <

w c. natrston, m HL-303

$,l'7/.% "

.4113N X7G317-H540 February 22, 1989 U. S. Nuclear Regulatory Commission 1

ATTN: Document Control Desk j

Hashington, D. C.

20555 NRC DOCKETS 50-321 OPERATING LICENSE DPR-57 EDHIN I. HATCH NUCLEAR PLANT UNIT 1 REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST REPORT - HATCH UNIT 1 EALL.1988 MAINTENANCE / REFUELING OUTAGE Gentlemen:

Pursuant to the requirements of 10 CFR 50, Appendix J, Section V.B.1, Georgia Power Company hereby submits a summary technical report entitled "1988 Reactor Containment Building Integrated Leak Rate Test" for the "as left" integrated leak rate test which was conducted at Plant Hatch Unit 1 during'the Fall 1988 maintenance / refueling outage.

Included in the report is information on the reactor containment building "as found" condition, as requested in NRC I&E Notice 85-71,

" Containment Integrated Leak Rate Tests", issued on August 22, 1985.

Five copies of the report are enclosed for your convenience.

If you have any questions in this regard, please contact this office at any time.

Sincerely, 1

N).lYA' W. G. Hairston, III

/

SJB/eb Enclosure

)

()l1) r 2

('l b l

8903080182 890222 PDR ADOCK 05000321 p

PDC

)

E____---------

j

4 gr -

visi l

4 a

Geo!gia Patterd

,l y

l

+

E U.- S. Nuclear Regulatory Commission' j

. February 22,1 '1989 nPage Two i

'l i

I

.I e

'c : Georaia Power Company

, Mr H. C. Nix,. General Manager Plant Hatch,

1 i.Mr.. L. T. Gucwa, Manager Nuclear Engineering and Licensing GO-NORMS-R U. S. Nuclear Reaulatory Commission. Washinaton. D. C.

I Mr.tl. P. Crocker, Licensing Project Manager - Hatch l

l JA U. S. Nuclear Reaulatory Commission. Reaion II

1. !

Mr. M.

L.' Ernsts Acting Regional Administrator

< l Mr...J. E. Menning, Senior Resident Inspector - Hatch

.j 1

i e,p 3

1

);;.

. ;t,, -

,. p r.

,y.

-)

I s

i

/

,v.

I.:,<,

-l l.

?

_E