Requests That NRC Telecopy Correspondence Re Facility Be Transmitted to Davis-Besse Administration Bldg Rather than Toledo Edison Plaza
ML20235S428
Person / Time
Site: Davis Besse 
Issue date: 10/02/1987
From: Shelton D
TOLEDO EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1-755, NUDOCS 8710080493
Download: ML20235S428 (1)


Text

_ _ _ _

f i

TOLE DO

%mmEDISON DONALO C. SHELTON vce Arewsent-Nucear (459l Pd9 2399 Docket No. 50-346 License No. NPF-3 Serial No. 1-755 October 2, 1987 Mr. A. B. Davis, Regional Administrator United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Telecopy Numbers For Correspondence With Davis-Besse

Dear Mr. Davis:

1 Toledo Edison Company hereby requests that NRC telecopy correspondence related to Davis-Besse Nuclear Power Station be transmitted to the Davis-Besse Administration Building (DBAB) rather than the Toledo Edison Plaza. When the Davis-Besse DBAB telecopy number is busy, please transmit Davis-Besse related telecopies to the Davis-Besse Station Office Building.

The telecopy numbers for these locations are as follows:

Davis-Besse Administration Building 4

Attn:

R. W. Schrauder Telecopy Number.

7419) 249-2342 l

Verification Numbec:

(419) 898-2711, extension 7122 or 7630 Davis-Besse Station Office Building Attn:

L. F. Storz Telecopy Number:

(419) 249-2340 j

Verification Number:

(419) 898-2711, extension 7242

{

1 Sincerelyfdhrs, 0

A 1

<f f %

1 BS:p1g cc: DB-1 NRC Residen* Inspector l

A. W. DeAgazio, NRC Project Manager 1

Document Control Desk ga*R885! Bu8sg6 P

THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43552 l

A