Text
__ _- _ _ _ - - _. _ _ _ _
l' PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA A, PA.19101 1215) e414000 1
October 2, 1987 9
Docket Nos. 50-277 50-278 Director
[
/)r Office of Inspection & Enforcement 4
US Nuclear Regulatory Commission
(
Washington, DC 20555 Attention: Document Control Desk
)
d
SUBJECT:
' Peach Bottom Atomic Power Station I
Monthly Operating Report Revision
)
Gentlemen:
Attached are twelve revised copies of th< monthly operating report for Peach Bottom Units 2 and 3 for the month of August 1987, forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1,.
Revision 4.
Thisrevisedreportisbeingsut'mittedtomoreaccuratelyreflecd..,
previously reported information correcting the Unit 2 shutdown information and ',
the Unit 3 refueling information. Changes to the reptrt.have been identified'by) a bar in the right hand margin adjacent to the affected, lines.
Very truly yours, li/
/r
.~
W. M. Alden
'I, Engineer-In-Charge Licensing Section Nuclear' Support Department Attachment cc:
W. T. Russell, Administrator, Region I. USNRC T. P. Johnson, PBAPS Resident Inspector S. P. Mangi, Dept. of Envir. Resources P. A. Ross, NRC (2 copies) i R. E. Martin, NRC Project Manager Thomas Magette, Maryland Power Plant Siting INP0 Records Center j
'l 8710080397 B71002 DR ADOCK 0500 7