Part 21 & Interim Deficiency Rept CP-89-002 Re Imo Delaval Fuel Injection Pump.Initially Reported on 890125.Spare Pumps in Warehouse Will Be Disassembled & Examined.Next Rept Will Be Submitted by 890531
ML20235S257
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/24/1989
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-89 CP-89-002, CP-89-2, TXX-89092, NUDOCS 8903070044
Download: ML20235S257 (2)


Text

_

y.

w

.K.+

.ll 77-Log # TXX-89092 File #-'.10110 909.5 7UELECTRIC Ref.'# '10CFR50.55(e)

February 24, 1989 W.J.Cahm Executive Vice President U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMAN'HE PEAK STEAM ELECTRIC STATION (CPSES)

C DOCKET NOS. 50-445 AND 50-446 i

IM0 DELAVAL FUEL INJECTION PUMP t

SDAR: CP-89-002 (INTERIM REPORT)

Gentlemen:

On January 25,1989, TV Electric verbally notified Mr. J. S. Wiebe of a potential deficiency. involving the IMO Delaval Fuel Injection Pump. This is an interim report of a potentially reportable item under the provisions of

.q 10CFR50.55(e)

A Cooper Industries Part 21 Notice to.the NRC dated December' 20, 1988' indicates that a component.part (of the fuel injection pumps) manufactured by-Bendix during July 1977'and stamped "Bendix 7/77" may be' defective and should be replaced. A walkdown has determined that the stamped markings on the' affected part cannot be'seen unless the fuel injection pump is partially disassembled.

Consequently, applicability of this issue to CPSES cannot be determined until the injection pumps have been partially disassembled and examined.

l The spare IMO Delaval fuel injection pumps in the warehouse will be' l

disassembled and examined. Any affected components.in those pumps will be i

replaced.

i 1

1 8903070044 090224 I

l PDR ADDCK 05000445 g

PNV i

400 hrth Olive Street LB81 Dallas, Texas 75201

)

)

O

d..-.

n

-TXX-89092.

February - 24, 1989

.Page 2 of 2 -

n The fuel injection pumps currently installed on each diesel-will_ be inspected and any affected components will be replaced.

This work will be performed for:

Unit I after completion of Unit 1-hot functional testing' 'and.for Unit 2 before Unit 2 fuel load.^

The next report on this item will be submitted by May 31, 1989.-

. Sincerely, William J.

ahill, Jr.

-MCP/ddm c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)

?


n--..-----------,a-_----a---_---------a___-----,-_,--