Forwards Attachment Repeating & Supplementing Re Changes to FSAR Since Unit 1 Licensing.Attachment Includes FSAR Revs 54 & 56
ML20235R960
Person / Time
Site: Limerick Constellation icon.png
Issue date: 02/24/1989
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8903030499
Download: ML20235R960 (3)


Text

- __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,

l

s. 8 l

PHILADELPHIA A ELECTRIC COM PANY I 2301 M ARKET STREET P.O. BOX 8699 I

PHILADELPHIA A. PA.19101 l

(215)841 45o0 JOHN S. KEMPER j SENIO R VICE PRESIDENT + NUCLE A R February 24, 1989 U. S. Nuclear Regulatory Conmission Docket No. 50-353  :

Attn: Docunent Control Desk Washington, D.C. 20555

Subject:

Limerick Generating Station, Unit 2 Changes to Final Safety Analysis Report Since Unit 1 Licensing

Reference:

Letter, J. S. Kemper (PECo) to NRC Docunent Control Desk dated February 6, 1989 Gentlemen:

In the referenced letter, Philadelphia Electric Company (PECo) provided the results of its assessment of each change identified in the Limerick Generating Station Final Safety Analysis Report (FSAR)

Appendix B with the exception of those from Revisions 54 and 56 to identify those with the potential to impact the NRC's Safety Evaluation Report. The attachment to this letter repeats the Information from the i i

February 6,1989 letter and supplements it to include FSAR Revisions 54 and 56.  !

For each Revision 54 and 56 change identified in Appendix B, PECo I reviewed the corresponding SER sections to determine whether the information contained therein was accurate in light of the FSAR change.

For the FSAR changes listed in the attachment to this letter, PECo found that the FSAR information differed from that contained in the corresponding section of the SER, suggesting that NRC review of that change and subsequent updating of the SER might be appropriate. For the remainder of the FSAR changes assessed, PECo identified no impact on either the content or conclusions  !

pre.sented in the'SER.-

0!

60 8903030499 890224 3 ,g FDR ADOCK 0500

U. S. Nuclear Regulatory Cannission

. , Docket No. 50-353 Page 2 Similar information associated with any future FSAR revisions will be provided shortly after their submittal. If PECo can provide any additional assistance or you have questions regarding any of the itens in the listing, please contact H. D.

Honan of the PECo LGS-2 Licensing Branch.

Sincerely, ERG /ds/02218902 Attachnent Copy to: R. A. Granm, Unit 2 Senior Resident Inspector W. T. Russell, Region I Administrator R. J. Clark, LGS Project Manager l

. 1 1- 1 e

ATTACHMENT LIMERICK GENERATING STATION, UNIT 2  ;

FINAL SAFETY #MlYSIS REPORT APPENDIX B l REVISION

SUMMARY

DESCRIPTIONS l 1TEMS WITH POTENTIAL IMPACT ON THE NRC SAFETY EVALUATION REPORT (1) l From Revisions 44 through 52:

B.1.2 B.4.5 B.6.2(2)(3) B.9.6 B.2.3 B.4.8 B 6.3 B.9.7 B.2.4 B.4.11 B.7.1(2) B.9.8 B.2.6 B.4.12 B.8.1 B.9.17 B.2.11 B.4.16 B.8.4(2)(3) 8.9.25(2(3) 1 B.3.6 B.5.3 B.8.6 B.9.27 6.4.2 B.5.6 B.8.12(2) B.9.28 B.4.4 B.S.11(2) B.9.3 B.9.50(2)(4) l Fran Revision 53: From Revision 55 Entire Revision. Entire Revision l From Revisions 54 and 56:

l l B.10.1(2) B.10.8 B.'10.31 B.11.2 B.10.2 B.10.12(2) 8.10.35 B.11.3(2)

B.10.4 0.10.24 B.10.36 B.11.5(2)

B.10.5 B.10.26(2) B.10.58 B.11.8 B.10.7 1

Notes:

(1) Unit 1/2 differences with no SER lapact are not listed.

l (2) Unit 1/2 differences.

(3) Unit 1/2 differences previously approved by NRC via letter SEP.

(4) NRC approval requested via leter fran J. S. Kemper to R.J. Clark, j dated June 21, 1988.

ERG /ds/02218902