MONTHYEARML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20217M4281999-10-0808 October 1999 Requests That Attached Request for Addl Info Be Placed in Pdr.Informs That RAI Faxed to J Bailey on 991008 & Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC Staff & SNC Staff ML20207E2431999-05-11011 May 1999 Requests That Encl RAI Be Placed in Pdr.Rai Faxed on 990511 to J Bailey of Snoc to Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Snoc Staff ML20204B3651999-03-11011 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980721 ML20207L7111999-03-11011 March 1999 Informs That Attached Topics Faxed Today to J Bailey of Southern Nuclear Operating Co,Inc for Sole Purpose of Preparing Licensee Personnel for Upcoming Conference Call ML20204C4751999-03-11011 March 1999 Forwards Exam Repts 50-424/98-302 & 50-425/98-302 for Exams Administered on 980721 ML20207H9181999-02-0505 February 1999 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 980413-15 at Plant ML20207H9401999-02-0505 February 1999 Forwards Exam Repts 50-424/98-301 & 50-425/98-301 with as Given Written Exam for Tests Administered on 980413-15 IR 05000425/20010871998-09-22022 September 1998 Redirects Info Encl & Previously Considered as Proprietary, Per .W Ltr NSD-NRC-98-5757 Stated That Encl Rept Is No Longer Considered Proprietary.Encls Originally Submitted as Part of File Package 9504250187 ML20236N6301998-04-0101 April 1998 Submits Task Interface Agreement (TIA-97-12) Suppl Evaluation of TS Required Monthly & Refueling Interval Testing of P-4 Interlock for Vogtle Units 1 & 2 ML20198M9691998-01-13013 January 1998 Notification of 980128 Meeting W/Util in Rockville,Md to Discuss Plant TSs Re Reactor Trip Setpoints & Associated Application for License Amend, ML20236N5921997-12-22022 December 1997 Forwards Task Interface Agreement (TIA-97-12) Evaluation of TS Required Monthly & Refueling Interval Testing of P-4 Interlock for Vogtle Units 1 & 2 ML20199G7471997-11-19019 November 1997 Forwards Memo from Hn Berkow to Jr Johnson, Re Task Interface Agreement 97-07 on Instrument Setpoints,To Be Placed in PDR ML20236N5341997-10-29029 October 1997 Forwards Task Interface Agreement (TIA-97-12) Evaluation of Monthly Surveillance Testing of Reactor Trip Bypass Breaker & ITS P-4 Interlock for Vogtle Units 1 & 2 in Response to 970505 Request from Region II ML20199J2931997-09-16016 September 1997 Discusses Region II Request for NRR Position on Util Practice of Establishing Procedures for RTS & ESF Actuation Sys Instrument Setpoints to Be Nominal Values W/Tolerances Beyond TS Max & Min Allowed Values ML20211D8861997-09-16016 September 1997 Forwards SG Tube Insp Results.Results Were Faxed to J Bailey in Preparation for Conference Call ML20236N2571997-08-0707 August 1997 Forwards TIA-97-07,evaluation Re Reactor Trip & Engineered Safety Features Actuation Sys Instrumentation Setpoints for Plant,Units 1 & 2 ML20141E1781997-05-16016 May 1997 Notification of 970522 Meeting W/Util in Rockville,Md to Allow Licensee to Brief NRC Staff on Results of Analyses of Damage to Unit 1 SG That Was Caused by Parts of Failed Guide Tube Pin Assembly on or About 960529 ML20137R4421997-04-0707 April 1997 Requests That Audio Tapes Identified Be Returned in Order to Return to Region II Office.Licensing Proceeding Terminated & Staff Acted on 10CFR2.206 Petition Initially Filed ML20134P0721997-02-21021 February 1997 Notification of 970304-06 Meeting W/Gpc in Waynesboro,Ga to Review Selected Aspects of Licensee 960515 Submittal to NRC Requesting Approval of Amend to Physical Security & Contingency Plan ML20133G1711997-01-10010 January 1997 Notification of 970116 Meeting W/Util in Rockville,Md to Discuss Schedule for Licensee Submittal & Staff Review & Approval of Plans to Install Addl Fuel Racks in Plant Fuel Pools ML20135F5111996-11-29029 November 1996 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Board (LBP-96-16) Has Expired.Decision Became Final Agency Action on 961129. W/Certificate of Svc.Served on 961129 ML20205C2841995-09-15015 September 1995 Informs That Lou Will Not Be Able to Attend 950923 Meeting, Due to Attendance in Headquarters with Chairman Steering Committee.He Will Also Be Gone on 950924 to Work on Vogtle Case ML20128G2831995-03-10010 March 1995 Discusses Region II Review of Proposed Ack Ltr for Vogtle Civil Penalty (EA 93-304),informing That L Reyes,Deputy Regional Administrator,Concurred on Document on 950310 ML20128G2671995-03-0909 March 1995 Forwards Proposed Ack/Closeout Ltr After Receipt of Gpc Check for Listed Amount in Vogtle Edg/Inaccurate Info Enforcement Action.Requests Assistance W/Expedition of Region Comments & Concurrence Re Ack/Closeout on Vogtle ML20128F5261995-01-20020 January 1995 Partially Deleted Memo Notifying Commission of Results of Settlement Discussions Initiated by Counsel for Georgia Power Co & Staff Intent to Accept Licensee Proposal to Resolve Matter ML20128G2291994-12-20020 December 1994 Informs That Last Version of Memo to Commission on Proposed Resolution of Enforcement Action in Vogtle Included in Attached File.Hard Copy to Be Provided.W/O Encl ML20128Q0711994-11-15015 November 1994 Forwards Vogtle Coordinating Group Evaluation of Georgia Power Co Response to Notice of Violation & Demands for Info ML20128G1521994-10-28028 October 1994 Discusses Result of OI Analysis of Gpc Response to Enforcement Action Per Conclusions in OI Rept, Case 2-90-020R ML20128G1311994-08-16016 August 1994 Discusses 940816 Telcon W/E Blake Re Vogtle Licensing Proceeding.E Blake Expressed Concern Re Length of Time Projected for NRC Staff Review of Gpc Response to NOV & Proposed Imposition of Civil Penalty for Vogtle ML20128Q0461994-08-15015 August 1994 Responds to 940804 Memo & Informs That Plant Coordinating Group Being Reassembled to Expeditiously Review,Analyze & Formulate Position on Adequacy of Responses by Gpc ML20129F7351994-06-0909 June 1994 Recommends That Issue Concerning Failure to Take Appropriate Action for Calcon Switch Problems Identified Prior to 900320 Be Closed W/O Further Action ML20128F5421994-05-0909 May 1994 Informs That J Lieberman States That All Vogtle Officials Notified & Press Release Scheduled for 940510 Approved.Task Force Recommended to Commission That Gpc Should Be Cited for Unacceptable Inaccuracies in Reporting to NRC Only ML20128F4891994-05-0909 May 1994 Discusses Factors Involved Re Possible Press Misinterpretation of Scheduled Press Release Concerning Vogtle Enforcement Action Against Gpc ML20128F4751994-05-0606 May 1994 Requests That Gpc & Southern Nuclear Operating Co Be Notified Re Attached Vogtle Press Release for 940509 ML20128G4311994-03-31031 March 1994 Partially Deleted Memo Informing That DPR Has Reviewed Regional Enforcement Recommendation,Draft Commission Paper & Demands for Info Re Vogtle Electric Generating Plant ML20129H1911994-03-0808 March 1994 Partially Deleted Memo Informing That on 940223,first Draft of Proposed Enforcement Action for Georgia Power Co Submission of Inaccurate & Incomplete Info on Plant DG Problem,Distributed ML20129H1361994-02-23023 February 1994 Partially Deleted Memo Forwarding Proposed Enforcement Action for Georgia Power Co Submission of Inaccurate & Incomplete Info on Plant DG Problem,For Review,Evaluation & Comment ML20059L3601994-01-31031 January 1994 Notification of 940202 Meeting W/Util in Rockville,Md to Discuss Review of Various Requested Licensing Activities ML20058K7791993-12-0606 December 1993 Forwards Ltr as Result of 931117 order,LBP-93-22 & Informs That Staff Will Answer Questions Recently Filed by Util ML20129F7291993-11-0505 November 1993 Informs How IIT Supporting Documents on Plant Accessed in Nudocs ML20057E2991993-10-0404 October 1993 Forwards Safety Evaluation Accepting Proposed Emergency Action Level Changes in Rev 15 of Plant Emergency Plan ML20129H0341993-09-16016 September 1993 Forwards for Implementation,Charter for Preparation of Enforcement Proposal Associated W/Oi Investigation Case 2-90-020 Re Reporting DG Reliability.Nominated Individuals to Review Info Collected by OI Listed ML20129H0121993-09-10010 September 1993 Summarizes 930908 NRC Meeting in Rockville,Md Re Plans for Reviewing Findings of Ongoing OI Investigation Concerning 930320 EDG Failures.Meeting Attendees Listed ML20056F7981993-08-24024 August 1993 Notification of 930908-09 Meeting W/Util in Rockville,Md to Discuss Status of Current Licensing Issues & Safety Initiatives for Plants ML20129F6481993-08-14014 August 1993 Documents Series of Meetings at Which Concerns Re Issues of Mgt Integrity & Attitude at Plant Presented & Discussed ML20056C1531993-03-17017 March 1993 Transmits Corrected Page Nine of NRC Brief in Response to Licensee Appeal of Licensing Board Order Granting Petition to Intervene, in Matter of Gap Re License Amend Dtd 930316. Encl Corrects Signature Page ML20128G8161993-02-0909 February 1993 Forwards Corrected Certificate of Svc Re License Amend, Changing Date of Svc from 930203 to 930205 ML20127K3851993-01-0606 January 1993 Notification of Significant Meeting on 930114 W/Util at Region II Re Emergency Plan Changes to Incorporate NUMARC Emergency Action Levels ML20126F4161992-12-18018 December 1992 Notification of 930107 Meeting W/Util in Rockville,Md to Discuss Design & Operability of Alternate Min Recirculation Path in Highhead Pressure Safety Injection Sys 1999-05-11
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217F3351999-10-14014 October 1999 Notification of 991103-04 Southern Nuclear Operating Licensing Workshop in Birmingham,Alabama with Goal of Improving Licensing Interface Between Licensee & NRC ML20217M4281999-10-0808 October 1999 Requests That Attached Request for Addl Info Be Placed in Pdr.Informs That RAI Faxed to J Bailey on 991008 & Will Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC Staff & SNC Staff ML20207E2431999-05-11011 May 1999 Requests That Encl RAI Be Placed in Pdr.Rai Faxed on 990511 to J Bailey of Snoc to Be Used to Facilitate Discussions During Upcoming Conference Call Between NRC & Snoc Staff ML20207L7111999-03-11011 March 1999 Informs That Attached Topics Faxed Today to J Bailey of Southern Nuclear Operating Co,Inc for Sole Purpose of Preparing Licensee Personnel for Upcoming Conference Call ML20204C4751999-03-11011 March 1999 Forwards Exam Repts 50-424/98-302 & 50-425/98-302 for Exams Administered on 980721 ML20204B3651999-03-11011 March 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980721 ML20207H9181999-02-0505 February 1999 Forwards Facility Submitted Outline,Initial Exam Submittal & as Given Operating Exam for Test Administered on 980413-15 at Plant ML20207H9401999-02-0505 February 1999 Forwards Exam Repts 50-424/98-301 & 50-425/98-301 with as Given Written Exam for Tests Administered on 980413-15 IR 05000425/20010871998-09-22022 September 1998 Redirects Info Encl & Previously Considered as Proprietary, Per .W Ltr NSD-NRC-98-5757 Stated That Encl Rept Is No Longer Considered Proprietary.Encls Originally Submitted as Part of File Package 9504250187 ML20236N6301998-04-0101 April 1998 Submits Task Interface Agreement (TIA-97-12) Suppl Evaluation of TS Required Monthly & Refueling Interval Testing of P-4 Interlock for Vogtle Units 1 & 2 ML20198M9691998-01-13013 January 1998 Notification of 980128 Meeting W/Util in Rockville,Md to Discuss Plant TSs Re Reactor Trip Setpoints & Associated Application for License Amend, ML20236N5921997-12-22022 December 1997 Forwards Task Interface Agreement (TIA-97-12) Evaluation of TS Required Monthly & Refueling Interval Testing of P-4 Interlock for Vogtle Units 1 & 2 ML20199G7471997-11-19019 November 1997 Forwards Memo from Hn Berkow to Jr Johnson, Re Task Interface Agreement 97-07 on Instrument Setpoints,To Be Placed in PDR ML20236N5341997-10-29029 October 1997 Forwards Task Interface Agreement (TIA-97-12) Evaluation of Monthly Surveillance Testing of Reactor Trip Bypass Breaker & ITS P-4 Interlock for Vogtle Units 1 & 2 in Response to 970505 Request from Region II ML20211D8861997-09-16016 September 1997 Forwards SG Tube Insp Results.Results Were Faxed to J Bailey in Preparation for Conference Call ML20199J2931997-09-16016 September 1997 Discusses Region II Request for NRR Position on Util Practice of Establishing Procedures for RTS & ESF Actuation Sys Instrument Setpoints to Be Nominal Values W/Tolerances Beyond TS Max & Min Allowed Values ML20236N2571997-08-0707 August 1997 Forwards TIA-97-07,evaluation Re Reactor Trip & Engineered Safety Features Actuation Sys Instrumentation Setpoints for Plant,Units 1 & 2 ML20141E1781997-05-16016 May 1997 Notification of 970522 Meeting W/Util in Rockville,Md to Allow Licensee to Brief NRC Staff on Results of Analyses of Damage to Unit 1 SG That Was Caused by Parts of Failed Guide Tube Pin Assembly on or About 960529 ML20137R4421997-04-0707 April 1997 Requests That Audio Tapes Identified Be Returned in Order to Return to Region II Office.Licensing Proceeding Terminated & Staff Acted on 10CFR2.206 Petition Initially Filed ML20134P0721997-02-21021 February 1997 Notification of 970304-06 Meeting W/Gpc in Waynesboro,Ga to Review Selected Aspects of Licensee 960515 Submittal to NRC Requesting Approval of Amend to Physical Security & Contingency Plan ML20133G1711997-01-10010 January 1997 Notification of 970116 Meeting W/Util in Rockville,Md to Discuss Schedule for Licensee Submittal & Staff Review & Approval of Plans to Install Addl Fuel Racks in Plant Fuel Pools ML20135F5111996-11-29029 November 1996 Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Decision of Board (LBP-96-16) Has Expired.Decision Became Final Agency Action on 961129. W/Certificate of Svc.Served on 961129 ML20134B7891996-06-25025 June 1996 Board Notification 96-005:discussing Issues Which Involve Challenge Whether Southern Nuclear Operating Co,Inc Possesses Requisite Character,Competence & Integrity & Willingness to Abide by Regulatory Requirements ML20134B7501996-06-0505 June 1996 Board Notification 96-003:discussing Secretary of Labor Decision & Remand Order Which Found That Gap Managers Discriminated Against One of Their Employees,M Hobby ML20134B6771995-11-13013 November 1995 Board Notification 95-017:notifies of Contention Challenging Application of Gpc for Amends to Authorize Southern Nuclear to Operate Plant ML20205C2841995-09-15015 September 1995 Informs That Lou Will Not Be Able to Attend 950923 Meeting, Due to Attendance in Headquarters with Chairman Steering Committee.He Will Also Be Gone on 950924 to Work on Vogtle Case ML20128G2831995-03-10010 March 1995 Discusses Region II Review of Proposed Ack Ltr for Vogtle Civil Penalty (EA 93-304),informing That L Reyes,Deputy Regional Administrator,Concurred on Document on 950310 ML20128G2671995-03-0909 March 1995 Forwards Proposed Ack/Closeout Ltr After Receipt of Gpc Check for Listed Amount in Vogtle Edg/Inaccurate Info Enforcement Action.Requests Assistance W/Expedition of Region Comments & Concurrence Re Ack/Closeout on Vogtle ML20128F5261995-01-20020 January 1995 Partially Deleted Memo Notifying Commission of Results of Settlement Discussions Initiated by Counsel for Georgia Power Co & Staff Intent to Accept Licensee Proposal to Resolve Matter ML20128G2291994-12-20020 December 1994 Informs That Last Version of Memo to Commission on Proposed Resolution of Enforcement Action in Vogtle Included in Attached File.Hard Copy to Be Provided.W/O Encl ML20128Q0711994-11-15015 November 1994 Forwards Vogtle Coordinating Group Evaluation of Georgia Power Co Response to Notice of Violation & Demands for Info ML20128G1521994-10-28028 October 1994 Discusses Result of OI Analysis of Gpc Response to Enforcement Action Per Conclusions in OI Rept, Case 2-90-020R ML20128G1311994-08-16016 August 1994 Discusses 940816 Telcon W/E Blake Re Vogtle Licensing Proceeding.E Blake Expressed Concern Re Length of Time Projected for NRC Staff Review of Gpc Response to NOV & Proposed Imposition of Civil Penalty for Vogtle ML20128Q0461994-08-15015 August 1994 Responds to 940804 Memo & Informs That Plant Coordinating Group Being Reassembled to Expeditiously Review,Analyze & Formulate Position on Adequacy of Responses by Gpc ML20129F7351994-06-0909 June 1994 Recommends That Issue Concerning Failure to Take Appropriate Action for Calcon Switch Problems Identified Prior to 900320 Be Closed W/O Further Action ML20128F5421994-05-0909 May 1994 Informs That J Lieberman States That All Vogtle Officials Notified & Press Release Scheduled for 940510 Approved.Task Force Recommended to Commission That Gpc Should Be Cited for Unacceptable Inaccuracies in Reporting to NRC Only ML20128F4891994-05-0909 May 1994 Discusses Factors Involved Re Possible Press Misinterpretation of Scheduled Press Release Concerning Vogtle Enforcement Action Against Gpc ML20128F4751994-05-0606 May 1994 Requests That Gpc & Southern Nuclear Operating Co Be Notified Re Attached Vogtle Press Release for 940509 ML20128G4311994-03-31031 March 1994 Partially Deleted Memo Informing That DPR Has Reviewed Regional Enforcement Recommendation,Draft Commission Paper & Demands for Info Re Vogtle Electric Generating Plant ML20129H1911994-03-0808 March 1994 Partially Deleted Memo Informing That on 940223,first Draft of Proposed Enforcement Action for Georgia Power Co Submission of Inaccurate & Incomplete Info on Plant DG Problem,Distributed ML20129H1361994-02-23023 February 1994 Partially Deleted Memo Forwarding Proposed Enforcement Action for Georgia Power Co Submission of Inaccurate & Incomplete Info on Plant DG Problem,For Review,Evaluation & Comment ML20059L3601994-01-31031 January 1994 Notification of 940202 Meeting W/Util in Rockville,Md to Discuss Review of Various Requested Licensing Activities ML20058K7791993-12-0606 December 1993 Forwards Ltr as Result of 931117 order,LBP-93-22 & Informs That Staff Will Answer Questions Recently Filed by Util ML20059M9191993-11-19019 November 1993 Board Notification 93-023:forwards Region II Allegation Review Summary Rept Re Alleger Concern on Plant Diesel Generators ML20129F7291993-11-0505 November 1993 Informs How IIT Supporting Documents on Plant Accessed in Nudocs ML20057E2991993-10-0404 October 1993 Forwards Safety Evaluation Accepting Proposed Emergency Action Level Changes in Rev 15 of Plant Emergency Plan ML20129H0341993-09-16016 September 1993 Forwards for Implementation,Charter for Preparation of Enforcement Proposal Associated W/Oi Investigation Case 2-90-020 Re Reporting DG Reliability.Nominated Individuals to Review Info Collected by OI Listed ML20129H0121993-09-10010 September 1993 Summarizes 930908 NRC Meeting in Rockville,Md Re Plans for Reviewing Findings of Ongoing OI Investigation Concerning 930320 EDG Failures.Meeting Attendees Listed ML20056F7981993-08-24024 August 1993 Notification of 930908-09 Meeting W/Util in Rockville,Md to Discuss Status of Current Licensing Issues & Safety Initiatives for Plants ML20129F6481993-08-14014 August 1993 Documents Series of Meetings at Which Concerns Re Issues of Mgt Integrity & Attitude at Plant Presented & Discussed 1999-05-11
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _
1 a .
February 28, 1989 Docket No. 50-425A MEMORANDUM FOR: Thomas E. Murley, Director Office of Nuclear Reactor Regulation FROM: Frank P. Gillespie, Director Program Management, Policy Development and Analysis Staff Office of Nuclear Reactor Regulation
SUBJECT:
OPERATING LICENSE ANTITRUST ANALYSIS OF PLANT V0GTLE, UNIT 2 Enclosed for your signature is a finding of no significant changes pursuant to the operating license antitrust review of Unit 2 of Plant Vogtle. This finding is based upon an analysis by the antitrust staffs of PMAS and 0GC (after consultation with the Department of Justice), which concludes that a "no significant change" finding is warranted. The staff analysis is enclosed as background information.
This is an initial finding which will be noticed in the Federal Register, thereby providing the public the opportunity to request a reevaluation of your finding. If there are no requests for reevaluation, the finding will become final and the operating license antitrust review of Unit 2 of Plant Vogtle will have been completed.
Crisinal81soedBT8 Frank P. Gillespie, Director Program Management, Policy Development and Analysis Staff Office of Nuclear Reactor Regulation
Enclosures:
As stated Distribution
~ Docket Files (No. 50-425A) 93 PTSB RDG cdl8 WLambe p ga. DNash 85 JHopkins RpQ
'~
BVogler LPDR f$ NRC PDR '
g[=] (V0GTLETWO) s"I ,
$ct j
$Er DFES:PTSB:PMAS S PMAS OGC P PMAS Wlambe/lt/bj / ffUg4er FGillespie
[8[/
DNaJs;/89 p /89 / /89 89 2 /4 '/89 h yl[7 $ SM I
i,- ,
PLANT V0GTLE, UNIT 2 OPERATING LICENSE ANTITRUST-REVIEW FINDING OF N0 SIGNIFICANT CHANGE Section 105c(2) of the Atomic Energy Act of 1954, as amended, provides for an l antitrust review of an application for an operating license if the Commission determines that significant changes in the licensee's activities or. proposed activities have occurred subsequent to the previous construction permit review. The Commission has delegated the authority to make the "significant change" determination to the Director, Office of Nuclear Reactor Regulation.
Based upon an examination of the events since the issuance of the Plant Vogtle Unit Policy1 Development operating license to Georgia and Technical PowerBranch, Support Company, Of ficTof Nuclear Reactoret al., the staffs of Regulation and the Office of the General Counsel, hereafter referrod to as
" staff", have jointly concluded, after consultation with~the Department of Justice, that the changes that have occurred since the Plant Vogtle Unit 1 antitrust operating license review are not of the nature to require a second antitrust review at the operating license stage of the application.
In reaching this conclusion, the staff considered the structure of the electric utility industry in Georgia, the events relevant to the Plant Vogtle Unit 1 operating license review, as well as the events that have occurred subsequent to the Plant Vogtle Unit 1 operating license review.
The conclusion of the staff's analysis is as follows: )
Section 105c of the Atomic Energy Act of 1954, as amended, provides-for relicensing antitrust reviews of commercial power reactors at the construction i permit and operating license stages of the licensing process. The antitrust operating license review is not intended as a de novo review but is focused only on those activities of the licensee (s) thaT have occurred since the completion of the construction permit review.
This concept of reviewing only significant changes in the licensee's activities at the operating license stage has been applied by the staff to reviews of multiunit plant applications. For those plants with multiple reactor licenses, the staff conducts separate antitrust reviews for each reactor when the reactors are licensed on a delayed or staggered schedule, i.e., when the reactors are scheduled to be licensed eighteen months or more apart.
As indicated supra, the antitrust operating license review of Unit I of Plant Vogtle was co mmp e ed in November of 1986 and the reactor was licensed in March l of 1987. Unit 2 of Plant Vogtle is scheduled to be licensed in March of 1989 and in light of the two-year lapse since the previous review of the licensees, the staff initiated a separate antitrust review of Unit 2 -- with the-focus of the review on any significant changes in the licensees' activities since the completion of the previous review in 1986.
i e
l
( O 1
, 2 E
The changes in the licensees' activities since the previous antitrust review have been largely the result of policies and agreements that were initiated as a result of license conditions placed upon the principal licensee, Georgia Power Company, during the antitrust construction permit review. The staff noted in its operating license review of Unit 1 of Plant Vogtle, that the ,
competitive process in the Georgia electric bulk power industry had improved I markedly. Moreover, the staff attributed this positive change to the successful implementation of the antitrust license conditions imposed by the Commission. It was also noted that power systems throughout Georgia and adjacent states were better able to control their own power supply destinies by taking advantage of new power supply options and alternatives made available by a more competitive bulk power supply system.
The staff's review of changes in the licensees' activities since 1986 indicates that the procompetivite effects identified during the Vogtle 1 OL review are continuing. Various energy exchange agreements among industry players have been entered into and activated, thereby stimulating more efficient operations among a wide variety of industry players throughout the southeastern portion of the
! country. Georgia Power Company is providing power end energy transactions to various power systems S Georgia as well as Florida. The integrated transmission system that emerged from the Commission's antitrust construction permit review of plant Vogtle in the mid-1970's allows for ownership of portions of the Georgia 1 transmission grid by all power systems in the state and this transmission arrangement has been cited by industry observers as a model for joint transmission agreements in other areas of the country.
The staff believes the competitive stimuli introduced during the antitrust construction permit review are continuing to promote competition and enhance the competitive process throughout the Georgia electric bulk power market.
The staff does not believe that there have been any "significant changes" in the licensees' activities since the previous antitrust review and recommends that no affirmative significant change determination be made pursuant to the operating license for Unit 2 of Plant Vogtle.
Based upon the staff's analysis, it is my finding that there have been no "significant changes" in the licensees' activities or proposed activities since the completion of the previous antitrust review.
% sign e mys Thomas E. Murley, Director Office of Nuclear Reactor Regulation Distribution Docket Files (No. 50-425A)
PTSB RDG WLambe DNash JHopkins NRC PDR O f (V0GTL LOSURE) f '
\ f)
PDFES :PMAS PDF PTSB:PMAS 0 TSB Rt WLambe/lt/bj DNash FG spie d / /89 p /;789 t 89 /89 yg/89 3