Discusses Status of Auxiliary & Fuel Handling Bldg Decontamination for Second Quarter 1987,addressing Only Areas Tech Spec Surveillances Not Performed Due to ALARA Considerations
ML20235R628
Person / Time
Site: Crane Constellation icon.png
Issue date: 07/14/1987
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
0050P, 4410-87-L-8461, 50P, NUDOCS 8707210382
Download: ML20235R628 (2)


Text

b

,s GPU Nuclear Corporatiori g

Nuclear

o = : 48o s

Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84 2386

$k*8kh*84[ "

4410-87-L-0107 Document ID 0050P July 14,1987 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sirs:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 Auxiliary and Fuel Handling Building Quarterly Decontamination Schedule In response to the NRC letter dated March 7, 1984, the following is the status of Auxiliary and Fuel Handling Building Decontamination for the Second Quarter of 1987. This update addresses only those areas where Technical Specification Surveillance are not being performed due to ALARA considerations.

Make-up Filter Cubicle (AX117)

ALARA exemption is being taken for Technical Specification Surveillance 4210-SUR-3775.02 (4331-R3), " Fire Barrier Penetration Fre Seal Inspection."

Recent radiological surveys show general area dose rates i.f 600 to 3000 mrem /hr, with contact readings as high as 5.5 Rem /hr.

The status of this cubicle is essentially unchanged witn flushing of the Make-up and Purification System (MU&P) in progress. Anticipated future evolutions of this task will require the use of system filters located in this cubicle. Radiological conditions can be expected to remain variable until system flushing is completed. Major reductions in radiation readings will not occur until both flushing and gross decontamination are complete.

8707210382 870714 DR ADOCK 05000320 PDR

\\ O GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

y.c : 4; '

j L

Document Control Desk July 14,1987' 4410-87-L-0107 1'i l'

Seal Injection Cubicle-(AX004).

ALARA' exemption is currently being taken for Technical Specification Surveillance.4210-SUR-3244.01-(4301-M8), " Containment Integrity Verification."

General ^ area dose rates in the cubicle proper range from 1 R/hr - 56 R/hr, with contact readings:as high as 140 R/hr.

Floor scabbling progressed slowly during this quarter, primarily due to delays

/ caused by airborne contamination problems..These problems have been resolved-and progress is expected to resume soon. The surface' decontamination program "is expected to extend through the Fourth Quarter of 1987.

Make-up Pump Suction (FH001) and Discharge Valve Alley (FH003~ a & b)

'ALARA exemption is being taken for Technical Specification Surveillance 4210-SUR-3775.02 (4331-R3) and 4210-SUR-3775.01 (4331-A1), " Fire Barrier Penetration Fire Seal Inspections."

The general area dose-rates for the Make-up Pump Suction' Alley (FH001)' range from 25 - 100 mR/hr, with hot spots up to 1.4 R/hr. For the Discharge Valve Alley, the general area dose rates in FH003a range from 50-600 mR/hr with hot.

spots of'.'3 R/hr. In FH0030, general area dose rates are 20-2000 mR/hr with shot spots of 30 R/hr.

l l'

MU&P system flushing operations continued during the past quarter.. Radiation l

-levels continue.to be influenced by MU&P system flushing and by surface contamination levels. Scabbling has been completed in FH003a, and is.in progress in FH003b. 'Scabbling in FH001 will follow, with completion scheduled during for the Third Quarter of 1987.

Sincerely, 0

}

F.

. Standerf r Vice President / Director, TMI-2 FRS/CJD/eml cc: ' Regional Administrator, Region 1 - W. T. Russell Director, TMI-2 Cleanup Project Directorate - Dr. W. D. Travers l

?

i