Advises That Completion Date to Correct Errors & Discrepancies in Facility Waste Disposal Sys Drawings Revised to 880401 Due to Extent of Effort Involved,Per Insp Repts 50-327/86-55 & 50-328/86-55
ML20235N802
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/02/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8710070077
Download: ML20235N802 (2)


Text

a' TENNESSEE VALLEY AUTHORITY l

CH ATTANOOGA. TENNESSEE 37401 I

SN 157B Lookout place 3

08T 021987 i

1 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 i

i Gentlemen:

l In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - REVISED COMMITMENT FOR NRC OBSERVATION 2.7 FROM REPORT NUMBERS 50-327/86-55 AND 50-328/86-55

Reference:

TVA letter to NRC dated April 22, 1987, "Sequoyah Nuclear Plant -

NRC Inspection and Enforcement Report Numbers 50-327/86-55 and 50-328/86-55" In the reference, TVA committed to correct a number of errors and discrepancies on Sequoyah Waste Disposal System drawings (47W560 series) when the Configuration Control Drawings are generated.

This commitment was made in the response to NRC Observation 2.7 - Drawing Control.

TVA indicated that the drawings were scheduled to be completed by October 1, 1987, which was a postrestart date when the response was transmitted.

Because of the need for TVA resources to be used in addressing restart issues and the extent of effort involved in preparing these drawings, this commitment l

completion date should be revised to April 1, 1988.

If you have any questions concerning this issue, please telephone Beth L. Hall at (615) 870-7459.

Very truly yours, TENNE.SEE V LLEY AUTHORITY

)

R. Gridley, irector Nuclear Lie sing and Regulatory Affairs i

cc:

see page 2 871007 hhg PDR pl a

Iti O An Equal Opportunity Employer

a-

. U.S. Nuclear Regulatory Commission ec:

Mr. C. G. Zech, Assistant Director for Inspection Programs Office of Special Projects U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East-West Highway EWW 322 Bethesda, Maryland 20814 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 1 ou Ferry Road 5

Soddy Daisy, Tennessee 37379 i