ML20235N753
| ML20235N753 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 09/25/1987 |
| From: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| To: | Calvo J NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation |
| References | |
| P-87330, NUDOCS 8710070054 | |
| Download: ML20235N753 (3) | |
Text
_
Public Service-
=.ra P.O. Box 840
~
16805 WCR 19-1/2, Platteville, Colorado 80651 R.O. WILUAMS, JR.
VICE PRESIDENT NUCLEAR OPERATIONS September 25, 1987 Fort St. Vrain Unit No. 1 P-87330 U. S. Nuclear Regulatory Comnr.ssion ATTN: Document Control Desk Wa!hington, D.C.
20555 Attention: Mr. Jose A. Calvo l
Director, Project Directorate IV l
Docket No.
50-267 l
SUBJECT:
Submittal of Current Construction Status for Appendix R Modification Item 4.11.g l
l
REFERENCE:
1)
- letter, l
Warembourg to Calvo, i
dated May15,1987 (P-87167) 2)
PSC letter, Williams to
- Calvo, dated August 21, 1987 (P-87267)
Dear Mr. Calvo:
In Reference 1, we indicated that valve V-31102 required the addition of a chain operator to facilitate manual operation during a Train A Fire Protection Shutdown /Cooldown.
In Reference 2, we noted that this modification would be completed on or before October 1,1987.
Subsequently, we have further reviewed the accessibility requirements for this valve and have determined a chain operator is not necessary.
Accessibility has been provided via a dedicated Fire Protection Shutdown /Cooloown ladder presently located in the immediate vicinity of the valve.
Therefore, no modifications are required to ensure manual operation of the valve during a Train A Fire Protection Shutdewn/Cooldown.
gjoo 54 syo925 P
CK 05000gs7 !
l O POR,,
i P-87330 September 25, 1987 l
To ensure availability of these designated Fire Protection Shutdown /Cooldown.-ladders, PSC is developing procedures as part of the Fire Protection Program Plan.
During this interim period, the l
availability of these ladders is reviewed by the FSV Fire Protection i
Engineer during his weekly inspections.
l I
If there are any questions concerning this matter, please contact Mr.
1 M. H. Holmes at (303) 480-6960.
Very truly yours,
.)
$ 0 Ut 10- /Ywn/
R. 0. Williams Jr.
7, Vice President, Nuclear Operations R0W: GDS /bac Distribution i
l l
i
.P-8N30-. September 25, 1987 s
, [' '_ (y.
?,
. l*
r iu.
.To ensure
- availability.of these.-. designated-Fire Protection-
. Shutdown /Cooldown ladders,'PSC is developing procedures as part of.
Fire.~Prote' tion Program Plan. During this interim period, the j
the' c
l availability of.these ladders.is reviewed by the FSV. Fire Protection
.c s
- Engineer.during'his. weekly inspections.
-If there are.any que'stions'concerning this matter..please contact Mr.
M.:H. Holmes at (303) 480-6960.
-Very truly yours, 4.o.va u/64L m g R. 0 Williams, Jr.
I Vice President, Nuclear Operations.
.]
R0W! GDS /bac' l
. Distribution
. Reviewed Byi h C 6# e v
.i i
.i
)
4 l
1 l
F d