Advises That Chain Operator for Valve V-31102 to Facilitate Manual Operation During Train a Fire Protection Shutdown/ Cooldown Unnecessary.Accessibility Now Provided by Dedicated Ladder.Procedures for Fire Program Being Developed
ML20235N753
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/25/1987
From: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
To: Calvo J
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
References
P-87330, NUDOCS 8710070054
Download: ML20235N753 (3)


Text

_

Public Service-

=.ra P.O. Box 840

~

16805 WCR 19-1/2, Platteville, Colorado 80651 R.O. WILUAMS, JR.

VICE PRESIDENT NUCLEAR OPERATIONS September 25, 1987 Fort St. Vrain Unit No. 1 P-87330 U. S. Nuclear Regulatory Comnr.ssion ATTN: Document Control Desk Wa!hington, D.C.

20555 Attention: Mr. Jose A. Calvo l

Director, Project Directorate IV l

Docket No.

50-267 l

SUBJECT:

Submittal of Current Construction Status for Appendix R Modification Item 4.11.g l

l

REFERENCE:

1)

PSC

letter, l

Warembourg to Calvo, i

dated May15,1987 (P-87167) 2)

PSC letter, Williams to

Calvo, dated August 21, 1987 (P-87267)

Dear Mr. Calvo:

In Reference 1, we indicated that valve V-31102 required the addition of a chain operator to facilitate manual operation during a Train A Fire Protection Shutdown /Cooldown.

In Reference 2, we noted that this modification would be completed on or before October 1,1987.

Subsequently, we have further reviewed the accessibility requirements for this valve and have determined a chain operator is not necessary.

Accessibility has been provided via a dedicated Fire Protection Shutdown /Cooloown ladder presently located in the immediate vicinity of the valve.

Therefore, no modifications are required to ensure manual operation of the valve during a Train A Fire Protection Shutdewn/Cooldown.

gjoo 54 syo925 P

CK 05000gs7 !

l O POR,,

i P-87330 September 25, 1987 l

To ensure availability of these designated Fire Protection Shutdown /Cooldown.-ladders, PSC is developing procedures as part of the Fire Protection Program Plan.

During this interim period, the l

availability of these ladders is reviewed by the FSV Fire Protection i

Engineer during his weekly inspections.

l I

If there are any questions concerning this matter, please contact Mr.

1 M. H. Holmes at (303) 480-6960.

Very truly yours,

.)

$ 0 Ut 10- /Ywn/

R. 0. Williams Jr.

7, Vice President, Nuclear Operations R0W: GDS /bac Distribution i

l l

i

.P-8N30-. September 25, 1987 s

, [' '_ (y.

?,

. l*

r iu.

.To ensure

availability.of these.-. designated-Fire Protection-

. Shutdown /Cooldown ladders,'PSC is developing procedures as part of.

Fire.~Prote' tion Program Plan. During this interim period, the j

the' c

l availability of.these ladders.is reviewed by the FSV. Fire Protection

.c s

Engineer.during'his. weekly inspections.

-If there are.any que'stions'concerning this matter..please contact Mr.

M.:H. Holmes at (303) 480-6960.

-Very truly yours, 4.o.va u/64L m g R. 0 Williams, Jr.

I Vice President, Nuclear Operations.

.]

R0W! GDS /bac' l