[, ycang.Ig UNITED STATES g
NUCLEAR REGULATORY COMMISSION O
hj WASHINGTON, D. C. 20555
% * * * * *,/
^
FEB 2 31989 llr. K. Rademacher flanager, Quality Assurance Klockner-lioclier llein-Ecmiler Strasse 7-11 Bonn 1, Federal Republic of Germany D-5300
Dear Mr. Rademacher:
This letter addresses the inspection of your facilities at Bonn and Werke Bayenthal in Cologne, conducted by Mr. K. R. Naidu of this office on November 17-18, 1988, and the discussions of his findings with you and cther members of your staff at the conclusion of the inspection.
The purpose of the inspection was to verify the implementation of your quality assurance program in selected areas including design changes to the electrical L
equipment supplied to the LaSalle County fluclear Power Plant Units 1 and 2
{
located in Illinois. Areas examined during the NRC inspection and our finding 3 are discussed in the enclosed report. This inspection consisted of an examina-tion of procedures and representative records, interviews with personnel, and observations by ths. iqNrN?.
Within the scope of this inspectien, we found no instance where you failed to meet NRC requirements.
lu accordance with 10 CFR 2.790 of the Conraission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
Should you have any questicus concerning this inspection, we will be pleased to discuss them with you.
Sincer O
sa :
mn.4 Brian K. Grimes, Director Division of Reactor Inspection and Safeguards Office of Nuclear Reactor Regulations Euclosure:
Inspection Report 99901133
~~
cc: Mr. H. Schneider, QA Manager Klockner-Moeller 4 Strathmore Road flotick, Massachusetts 01760 89030 g y h gg If/
holi33
g
=4 FEB t 31989 1
-[
Mr. K. Rademacher-
. 2.-
I.f DISTRIBUTION
'RT6S Cooe NRR:09 z'
VIB Reading
'DRIS Reading BKGrimes.
-EWBrach ETBaker KRNaidu PShemanski PMLaSalle, NRR/PD 32 Mail Stop 13c.7 f
- SEE PREVIOUS CONCURREllCE PAGE.
,- 0FC
- VIB:DRIS
- SC/VIB:DRIS
- BC/ B DRIS
- D-S-
- R 1.......
- ................:.................dh
' NAME- :KRNaidu:mkm*
- ETBaker*
- E V
..e s
. DATE :02/13/89
- 02/16/89
- 02/CE/89
- 02/s7/89
- i G rr';
(
l-l t
__________.___m_____
i -.e 4
M, :-
.c
- FEB 131989 J. -
..1-Mr..K. Rademacher.x i..
DISTRIBUTION
[
- <: N ;09g i'
.VIB Reading
-DRIS Reading BKGrimes EWBrach-ETBaker t-
.KRNaidu PShemanski 4
PMLaSalle, NRR/PD 32' Mail: Stop 13c-7 3
g
/
- SEE PREVIOUS CONCURREllCE PAGE.
0FC.
- VIB:DRIS
- SC/VIB:DRIS
- BC/ B DRIS
- D-S
,R
^
...___:__.....____.__.:______........:.dh NAME. :KRNaidu:mkm*
- ETBaker*
- E, t.es DATE. :02/13/89
- 02/16/89
- 02/ZL/89
- 02/s1/89 2/22.
rrq 1
O I
is 1
1 4
m
_