ML20235N145

From kanterella
Jump to navigation Jump to search
Part 21 Rept Re Seismic Test of K-Line Switchgear Malfunction in Circuit Breaker Slow Close Latch Possibly Resulting in Jamming of Breaker & Failure of Breaker to Close.Results of Wyle Labs 4-frame Sample Test Program Encl
ML20235N145
Person / Time
Issue date: 02/16/1989
From: Rhoads E
ABB POWER DISTRIBUTION, INC.
To: Berlinger C
Office of Nuclear Reactor Regulation
References
REF-PT21-89-025-000 PT21-89-025-000, PT21-89-25, NUDOCS 8903010062
Download: ML20235N145 (2)