ML20235M723

From kanterella
Jump to navigation Jump to search
Informs of Revised Submittal Date for Util Response to NRC 870720 Request for Addl Info Re Util 870408 Proposed Change to Interim Tech Spec 3/4.1.7, Reactivity Change W/Temp. Response Will Be Submitted by 871106
ML20235M723
Person / Time
Site: Fort Saint Vrain 
Issue date: 09/29/1987
From: Brey H
PUBLIC SERVICE CO. OF COLORADO
To: Calvo J
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
References
P-87344, NUDOCS 8710060271
Download: ML20235M723 (2)


Text

..

O Public Service ~

.me.,

Company of Colorado 2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 September 29, 1987 Fort St. Vrain

)

Unit No. 1 P-87344 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Attention:

Mr. Jose A. Calvo Director, Project Directorate IV Docket No. 50-267

SUBJECT:

Interim Technical Specification 3/4.1.7, Extension to Response to Questions

REFERENCES:

1) NRC letter, Heitner to Williams, dated 7/20/87 (G-87241)
2) PSC letter, Williams to Berkow, dated 4/8/87 (P-87056)

Dear Mr. Calvo:

This provides a revised submittal date for Public Service Company of Colcrado's (PSC) response to the request for additional information in Reference 1.

This information was requested to support the NRC's review of a proposed change to Interim Technir 1 Specification 3/4.1.7, Reactivity Change with Temperature, submitted in Reference 2.

PSC will submit a response to the NRC'r m est by November 6, 1987.

This delay from the requested date September 18, 1987 is necessitated by the demands of the current Fort St. Vrain (FSV) restart effort. The resultant delay in resolving the concerns with this Technical Specification is acceptable to PSC, since the current requirements are not a constraint to FSV operation.

8710060271 870929 PDR ADOCK 05000267 P

PDR pol

/[b

I l

P-87344 l

Page 2 September 29, 1987 l

l If you have any questions about this information, please contact Mr.

M. H. Holmes at (303) 480-6960.

Very truly yours,

%A-< -

kH.L.Brey, Manager Nuclear Licensing and Fuels HLB /SWC/ lmb cc: Regional Administrator, Region IV ATTN: Mr. J. E. Gagliardo, Chief Reactor Projects Branch Mr. Robert Farrell Senior Resident Inspector Fort St. Vrain 1.

._