MONTHYEARIR 05000395/19973001998-01-14014 January 1998 NRC Operator Licensing Exam Rept 50-395/97-300 (Including Completed & Graded Tests) for Tests Administered on 971201- 05 & 1212 IR 05000395/19930311993-11-30030 November 1993 Exam Rept 50-395/93-31 on 931119.Exam Results:Operators Passed Exams IR 05000395/19923011993-01-0505 January 1993 Exam Rept 50-395/92-301 Administered During Wk of 921207. Exam Results:All Applicants Passed Exam ML20244D6001989-05-24024 May 1989 Exam Rept 50-395/OL-89-01 on 890221-0303.Exam Results:Seven of Eight Reactor Operators Passed Written Exams & 14 of 16 Senior Reactor Operators Passed Exams ML20151V9991988-04-15015 April 1988 Exam Rept 50-395/OL-88-01 on 88030710.Exam Results:All Six Candidates Passed Operating & Written Exams.Master Copy of Exam Encl ML20205P3111987-03-23023 March 1987 Exam Rept 50-395/OL-86-02 on 861117-20.Exam Results:All Eight Reactor Operator Candidates,One Senior Reactor Operator Candidate & One Instructor Certification Candidate, Passed All Portions of Exams.Exams & Answer Key Encl ML20235M5181986-11-12012 November 1986 Exam Rept 50-395/OL-86-01 on 860813 & 0912.Exam Results:Two Senior Reactor Operator (SRO) (IC) Candidates Passed & One Reactor Operator Candidate Did Not.Oral & Simulator Exams Will Be Administered to Remaining SRO (IC) Candidate Later ML20151R9971986-01-0303 January 1986 Exam Rept 50-395/OL-85-02 on 851119-22.Exam Results:Two Candidates Passed & Two Failed Written Simulator Exams. One Candidate Passed Simulator & Oral Reexam ML20127G7521985-04-16016 April 1985 Exam Rept 50-395/OL-85-01 on 850225-28.Exam Results:Four Senior Reactor Operator Candidates & Two Reactor Operator Candidates Passed & One Instructor Certification Candidate Failed 1998-01-14
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000395/19990061999-10-0808 October 1999 Insp Rept 50-395/99-06 on 990801-0911.One Violation Identified & Being Treated as Ncv.Major Areas Inspected: Operations,Maint,Engineering & Plant Support IR 05000395/19990051999-08-30030 August 1999 Insp Rept 50-395/99-05 on 990620-0731.Non-cited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000395/19990041999-07-16016 July 1999 Insp Rept 50-395/99-04 on 990509-0619.Noncited Violation Identified.Major Areas Inspected:Aspects of Licensee Operation,Maint,Engineering & Plant Support ML20207H5331999-06-0707 June 1999 Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000395/19990031999-06-0707 June 1999 Insp Rept 50-395/99-03 on 990328-0508.Six Violations of NRC Requirements Occurred & Being Treated as non-cited Violations.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000395/19990021999-04-26026 April 1999 Insp Rept 50-395/99-02 on 990214-0327.Non-cited Violation Noted.Major Areas Inspected:Operations,Maintenance, Engineering & Plant Support IR 05000395/19990011999-03-15015 March 1999 Insp Rept 50-395/99-01 on 990103-0213.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000395/19980101999-02-0101 February 1999 Insp Rept 50-395/98-10 on 981122-990122.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000395/19980091998-12-21021 December 1998 Insp Rept 50-395/98-09 on 981011-1121.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198N8491998-12-21021 December 1998 Notice of Violation from Insp on 981011-1121.Violation Noted:On 980715,operations Personnel Authorized Maint Activities on ECCS Accumulators a & C Outlet Isolation Valve Breakers Without Recognizing Sys Would Become Inoperable IR 05000395/19980081998-11-0909 November 1998 Insp Rept 50-395/98-08 on 980906-1010.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000395/19980071998-10-0505 October 1998 Insp Rept 50-395/98-07 on 980726-0905.No Violations Noted. Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000395/19980061998-09-24024 September 1998 Insp Rept 50-395/98-06 on 980628-0725.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000395/19980991998-08-26026 August 1998 SALP Rept 50-395/98-99 for Period of 961027-980725 IR 05000395/19980051998-07-27027 July 1998 Insp Rept 50-395/98-05 on 980517-0627.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000395/19980041998-06-15015 June 1998 Insp Rept 50-395/98-04 on 980405-0516.Violation Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20236H0021998-06-15015 June 1998 Notice of Violation from Insp on 980405-0516.Violation Noted:On 980123 Condition Adverse to Quality Was Not Promptly Identified & Corrected IR 05000395/19980031998-05-29029 May 1998 Insp Rept 50-395/98-03 on 980330-0417.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20248J3281998-05-29029 May 1998 Notice of Violation from Insp on 980330-0417.Violation Noted:Instructions or Procedures Not Followed for Performance of Listed Activities ML20216C6681998-05-0404 May 1998 Insp Rept 50-395/98-02 on 980222-0404.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20216C6581998-05-0404 May 1998 Notice of Violation from Insp on 980222-0404.Violation Noted:On 980319,security Officer Failed to Ensure That Neither Operator Nor Accompanying Personnel Were Provided Access to Any Portion of Vehicle Until Search Completed ML20217G4431998-03-20020 March 1998 Notice of Violation from Insp on 980111-0221.Violation Noted:Licensee Failed to Establish Adequate Requirements to Insure That Temporary Shielding Properly Controlled ML20217G4651998-03-20020 March 1998 Insp Rept 50-395/98-01 on 980111-0221.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20203J7471998-02-0909 February 1998 Notice of Violation from Insp on 971130-980110.Violation Noted:On 971209,licensee Failed to Sign Off Applicable Steps to Mechanical Maintenance Procedure 300.033,rev 2,at Completion of Each Step ML20203J7531998-02-0909 February 1998 Insp Rept 50-395/97-14 on 971130-980110.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support IR 05000395/19973001998-01-14014 January 1998 NRC Operator Licensing Exam Rept 50-395/97-300 (Including Completed & Graded Tests) for Tests Administered on 971201- 05 & 1212 IR 05000395/19970131997-12-23023 December 1997 Insp Rept 50-395/97-13 on 971019-1129.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20198N6871997-12-23023 December 1997 Notice of Violation from Insp on 971019-1129.Violation Noted:On 971019,licensee Employee Failed to Adhere to Posted HP Instructions in That Individual Observed Using Chewing Tobacco Product in B Chiller Unit Room IR 05000395/19970121997-11-17017 November 1997 Insp Rept 50-395/97-12 on 970907-1018.No Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000395/19970111997-10-0202 October 1997 Insp Rept 50-395/97-11 on 970727-0906.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20211K5271997-10-0202 October 1997 Notice of Violation from Insp on 970727-0906.Violation Noted:On 970817,licensee Identified That Procedures STP-345.001,STP-345.002 & STP-345.003 Had Not Been Maintained to Ensure Correct Setting of OT Delta T ML20203L2831997-09-24024 September 1997 Insp Rept for VC Summer Nuclear Station on 970227.No Conditions Observed at Time of Insp That Could Be Considered Immediate Threat to Safety of Dams or Nuclear Facility.Major Areas Inspected:Service Water Pond Dams IR 05000395/19970101997-08-22022 August 1997 Insp Rept 50-395/97-10 on 970714-18.No Violations Noted. Major Areas Inspected:Observation & Evaluation of Biennial EP Exercise ML20210N9401997-08-21021 August 1997 Insp Rept 50-395/97-07 on 970615-0726.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support ML20210N9331997-08-21021 August 1997 Notice of Violation from Insp on 970615-0726.Violation Noted:Train a Hydrogen Monitor Containment Isolation Valves, SVX-6051A,SVX-6052A & SVX-6053A,were Open on an Intermittent Basis to Perform Hydrogen Monitor Calibration IR 05000395/19970091997-08-11011 August 1997 Insp Rept 50-395/97-09 on 970707-11.No Violations Noted. Major Areas Inspected:Area of Plant Support by Two Regional Safeguards Inspectors IR 05000395/19970081997-08-0808 August 1997 Insp Rept 50-395/97-08 on 970707-11.No Violations Noted. Major Areas Inspected:Plant Support ML20149G7371997-07-11011 July 1997 Notice of Violation from Insp on 970504-0614.Violation Noted:Licensee Did Not Preclude Repetition of Failure to Implement Storage Requirements ML20149G7411997-07-11011 July 1997 Insp Rept 50-395/97-05 on 970504-0614.Violations Noted.Major Areas Inspected:Licensee Operations,Maint,Engineering & Plant Support IR 05000395/19970061997-06-27027 June 1997 Insp Rept 50-395/97-06 on 970527-30.No Violations Noted. Major Areas Inspected:Physical Security Program for Power Reactors ML20140D4351997-06-0202 June 1997 Notice of Violation from Insp on 970323-0503.Violation Noted:On 970413,SOP-114 Not Implemented to Increase RB Pressure ML20140D4521997-06-0202 June 1997 Insp Rept 50-395/97-03 on 970323-0503.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support IR 05000395/19970011997-04-17017 April 1997 Insp Rept 50-395/97-01 on 970209-0322.No Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20147G2981997-03-10010 March 1997 Notice of Violation from Insp on 961229-970208.Violation Noted:Between 940628-961202,EFW Pump Quarterly SG low-low Actuation Slave Relay Test Was Not Performed within Required Frequency Specified in TS Surveillance Requirement 4.3.2.1 IR 05000395/19960151997-03-10010 March 1997 Insp Rept 50-395/96-15 on 961229-970208.Violations Noted. Major Areas Inspected:Operations,Maintenance,Engineering & Plant Support ML20134G6181997-01-27027 January 1997 Insp Rept 50-395/96-14 on 961201-28.Violations Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support ML20134G6061997-01-27027 January 1997 Notice of Violation from Insp on 961201-28.Violation Noted: SAP-142 Was Not Implemented & Provisions of Designated Storage Area Change Request 129 Were Not Complied with IR 05000395/19960131996-12-30030 December 1996 Insp Rept 50-395/96-13 on 961027-1130.Noncited Violations Identified.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20149M5921996-12-0606 December 1996 SALP Rept 50-395/96-99 for Period of 950129 Through 961026 IR 05000395/19960111996-11-25025 November 1996 Insp Rept 50-395/96-11 on 960908-1026.Violations Noted. Major Areas Inspected:Operations,Maint,Engineering & Plant Support 1999-08-30
[Table view] |
Text
- - _ .
I 9 :
ENCLOS_URE_1 oL I EXAMINATION REPORT 395/0L-86-&r Facility Licensee: South Carolina Electric and Gas Company ;
ATTN: Mr. D. A. Nauman, Vice President l' Nuclear Operations P. O. Box 764 (167) .
Columbia, SC 29218 Facility Name: V. C. Summer Facility Docket No.: 50-395 j Written and operating examinations were administered at V. C. Summer near Jenkinsville, South Carolina.
Chief Examiner: __
T.
dogers
//12"80 Date Signed Approved by: # tyf- pr y N - / 2 - Fr 6 olohn' . Munro( >ct'on Chief Date Signed Summary:
Examinations on August 13, 1986 and September 12, 1986.
Oral and simulator examinations were administered to three candidates; two of whom passed. Four candidates were administered written examinations; three of four candidates passed.
Based on the results described above, the one R0 candidate did not pass and the two SRO (IC) candidates did pass. Oral and Simulator examinations will be administered to the remaining SRO (IC) candidate at a later date.
l 1
l K .
8710060217 861113 PDR ADOCK 05000395 PDR l
i
_ _ _ _ _ _ _ _ _ J
-t i 1
REPORT DETAILS
- 1. Facility Employees Contacted:
- J. Heilman, Associate Manager, Nuclear Operations Education and Training
- T. Matlosz, Nuclear Operations Training Supervisor
- M; Williams,. Manager, Nuclear Operations Education and Training
- 2. . Examiners:
C. Casto J.'Munro
=J. Arildsen
- 3. Examination Review Meeting .
1 At the conclusion of the written examinations, the examiners provided T. L.
Matlosz with a copy of the written examination and answer key for review.
The comments made by the facility reviewers are included as Enclosure 3 to this report, and the NRC Resolutions to these comments are listed below.
- a. SRO Examination . Analogous R0 questions are in parenthesis Question 5.01 b.3.
NRC Resolution:
Utility comments not accepted. Due to insufficient detail provided in the enclosure to support the facility comment, no change to the answer key is warranted. Training materials thould be updated to reflect this information.
Question 5.13 (1.14)
NRC Resolution:
Utility comment accepted, Additional answers from Technical Specification 3/4.1.3 bases are acceptable for full credit.
V. .C. Summer Reactor Theory publications should be modified to reflect this information.
- m. .
'Y $
2 Question 6.05(2.08)
A post-examination review of this question cy the examiners determined that this question should be deleted since many of the sources of water to the BRS are not." systems".as stated in the question. The utilities training material, including Systems Descriptions AB-11, should be corrected to properly categorize these sources of water.
Question- 6.06 (2.09)
NRC Resolution: ;
Utility comment' accepted. Question deleted due to equipment removal.
Training materials have 'not . incorporated these plant.. changes. Such-materials should be modified to reflect current plant design, Question 6.14 (2.16)
NRC Resolution:
Utility comment not accepted. The utilities system description of the service water system clearly describes the capability for independent loop operation. This requires that a " specific back-up source of emergency feedwater" be identified in such a manner as to be loop i specific.
Question 7.11 NRC Resolution:
Utility comment accepted. The answer is modified not to require parameter values.
Question 7.20 NRC Resolution:
Utility comment accepted. Either "for life saving operations" or "for ,
search and rescue for KNOWN missing persons" is acceptable.
Question 7.22 (4.22)
NRC Resolution:
Utility comment accepted. Due to the lack of question specificity, either the original answer or any one of the additional answers provided for SOP-114 is acceptable for full credit. The utilities systems description, IC-5, should be modified to reflect the explicit systematic requirements.
- - i
I s t 3
Question 7.23 b. (4.23)- .,
l NRC Resolution:
The utilities procedure GOP-3 clearly
~
I Uti1ity comment not accepted.
states the review requirement of within four hours of criticality.
This will be true despite any postulated delays which may further limit the time of review. (i .e. 'The completion of the ECC calculation being
.less than three hours prior to criticality, such as could be postulated due to a recalculation required by the cr'ticality no longer expected
'to occur within the two hours of ' the initial estimated time of criticality.) Therefore, the answer remains unchanged. However, full credit will be given for a specific answer stating the requirement to
" Recalculate or reverify" the ECC if criticality will not occur within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of the estimated time of criticality (REP-109.001).
- b. R0 Examination Ouestion 3.09 NRC Resolution:
Utility ' comment accepted. The additional answer from the Westinghouse Tech Manual for solid state protection system is acceptable as one of the three answers required for full credit. The utilities training material, including Systems Description IC-9, should be modified to reflect this additional information.
4, Exit Meeting At the conclusion of the site visit, the examiners met with representatives of the plant ' staff to discuss the results of the examination.
There were no generic weaknesses noted during the oral examination.
The cooperation given to the examiners and the effort to ensure an atmosphere.in the control room conducive to oral examinations was also noted and appreciated.
The licensee did not identify as proprietary any of the material provided to or reviewed by the examiners.