ML20235L051

From kanterella
Jump to navigation Jump to search
Forwards Proprietary Draft WCAP-12132, Surge Line Stratification Presentation Overheads - Georgia Power/Nrc Meeting - 890124. Rept Withheld (Ref 10CFR2.790)
ML20235L051
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 02/02/1989
From: Bailey J
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20011C544 List:
References
GN-1574, NUDOCS 8902270355
Download: ML20235L051 (2)


Text

_- . _ - _

L 6 Georgia Power Company f Post Office Box 282 l'* Waynesboro, Georgia 30830 Telephone 404 554-9961 l- 404 724 8114 L Southern Company Services. Inc.

! Post Office Box 2625 Birmingham. Alabama 35202 h

Telephone 205 870 6011 VOgtle Project February 2, 1989 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk File: X7BC35 Washington, D. C. 20555 Log: GN-1574 PLANT V0GTLE - UNIT 2 NRC DOCKET NUMBER 50-425 CONSTRUCTION PERMIT NUMBER CPPR-109 R

P_RESSURIZER SURGE LINE STRATIFICATION Gentlemen:

Attached are slides presented by Westinghouse at the GPC/NRC meeting on Pressurizer. Surge Line Stratification held in your offices on January 24, 1989. Please note that. the attachments contain information which is proprietary to Westinghouse Electric Corporation.

Accordingly we request that this information be withheld from public disclosure.The slides are Westinghouse Proprietary Class 2.

We are providing only the proprietary version at this time in order to facilitate the review of this information by the Commission in~

connection with the review of the thermal stratification methodology to the Alvin W. Vogtle pressurizer surge line. We will comply with the requirements of 10CFR2.790 to provide proprietary and non-proprietary versions together with an affidavit as soon as the proprietary information contained in the submittal has been specifically identified and the proprietary and non-proprietary versions have been prepared. We expect to submit the required number of copies of the proprietary and non-proprietary version of the information and the required affidavit within two weeks.

In the meantime, we have prepared sufficient copies for you to initiate your review. E. Shomaker, Esq., of the NRC Office of General Counsel, has advised Westinghouse that he concurs with this procedure.

hY

' 4 l

8902270355 890202 PDR ADOCK 05000425 A PDC ,,

___ __ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ __ _ .- - - - - . -. . _ . _ __ ._ o

L.

File: X7BC35 Log: GN-1574~

Page two 1

If your staff-'should require' additional information, please do not l . hesitate to contact me.

Sincerely,

. (4. --h l

J..A. Bailey Project Licensing Manager JAB /wk1' Attachment xc: NRC Regional Administrator-

NRC Resident Inspector P. D. Rice L J. P.'Xane

.R. A. Thomas.

B. W. Churchill, Esquire J. E. Joiner, Esquire.

J. B. Hopkins (2)

G.' Bockhold, Jr.

R. J. Goddard, Esquire i<. W.'McManus Vogtle Project File .

1

)

i l

I I

4

. . . . __- 1