ML20235K443
ML20235K443 | |
Person / Time | |
---|---|
Issue date: | 09/25/1987 |
From: | Aikens H, Wiggins E NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), TRANSWALL CORP. |
To: | |
Shared Package | |
ML20235K420 | List: |
References | |
CON-FIN-B-4160, CON-NRC-10-87-203 NUDOCS 8710050089 | |
Download: ML20235K443 (6) | |
Text
.
s ..
's
- 3. CON I H ACT 60 C000 . PAGE - OF PAGLS ' .
AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1 3 <
l
- 2. AMENOMCNT/MOOlf tCATeON NO. 3. 0F FECT 4VC OAT E 4. 40QU4 54 T EON /PU H ChASC .H E Q. NO. 5. PHOJ ECT NO. (t/ opp 14ce64c) .
' l Five (5) 8/24/87 ADM-87-203 dated 8/21/87
- s. iS$vc0 ov i. AOuiNisIcHco av <uon.<r ta.n nem si j U.S. Nuclear Regulatory Commission .
Division of Contracts '
Washington, DC 20555 , j
- e. NAMC AND ADOHL5h OF CONT H AC T OH (No street. county. State and Zil' Code) y 9A. AMCNOMENT OF SOL 8 CITATION NO. .
Transwall Corporation
- I l
143 Pennsylvania Avenue- ,, , yy y., , ,,
Malvern, PA 19355-2491 10A. MOOaFICAitON OF CON TR ACT/OHOCH NO.
X NRC-10-87-203 SOU, OAT LD (SEE ITEM 13)
CODE l FACILITY CODE -
- )
l 11. THIS ITEM ONLY APPLIES TO AMENDMENTS.OF SOLICITATIONS ,
, The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not ex-tended.
-l Of fers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended. by one of the following methods: ';
tal OY Completing items 0 and 15, and returning ce>pic. Of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) Dy separate letter or telegram which includes a reference to the solici.ation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG.
MENT TO BE RECEtVEO AT THE PLACE DESIGNATED FOR THE RECElPT OF OFFERS PRIOR TO THE HOUR ANO DATE SPECIFIED MAY RESULT IN HEJECTiON OF YOUR OFFER if by virtue of this amendment you desire to change an of fer already submitted, such change may be made by telegram or letter. provided each telegram or letter makes reference to the solicitation and this amendment. and is received prior to the opening hour and date specified.
- 12. ACCOUNTING AND APPROPHi AlION C,ATA (// required)
B&R No. 43-20-26-320 FIN B4160 Obligated: $57,964.50 l
- 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRA. CTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO AS DESCRIBED IN ITEM 14
" " 8""#'""*'""'"'C"^"SS "'"'""^"'"^"'"'C
) V8
^' MCS"8"Oc5fNO.% 3MYR."""S"^"' ' "'
l L
D. THE ABOVC NUMBERCO CONTHACT/OROCH IS MOOlFiEO TO HCFLECT T HE ADMsNISTR ATIVC CHANGCS (such as changes in paying office, I eppropriorion date, etc.) SCT FORTH IN t TEM 14, PUR$UANT TO THE AUTHORITv OF F A R 4 3.103(b),
C. THis SUPPLE MEN T AL ACH ELMEN T 15 Ef4T E H LO INT O PURSU AN T TO AU THO Hf T Y OF:
X " Changes" Clause and mutual agreement O. O T HLH ISpectly tree of modniscatnon and au thorityI
{MPORTANT: Contractor O is oot. O is required to Sign this document and reiurn2 Copics to the issuing office.
3 e. OL5C HIPT ION OF AM LNOMLN T/MOOtV IC AT ION LOrganned by UCl'section headings, including schcitation/ con tract su bject matter where feasible.)
SEE PAGES TWO THROUGH THREE AND ATTACHMENTS l
8710050089 870925 ,
PDR CONTR NRC-10-87-203 PDR Cace as previoed heseen. 484 terms and coeditic.ns of the cocument #eferenced in item 9A of 10A, as heretofore Changed. remains unchanged and in full force
^
!$A. N AMC AND T 4 T LE OF SIGNCH (Type or print) 46A. N AME AND TI TLE OF CONT HACT (NG OFFICCH (Type oe prinft hh\ 1/O F 40 e4 Q '
g y 3 5C. OATC SeGN0b 160. UN d LO ST AT Elois J. Wiggins OF AM HIC A 36C.DATE SaGNCO CON Tb. I .
.o gf\e, a i i. Au 74 g7 tysnfrurb of pehqnjushorned to sit %) LSitnelurt of Con (nyH)ng Officer) _
NSN 754041152 8070 "
30 105 STANDAnO FORM 30 (HEV.10-6 3)
PACVIOUS COITION UNUSAoLC Preuritwo by GSA
d NRC-10-87-203 Modification No. 5 Page 2 The purpose of this modification is to authorize acceleration of I the schedule for the delivery and installation of the demountable wall system at One White Flint North (OWFN). All work shall be performed in accordance with the delivery schedule specified in the attached Statement of Work and the contractor's proposal dated August 19, 1987, as revised on August 25, 1987, September ]
2, 1987 and negotiations held on September 22, 1987 and September l 24, 1987, which are all incorporated herein by this reference.
The parties agree to the following changes:
A. Section B - Suggileg_gt_ Services _and_Pt icesLCggtg 1
1
- 1. Paragraph B.2.B " Price List", is revised to add the j following as Item 5: ;
- 5. Accgletatigg_Eiignt_Pt ice_ List The contractor will be paid for accelerated installation of demountable wall units at building One White Flint North at the d p rate of $8.50 per linear foot of partitions (demountable walls) installed for floors 2 - 12 and 14. Payment for the 13th floor will be made at the rate of $4.00 per linear foot of partitions installed. The total actual payment to be made for the accelerated effort will be determined by the combined total linear feet of partitions installed for all floors listed on the j accelerated schedule. j i
- a. Installation of Demountable Wall Partitions - Floors 2 -12 and 14:
(Est.) 6113 LF @$8.50/LF ............NOT TO EXCEED $51,960.50 l
- b. Installation of Demountable Wall Partitions - Floor 13:
(Est.) 501 LF @$4.OO/LF..............NOT TO EXCEED $2,004.00
- c. Delivery of Materials for the 17th and 18th Floors of Building 1: )
(Est.) 4 deliveries @$1,000.00 each....NOT TO EXCEED $4,000.00 TOTAL PRICE - ACCELERATED EFFORT.......NOT TO EXCEED $57,964.50 TOTAL CONTRACT PRICE ..................... $1,524,114.10 i
j
~
. I l
NRG-10-87-203 Modification No. 5
~
Page 3 l l
- 2. Paragraph B.3, " Consideration and Obligation" - in subparagraph 6, the first sentence is deleted in its entirety 'and the following sentence is substituted in lieu thereof:
"The amount presently obligated with respect to_this contract is
'$826,539.50.
B. Paragraph C.1.2 " Scope of Work" is revised'to include the Statement of Work id?ntified as Attachment.1 to this modification.
C. Paragraph G.3 " Invoice Requirements", is' revised to include the following inf ormati on:
"Occelstated_lestelletiso_Eiigct_ _Buildigg_ggg_ White _Eligt Ngtth
\
Invoices submitted for installations performed under the I accelerated schedule as specified herein,'shall show materials I g and installation costs billed as separate line ' items, . or a separate invoice shall be submitted for installation costs.
D.Section I, " Contract Clauses - FAR Clause. 52.249-14' entitled j
" Excusable Delays", is hereby added. The text of the clause is included as attachment 2 of this modification.
E. All other terms and conditions of the contract remain unchanged. l 1
1 1
l t
l
( 1 l
i NRC-10-87-203.
Modification No. 5 i Attachment 1 STATEMENT OF WORK
- 1. The contractor shall furnish all labor and materials required L to accelerate the delivery and installation of the demountable wall system at One White Flint North (OWFN). Installation shall
- be completed in accordance with the following schedule
Installation 1 El99C_Ngt Delivgty_Qatg Cgmp _1gtign_Datg 16 8/20/87 9/28/87*
15 9/1/87 10/5/87*
13 9/14/87 10/1/97*
12 9/21/87 10/5/87 l
11 9/28/87 10/12/87 1 10 10/5/87 10/19/87 9 10/12/87 10/26/87 14 10/19/87 11/2/87 B&2 10/26/87 11/9/87 7 11/2/87 11/16/87 6 11/9/87 11/23/87 5 11/16/87 12/1/87 4 11/23/87 12/8/87 j 3 12/2/87 12/15/87 17 12/16/87 1/11/88 i
- Although floors 13, 15 and 16 are listed in the above l schedule, the increased rate for work performed under the )
accelerated effort shall not be paid for installation work on those floors. As agreed by the contractor on September 24, 1987, payment for the 15th and 16th floors of OWFN shall be made in accordance with the unit prices established in Section B of the contract. Payment for the 13th floor will be made at the rate negotiated on September 24, 1987.
- 2. The contractor will be given exclusive use of the loading dock and two elevators at OWFN on the week day scheduled for delivery of wall systems. The NRC will assure that.the corridor ,
from the loading dock to the elevators will, allow the contractor 1 unencumbered movement of materials. Upon receipt of notification-that deliveries of glass, wood doors or additional panels and accessories, may be necessary, the NRC Project Officer will provide the contractor with access to the loading dock, or alternative access to the building (i.e. the garage) , . and one el egator unlesu conflicts occur with the schedule activities of other !
contractors or the building maintenance staff.
e 4 I
)
NRC-10 87-203 Modification No. 5 Attachment 1 I
- 3. Access to the installation site at nights or on weekends !
shall be scheduled with the Project Officer in advance of overtime performance. ;
- 4. Installation of baseboard and ceiling trim shall be performed l after completion of work by electrical and communications
- contractors.
i
- 5. All demountable wall offices must be completed in sufficient j time to allow overlapping Haworth Systems products to be j delivered and staged on each floor, two days preceding the scheduled completion of wall installations. All remaining l glazing, trim placement and final adjustments to walls, must be completed by the dates specified herein. ;
- 6. Due to the anticipated occupancy status of OWFN, the delivery of materials for the 17th and 18th floors of the building may be required after normal business hours. The NRC Project Officer j shall provide the contractor with notification and instructions concerning such deliveries.
- 7. Inspection and acceptance of installation work shall be made in accordance with the terms and conditions of Section E of the contract.
l
0 9
NRC-10-87-203 Modification No. 5 Attachment 2 1
EXCUSADLE DELAYS (APR 1984)
(a) Except for defaults of subcontractors at any tier, the Contractor shall not be in default because of any failure to perform this contract under its terms if the failure arises from causes beyond the control and without the fault or negligence of the Contractor. Examples of these causes are (1) acts of God or of the public enemy, (2) acts of the Government in either its sovereign or contractual capacity, (3) fires, (4) floods, (5) epidemics, (6) quarantine restrictions, (7) strikes, (B) freight
- embaigoes, and (9) unusually severe weather. In each instance, the f ailure to perf orm must be beyond the control and without the fault or negligence of the Contractor. " Default" includes failure ,
to make progress in the work so as to endanger performance.
(b) If the failure to perform is caused by the failure of a subcontractor at any tier to perform or make progress, and if the causes the failure was beyond the control of both the Contractor l and subcontractor, and without the fault or negligence of either, the Contractor shall not be deemed to be in default, unless (1) The subcontracted supplies or services were obtainable from other sources; h (2) The Contracting Officer ordered the Contractor in writing to purchase these supplies or services f rom the other ,
source; and 1 (3) The Contractor failed to comply reasonably with this l order.
(c) Upon request of the Contractor, the Contracting Officer shall ascertain the facts and extent of the failure. If the Contracting Officer determines that any failure to perform results form one or more of the causes above, the delivery ,