Submits Daily Highlight.Memo of Agreement Signed Between Joint Intervenors & Util on Facility Decommissioning Plans. Motion to Terminate Hearing Will Be Filed W/Aslb by Parties to Proceeding
ML20235K368
Person / Time
Site: Humboldt Bay
Issue date: 07/09/1987
From: Erickson P
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Sniezek J
NRC
References
NUDOCS 8707160288
Download: ML20235K368 (3)


Text

_ _ - - - - - - - - _ _ _ - - - - - _ _ _ . - - - - - _ _ - - - - - - . ___ - - - - - _ _ _ _ _ _ _

, July 9, 107 MEMORANDUM FOR: T. Murley J. Partlow '

J. Sniezek F. Congel F. Miraglia H. Miller R. Starostecki S. Black i S. Varga B. Boger D. Crutchfield G. Lainas  !

L. Shao F. Schroeder l C. Rossi G. Holahan I S. Richardson A. Thadani W. Lanning R. Cooper THRU: Herbert N. Berkow, Director Standardization and Non-Power ,

Reactor Project Directorate l Division of Reactor Projects III, IV, V and Special Projects J FROM: Peter B. Erickson, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects

SUBJECT:

DAILY HIGHLIGHT - AGREEMENT BETWEEN PG8E AND INTERVEN0RS ,

ON DECOMMISSIONING, HUMBOLDT BAY POWER PLANT UNIT N0. 3 i A memorandum of agreement has been signed between the joint interveners and Pacific Gas and Electric Co. (PG&E) on the Humboldt Bay Unit 3 decommissioning plans. A stipulation that all contentions by the interveners are withdrawn and/or a motion to terminate the hearing will be filed with the ASLB by the parties to the proceeding. If the Board agrees, the hearing will be terminated.

The agreement between PG&E and the interveners states that PG&E agrees to:

1) ship the spent fuel assemblies to DOE as soon as DOE has a repositor I some other facility in operation capable of receiving the fuel; and 2) y or I complete final decommissioning of Unit 3 soon after shipment of the fuel and I after receipt of appropriate approval from the NRC. The agreement also states )

that the interveners agree to withdraw their contentions. '

original signed by I Peter B. Erickson, Project Manager l l Standardization and Non-Power j Reactor Project Directorate l 1 Division of Reactor Projects III, IV, l V and Special Projects P. Erickson i NRR/PDSNP i Ext. 28280 l 0 1 PDSNP- PDSNP PDSfP EHf1 ton PErickson:cw HB'e 2w 07/q/87 07/C{ /87 07/ /87 8707160288 070709 PDR ADOCK 05000133 ,

W PDR l

-_.____________________j

l h UNITED STATES

![to,uanc%

[ i NUCLEAR REGULATORY COMMISSION c, . ^j , u . y WASHINGTON, D. C. 20555 g c. a

%, v / July 9, 1987

....+

MEMORANDUM FOR: T. Murley J. Partlow J. Sniezek F. Congel F. Miraglia H. Miller R. Starostecki S. Black i S. Varga B. Boger  !

D. Crutchfield G. Lainas ,

L. Shao F. Schroeder '

C. Rossi G. Holahan i S. Richardson A. Thadani W. Lanning R. Cooper ,

1 THRU: Herbert N. Berkow, Director , j Standardization and Non-Power

  • I Reactor Project Directorate l Division of Reactor Projects III, IV,  ;

V and Special Projects l l

l FROM: Peter B. Erickson, Project Manager Standardization and Non-Power Reactor Project Directorate Divis ion of Reactor Projects III, IV, V and Special Projects

SUBJECT:

DAILY HIGHLIGHT - AGREEMENT BETWEEN PG&E AND INTERVENERS ,

j ON DECOMMISSIONING, HUMBOLDT BAY POWER PLANT UNIT N0. 3 l l

A memorandum of agreement has been signed between the joint interveners and Pacific Gas and Electric Co. (PG&E) on the Humboldt Bay Unit 3 decommissioning

, plans. A stipulation that all contentions by the interveners are withdiawn -

I and/or a motion to terminate the hearing will be filed with the ASLB by the parties to the proceeding. If the Board agrees, the hearing will be terminated.

1

The agreement between PG&E and the interveners states that PG&E agrees to

I) ship the spent fuel assemblies to DOE as soon as DOE has a repositor some other facility in operation capable of receiving the fuel; and 2) y or complete final decommissioning of Unit 3 soon after shipment of the fuel and after receipt of appropriate approval from the NRC. The agreement also states that the interveners agree to withdraw their contentions.

Peter B. Erickson, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects P. Erickson NRR/PDSNP Ext. 28280 a

s o < .4 3 9 i

.. July 9, 1987 '

DISTRIBUTION: 1 g'.

Docket. File- q NRC & Local PDR I PDSNP Readirig j TMurley/JSniezek  !

FMiraglia 1 DCrutchfield PErickson EHylton  ;

HBerkow Wlanning OGC-BETH EJordan JPartlow ACRS(10)

GPA/PA VWilson i BKolostyak HBClayton k

l l

l i,

l i

i, 1

l I

_ _ _ _ - _ _ - _ -