ML20235J622

From kanterella
Jump to navigation Jump to search
Summary of 870902 Meeting W/Nuclear Assurance Corp in Silver Spring,Md Re Model NAC-1 Cask
ML20235J622
Person / Time
Site: 07109183
Issue date: 09/28/1987
From: Odegaarden R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To:
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
NUDOCS 8710020032
Download: ML20235J622 (2)


Text

.

l DISTRIBUTION:

SGTB r/f NMSS r/f to l

SEP s8 W RH0degaarden E.Dayjg I

CEMacDonald ggg,N Region II ENRCLPDR%

Meeting" Attendees Meeting Notebook SGTB: RHO 71-9183 MEMORANDUM FOR:

The Files i

FROM:

Richard H. Odegaarden, Sr. Nuclear

]

Process Engineer i

Transportation Branch, i

Division of Safeguards and Transportation, NMSS 1

SUBJECT:

MODEL NO. NAC-1 CASK l

l Attendees NAC NRC Larry Danese Ross Chappell George Dixon Charles Williams l

Dick Odegaarden Introduction A meeting was held at the request of Nuclear Assurance Corporation (NAC) at Silver Spring, Maryland, on September 2,1987, concerning the Model No. NAC-1 cask.

Discussion Model No. NAC-1 Cask l

On September 2, 1987 NAC meet with NRC staff member to discuss two unrelated incidents with Model No. NAC-1 casks.

In the first incident a cask cavit.y vent valve was accidently left open due to operator error.

Because of the nature of the fuel being transported (dry) and the closure of the valve box by a cover, no significant radioactivity was released.

The valve box is being modified to reduce the possibility of operator error.

In a second incident, the lid of an " empty" cask lid was welded closed by DOE because of primary lid gasket failure.

(The DOE facility lacked provisions to remove the lid and replace the gaskets.) NAC discussed steps they are planning to take to restore the cask to service.

Because of the welding and subsequent weld removal the cask no longer meets the drawing dimensions required by the package certificate of compliance.

8710020032 870928 PDR ADOCK 07109193 C

pop u______-__

The Files NAC will submit the repair procedures in writing to NRC prior to the actual repairs.

It appears based on visual and leak tests that the lid seal area was not effected.

Ortinelt%nedW Richard H. Odegaarden, Sr. Nuclear Process Engineer Transportation Branch Division of Safeguards and Transportation, NMSS 1

1 l

o l

l l

nitfT7

.[..

.....[

[$'

NAME:RH0degaarden:CRCHappell:

.......................g...................................................

DATE:09/is'87:wlb:09/qw/87:

/

OFFICIAL RECORD COPY

,