Advises That Schedule for Util Commitment to Issue Nuclear Engineering Procedures for Permanent Design Control Sys Will Be Extended to 870930.Addl Experience W/Present Transitional Design Control Sys Necessary Before Finalizing Procedures
ML20235J558
Person / Time
Site: Sequoyah  
Issue date: 07/09/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8707150637
Download: ML20235J558 (2)


Text

_ - _ _.

TENNESSEE VALLEY AUTHORITY CH ATTANOOGA TENNESSEE 37401 I

SN 157B Lookout Place

]

JUL 091987 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-327 Tennessee Valley Authority

)

50-328 SEQUOYAH NUCLEAR PLANT (SQN) - REVISION TO COMMITMENT FOR PERMANENT DESIGN CONTROL SYSTEM PROCEDURES

Reference:

TVA letter to B. J. Youngblood dated February 27, 1987, "Sequoyah Nuclear Plant - Draft Safety Evaluation Report - Design Baseline and Verification Proc, ram" In the referenced letter TVA committed to issue the Nuclear Engineering Procedures (NEPs) for the permanent design control system by June 30, 1987.

Additional experience with the present transitional design control system at SQN is necessary before finalizing the permanent design control system procedures. TVA is therefore extending the schedule for issuance of the subject NEPs to September 30, 1987.

If you have any questions concerning this issue, please telephone Beth L. Hall, of the Sequoyah Site Licensing Staff, at (615) 870-7459.

Very truly yours, TENNESSEE VALLEY AUTHORITY A/

o R.Gridley,D}gector Nuclear Safety and Licensing cc:

See page 2 P

l 0 i

An Equal Opportunity Employer

1 e t U.S. Nuclear Regulatory Commission 09 E87 j

l l

\\

l cc:

Mr. G. G. Zech, Assistant Director I

for Inspection Programs Office of Special Projects U.S. Nuclear Regulatory Commission Region II l

101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 i

Mr. J. A. Zwolinski, Ass?, tant Director l

for Projects Division of TVA Projects office of Special Projects U.S. Nuclear Regulatory Commission 4350 East West Highway EWW 322 i

Bethesda, Maryland 20814 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road j

Soddy Daisy, Tennessee 37379 j

i

)

l l

l 1