ML20235H888
| ML20235H888 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 01/31/1989 |
| From: | Newburgh G, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| MP-12761, NUDOCS 8902240097 | |
| Download: ML20235H888 (5) | |
Text
g1 4
1:-.
y-I
]
... c,
J
[*
-. AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-245' UNIT > Millstone 1-j l
DATE 890202 COMPLETED BY G. Newburgh TELEPHONE (203)'447-1791 Extension 4400-MONTH -January, 1989
. DAY AVERAGE DAILY POWER LEVEL DAY' AVERAGE DAILY POWER LEVEL (MWe-Net) l' 660 (MWe-Net)-
17 660~
2
'661 18 659-
.3 584 19 659 4
622 20 659 5
660 21 660 6.
660 22 660
.7=
661 23 649'
.8 661 24 659 9
660 25 660 10
-660 26 660 11' 660 27 659 12 660-28 659 13 660 29 659 14 660 30 659 15 660 31 659 16 637 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Computer to the nearest whole megawatt.
(tC b
22
( )
A e
- J. e.
k
)
d if REFUELING INFORMATION REQUEST 1.
Name of facility: Millstone 1 1
2.
Scheduled date for next. refueling shutdown: APRIL 1989 3.
Schedule date for restart following refueling: MAY 1989 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes, Technicial Specification Changes Regarding:
(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5.
Scheduled date(s) for submitting licensing action and supporting j
information:
Winter 1988-89 6.
Important licensing considerations associated with refueling, e.g., new-or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating.
procedures:
196 GE8B Fuel Assemblies 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a)
In Core:
(a) 580 (b) 1732 8.
The present licensed spent fuel pool storage capacity and the_ size of any increase in licensed storage capacity that has been requested or is planned, in number.of fuel assemblies:
Present capacity, 2184 assemblies Requested increase, 1045 assemblies 9.
The projected date of the last refu'eling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1987, Spent Fuel Pool, Full Core Off Load Capability is Reached Temporary rack approved for installation if required; plans for additional capacity in progress.
l l
l
1 l
3 OPERATING DATA REPORT
+
DOCKET NO.
50-245 l
DATE 890202 COMPLETED BY G. Newburgh TELEPHONE (203)447-1791 i
Extension 4400 I
' OPERATING STATUS j
{
1.
Unit Name: Millstone 1 2.
Reporting Period: January, 1989 Notes:
J l
3.
Licensed Thermal Power (MWt): 2011 4.
Nameplate Rating (Gross MWe): 662 5.
Design Electrical Rating (Net MWe): 660 6.
Maximum Dependable Capacity (Gross MWe): 684 7.
Maximum Dependable Capacity (Net MWe): 654 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons: N/A 9.
Power Level to Which Restricted, If Any (Net MWe): N/A
- 10. Reasons For Restrictions, If Any: N/A This Month.
Year to Date Cumulative 11.
Hours In Reporting Period 744 744 159,336
- 12. Number Of Hours Reactor Was Critical 744 744 125,731.6 13.
Reactor Reserve Shutdown Hours 0
0 3,283 3
.14.
Hours General On-Line 744 744 122,541.1
- 15. Unit Reserve Shutdown Hours 0
0 93.7
- 16. Gross Thermal Energy Generated (MWH) 1,483,739 1,483,739 228,668,400
- 17. Gross Elec. Energy Generated (MWH) 508,900 508,900 77,,072,496
- 18. Net Electrical Energy Generated (MWH) 487,138 487,138 73,537,578
- 19. Unit Service Factor 100 100 76.9
- 20. Unit Availability Factor 100 100 77.0
- 21. Unit Capacity Factor (Using MDC Net) 100.1 100.1 70.6
.22.
Unit Capacity Factor (Using DER Net) 99.2 99.2 69.9
- 23. Unit Forced Outage Rate 0
0 10.6 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Rufueling Outage, April 1, 1989, 35 day duration.
25.
If Shutdown at End of Report Period, Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forcast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY N/A COMMERCIAL OPERATION
1i!
]1lll1 1I 1ll l
1l 1
1i ild.
.I a
a' a
v' c
i n
t e
4 c
r eor a
rt u r
c one CoR i
&tt 0
cn 1
0 eAe s
e 9
4 s
v n
e e
l H 7 4
u e
oase c~
G 1
a r
it nl r
E R
n C
P taei u
N U
7 o
cDcF o
O B
4 i
u i
S 5
T 2 W 4
s rfL) 4 S
0 E
)
n t o R
e 2
L 2
N3 e
s rE m
L 0
0 t
t nnoL a
0 I
9
. 2 x
n I of(
S 5
M 8 G
E es i
(
ne t st)
.EEYE od at r1 OMTBN po Greo6 1
NAA O
mC a e p1 NDDH o
t ph e0 t
T EP C
i eSR -
b KI EL iP ytE i
CN LE h
rnR h
OU PT md xrt eU x
D M
ee EonvN E
O td 8 FEE (
s C
so yC S
m n
)
amho) n e
i roti0i e
mcrnt a
stt aSf mu=l oc
. S nnr r
p N
eeo ccd d nx O
cvp SieseoE I
iE e t uuRi(
T L
R
- ll ano t
C 9
daamiirar U
8 ouuot vere D
9 h nnt newuh E
1 3
t aauoroDt R
r A
eM M
M A C pP ( O Y
f o
/
.R R
o gt N
3 1234 5
6 E
A nc W
U dia O
N ot e P
A htR J
t u n
D eh n o
N MSw i
A H
o t
T D
a S
N n
N O
i W
M 2
m O
n a
D T
o x
T R
s E
U O
a H
P e
)
e
)
S E
R n
s n
R i
n i
T a
e a
I l
c l
N p
ni p
U n
x oL x
o)
E i
E i s
( t t f.
(
t r s
c au ee i g r
ro rT rn o
uH u
ti r)
D(
l r snern i o eivEi a
Rai a
Fe rtll l
c yT a a p e
t ngr rnx p
nanort oE y
enit osi(
T mel atit
~
npt el anar oi n u u ri r e suif gemeh a q a e e pd pt eEMRROAOO e
R - -
t 2 ABCDEFGH a
D de l
du ed ce
.o rh N
oc FS FS l,j ii
. NORTHEAST UTILITIES o.nore Orvic:.. see:n sir i. B.rnn. conn.cucui c m c,e.c mo.o.c-(
l
.wim si.weas en.c c"*'
P.O. Box 270
[
o.o r..,..o.r. co.. "
HARTFORD. CONNECTICUT 06141-0270 J C'.'.He'."l%','c"~.
(203) 665-5000 k
L February 13. 1989 MP-12761 Re:
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555
Reference:
Facility Operating License DPR-21 Docket No. 50-245 i
Dear Sir:
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the follcwing monthly operating data report for Millstone Unit 1 is enclosed. One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY
).e/?
(
ctd2 Strphdn E.
cace Station Superintendent Millstone Nuclear Power Station SES/GSN:jlm
Enclosures:
(4) cc:
Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D.C.
(10)
Director, Office of Resou.rce Management William Raymond, Senior Resident Inspector fk I(
_