MISSISSIPPI POWER & LIGHT COMPANY SYSTEM ENERGY RESOURCES, IN1
]
1 SOUTH MISSISSIPPI ELECTRIC POWER ASSOCIATION DOCKET NO. 50-416 i
J GRAND GULF NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE l
1 Amendment No. 55 License No. NPF-29 1.
The Nuclear Regulatory Comission (the Comission) has found that A.
The application for amendment by System Energy Resources, Inc.,
(the licensee), dated August 19, 1988, as supplemented October 10, 1988, complies with the standards and re Energy Act of 1954, as amended (the Act)quirements of the Atomic
, and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and i
safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
l F
515 990215 p
OCK 050004 g PDC L____-----------
e 1
l 2 _-
2.
Accordingly, the' license is amended by changes to' the Technical
. Specifications, as-indicated in the attachment to this license amendment; and' paragraph 2.C.(2) of. Facility. Operating License No. NPF-29 is hereby amended.to read as follows:-
I (2)-TechnicalSpecifications.
The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No. 55, are hereby incorporated into this license.
System Energy Resources, Inc. shall' opera *.e the facility.
in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION S
Edward A. Reeves, Acting Director Project Directorate II-1 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
February 15, 1989 C.
M nm
: --- U- ----- : -- M -@------:
. h l PR:PM:PD DRPR:BC:
LB. DEST:D:PD24 RPR : OGC 0FC :LT F P2}----:---
..._ _ : _. dar.
er:
- JCr lg
- EReeves
' NAME : MA% on : LK n
________.:....______..:__P__k%b:______
..___:_____.._____:____________:h_&/89
- 0Ni@/89 DATE :01/3C/89
- 01/76 /89 O
i
\\'
0FFICIAL RECORD COPY
1 4
ATTACHMENT TO LICENSE AMENDMENT NO. 55
<,o
)
FACILITY OPERATING LICENSE NO. NPF-29 DOCKET NO. 50-416 Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.
Remove Insert 3/4 9-8 3/4 9-8 I
l.
i
i s.
~
REFUELING OPERATIONS 3/4.'7.'6 REFUELING EQUIPMENT REFUELING PLATFORM f
i LIMITING CONDITION FOR OPERATION 3.9.6.1. The refueling platform shall be OPERABLE and only the main hoist shall be used for handling fuel assemblies.
APPLICABILITY:
During handling of fuel assemblies or control rods in the primary containment with the refueling platform.
ACTION:
With tne requirements for refueling platform OPERABILITY not satisfied, 4
suspend use of any inoperable refueling platform equipment from operations involving the handling of fuel assemblies or control rods after placing the load in a safe condition.
SURVEILLANCE REQUIREMENTS k:
4.9.6.1 Each refueling platform hoist to be used for handling fuel assemblies or control rods shall be demonstrated OPERABLE within 7 days prior to the i
handling of fuel assemblies or control rods:
In the containment fuel pool, reactor cavity or reactor pressure a.
vessel by:
1.
Demonstrating operation of the slack cable cutoff on the main hoist when the total cable load is 50110 pounds.
2.
Demonstrating operation of the grapple engaged loaded interlock on the main hoist before the total cable load exceeds 535 pounds.
3.
Demonstrating operation of the jam cutoff on the main hoist before the total cable load exceeds 1250 pounds.
4.
Demonstrating operation of primary and redundant overload cutoff on the auxiliary hoists before the load exceeds 550 pounds.
b.
In or over the reactor pressure vessel by:
1.
Demonstrating operation of the downtravel cutoff on the main hoist'when the bottom of the grapple is > 1.0 inch above the top guide.
2.
Demonstrating operation of the primary and redundant fuel load interlocks on the main hoist before the total cable load exceeds 600 pounds.
GRAND GULF-UNIT 1 3/4 9-8 Amendment No.