Final Deficiency Rept 87-16 Re Improper Installation of Bisco LOCA Seals in Conduits Containing Rockbestos Cable. Initially Reported on 870518.Rework on All Seals Completed
ML20235H181
Person / Time
Site: Beaver Valley
Issue date: 06/17/1987
From: Carey J
DUQUESNE LIGHT CO.
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
2NRC-7-161, 87-16, NUDOCS 8707150042
Download: ML20235H181 (3)


Text

_ _ _ .

t ,

'Af M 2NRC-7-161 Beaver Valley No. 2 Unit Project Organization S.E.G. Building Telecopy 3- Ext.160 P.O. Box 328 June 17, 1987 Shippingport, PA 15077  !

United States Nuclear Regulatory Commission j Region I l 631 Park Avenue l King of Prussia, PA 19406 j ATTENTION: Mr. William T. Russell Administrator q

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Improper Installation of Bisco LOCA-Seals in Conduits j l Containing Rockbestos High Temperature Cable Potential Significant Deficiency Report 87-16, Final Report l

Gentlemen:

1 This Potentially Reportable Significant Deficiency Report is being submitted pursuant to the requirements of 10CFR50.55(e). It is anticipated that no additional reports will be required.

DUQUESNE LIGHT COMPANY By W // n JJJ( Cprey V Sr. Vice Wesident DLC/ijr NRC/DLC/SDR/8716 Attachment AR/NAR cc: Mr. P. Tam, Project Manager (w/a)

Mr. J. M. Taylor, Director (3) (w/a)

Mr. J. Beall, Sr. Resident Inspector (w/a)

Mr. L. Prividy, NRC Resident Inspector (w/a)

INP0 Records Center (w/a)

NRC Document Control Desk (w/a) 8707150042 870617  ;

PDR ADOCK 05000412 j ]

S ppg L - -

g:o i{ - -

f ATTACHMENT

1. Summary During Engineering Review for cable acceptability for installation at BVPS-2 a deviation from field installation specification was discovered concerning Bisco LOCA Seal (conduit sealant). This devi- l ation involved Rockbestos High Temperature Cable and improper removal of cable jacket material prior to Bisco LOCA Seal installation. .

l l

2. Immediate Action Taken 1

A Nonconformance and Disposition Report was written and an investiga- l tion was initiated in order to establish the number and condition of previously installed Bisco LOCA Seal conduit seal s associated with Rockbestos High Temperature Cable.

Mr. L. M. Rabenau, Lead Compliance Engineer, Beaver Valley Power Station Unit No. 2 notified Mr. D. Limroth, NRC Region I, of this concern on May 18, 1987. Additionally, this item was described in a DLC to NRC letter (2NRC-7-132 dated May 18,1987).

l

3. Description of Deficiency 1

The initial investigation of the use of Bisco LOCA Seal identified 19 1 resistance temperature detectors (RTDs) inside containment and 27 Target Rock Solenoid Operated Valves (SOVs) (10 inside,17 outside l containment). The specific concern involves the non-remov al of a j braiding on each conductor in addition to the overall cable jacket as i a non-conformance to Field Installation Specification 931. Further  !

investigation revealed that the method of conduit sealing of the 19 RTDs did involve pouring of Bisco LOCA Seal over inline butt splices covered with Raychem sleeves, not continuous braided wire. This seal-ing method is known as the TE method and is acceptable in accordance with Field Installation Specification 931. The braiding issue was therefore applicable only to conduit seals on the Target Rock S0Vs which were terminated with Rockbestos High Temperature Cable.

l

4. Analysis of Safety Implication Improper installation of the conduit seals could cause malfunction of safety related SOVs during accident conditions. At BVPS-2, this is an unacceptable condition since, in accordance with 10CFR50.49, safety-related Class 1E equipment must be installed as qualified for all anticipated conditions under which they must operate and will. not fail in such a manner as to affect plant safety or mislead the operator. l l

Page 1 of 2 1

L. .

l .

0

5. Corrective Action to Resolve the Deficiency The seals for the 27 Target Rock SOVs were reworked as necessary under N&D 39348C and 39351A. All rework has been completed as indicated in DLC letter 2NRC-7-142 dated May 25, 1987. The conduit seals for these 27 Target Rock SOVs are now installed in strict accordance with Field Installation Specification 931.
6. Additional Repor_t No additional reports are expected.

i Page 2 of 2 1 k l

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ . _ J

1

\

l RECENED-REOC1 pg 3 49 4

1931 JW 2a  !

c

'l j

l l

4 ,

- - - - - - - - - _ - _ __