ML20235G823
ML20235G823 | |
Person / Time | |
---|---|
Site: | 05000601 |
Issue date: | 09/24/1987 |
From: | Kenyon T Office of Nuclear Reactor Regulation |
To: | Office of Nuclear Reactor Regulation |
References | |
NUDOCS 8709300243 | |
Download: ML20235G823 (3) | |
Text
g . _ . , _ _
^ ' '
. September 240 1987
?
y ,.a l'
LDocket No. 50-601 t .
n-
. ,p: , ,
' APPLICANT: -Westinghouse Electric Corporation FACILITY:i RESAR SP/90
~
SUBJECT:
SUMMARY
0F MEETING.T0 DISCUSS THE RESAR SP/90 APPLICATION
'On Se'ptember 10, 1987, representatives of the NRC and Westinghouse met to discuss, the general design features of RESAR SP/90. ; Attached is a list of-attendees. Westinghouse will be submitting both the proprietary and non-proprietary version of this presentation at a'later time..
~
In summary. Westinghouse. presented general design information regarding the RESAR SP/90 design. Topics included a description of the advanced reactor 1 design,- the integrated-safeguards systems, secondary side safeguards system, fluid systems, the. integrated protection systems, and the containment system.
'The applicant discussed how the design improved mitigation of LOCAs, and how it P
reduced the core melt frequency as compared to current plant design.
- original signed by Thomas J. Kenyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Attachment:
As stated
,DISTRIB JTION: ,
LDecket: m e m ,,
NRC PDR.
c PDSNP Reading j
LRubenstein L, TKenyon OGC-BETH EJordon
- JPartlow
'NRC Participants ACRS_(10)
HBClayton, RI 09/q/87
$$$"S0$$ SE 0*
A
pm M4g fg UNITED STATES f-
.y g NUCLEAR REGULATORY COMMISSION 5 ( j WASHINGTON, D C. 20555 September 24, 1987 k ~. . p#
Docket No. 50-601 APPLICANT: Westinghouse Electric Corporation FACILITY: RESAR SP/90
SUBJECT:
SUMMARY
OF MEETING TO DISCUSS THE RESAR SP/90 APPLICATION l On September 10, 1987, repre:entatives of the NRC and Westinghouse met to l discuss the general design features of RESAR SP/90. Attached is a list of attendees. Westinghouse will be submitting both the proprietary and non-proprietary version of this presentation et a later time.
In summary, Westinghouse presented gencral design information regarding the RESAR SP/90 design. Topics included a description of the advanced reactor design, the integrated safeguards systems, secondary side safeguards systea, fluid systems, the integrated protection systems, and the containment system.
The applicant discussed how the design improved mitigation of LOCAs, and how it reduced the core melt frequency as compared to current plant design.
17-Th mas J. enyon, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Spenial Projects Office of Nuclear Reactor Regulation
Attachment:
As stated
- e 1
ll i
1 ATTACHMENT l
m,-
Meeting Attendees l
'RESAR SP/90
' Septembe 10, 1987 Name , Organization
.T. J. Kenyon ..
..' NRR/DRSP/PDSNP L.'S. Rubenstein NRR/DRSP/PDSNP: !
Steve Long -
NRR/DREP/RAB l
. Duke Wheeler -NRR/ILRB l David Shum NRR/PSB Robert Fell- NRR/PSB-E. Chelliah RES/PRAB/NRC. ;
p 4 H. Raval NRR/SPLE/ DEST !
' R. Pichumani NRR/ DEST /ESGB David P. Notley NRR/ECEB/ DEST Nonnan Wagner - NRR/ DEST /SPLB Irwin Spickler NRR/DRPEP/RPB
- Timothy Meneely W Larry Conway 'W l-- Michael H. Shannon R l William M. Schivley W ;
Amira Gill NRR/ DEST /SPLB ;
' James Wing NRR/ DEST /ECEB ,
Harold Walker NRR/ DEST /SPLB !
( N. Trehan NRR/ DEST /SELB l l 0 1-l i
l l
l
.J1 1
)
t - - -. - _ . _ _ _ . . - - _ _ _ _ _ - - _