ML20235G052

From kanterella
Jump to navigation Jump to search
Amend 123 to License DPR-59,changing Tech Specs to Reflect Mgt Reorganization of Util Headquarters Staff Which Merged Engineering & Const Mgt Functions Into Existing Operations Depts
ML20235G052
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 02/13/1989
From: Capra R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20235G056 List:
References
NUDOCS 8902230101
Download: ML20235G052 (5)


Text

. - _ _ __ _ _ _ _ _ _ _ _ _ _ _ _ _. ____ _ _ _ _ _ _ _ _ _

im T) 8 0,js 3;

. UNITED STATES

.g.

NUCLEAR REGULATORY COMMISSION j.

WASHINGTON, D. C. 20555

..... so POWER AUTHORITY OF THE STATE OF NEW YORK DOCKET NO. 50-333 JAMES A. FITZPATRICCNUCLEAR POWER PLANT AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 123 1.icense No. DPP 859 1.

The Nuclear Regulatory Comission (the Comission) has found that:-

A.

The application for amendment by Power Authority.of the State of New York (the licensee) dated February 5, 1988 complies with the standards and requirements of the Atomic Energy Act of'195a, as amended (the Act) and the Commission's rules and

-regulations set forth-in.10 CFR Chapter I;-

B.

The' facility will operate in confonnity.with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance fi) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with~10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

P.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendnent, and paragraph 2.C.(2) of Facility Operating License No. DPR-59 is hereby amended to read as follows:

L 8902230101 e90213 DR ADOCK 05000333 PDC l

9 (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.123, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of the date of its issuance.

FOR THE-NUCLEAR REGULATORY COMMISSION k Robert A. Capra, Director Project Directorate I-1 Division of Reactor Projects, I/II

Attachment:

Changes to the Technical Specifications Date of Issuance

  • February 13, 1989 i

}

1 e

ATTACHMENT TO LICENSE AMENDMENT NO 123 FACILITY OPERATING LICENSE NO. DPR-59 j

i DOCKET NO. 50-333 1

Revise Appendix A as follows:

Remove Pages Insert Pages 4

251 251 259 259 i

I

Q f.

R:diological s2fcty g.

Mechanical engineering h.

Electrical engineering i.

t. administrative controls and quality assurance practices I
j. Environment k.

Civil / Structural Engineering 1.

Nuclear Licensing m.

Emergency Planning I.

n.

Other appropriate fields associated with the unique characteristics of a nuclear power plant MEMBERSHIP 6.5.2.2 The SRC shall be composed of the following voting members:

Chairman:

Manager-Nuclear Safety Evaluation

)

Vice-Chairman: Director-Quality Assurance Member:

Vice President Nuclear Engineering Member:

Vice President Nuclear Opera

  • cions Member:

Vice President-Nuclear Support l

Member:

Resident Manager-IP3 Member:

Resident Manager-JAF Member:

Consultant ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the SRC chairman.

An Alternate Vice-Chairman shall be appointed in writing by the Executive Vice President - Nuclear Generation if necessary.

However, no more than two alternates shall T.neticipate as voting members in SRC activities at any one time.

CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the SRC Chairman to provide expert advice to the SRC.

i I

MEETING FREOUENCY l

6.5.2.5 The SRC shall meet at least once per calendar quarter during the

{

initial year of facility operation following initial fuel loading and at least once per six months, thereafter.

251 Amendment No. pd g [.[M.1% 1pf,123

~

l

e, FIGURE 6'.1-1 MANAGEMENT ORGANIZATION CHART POWER AUTHORITY OF THE STATE OF NEW YORK-JAMES A. FITZPATRICK NUCLEAR POWER PLANT PRESIDENT &

CHIEF OPERATING OFFICER I

SENIOR VICE PRESIDENT -

APPRAISAL'& COMPLIANCE SERVICES DIRECTOR OF

+ EXECUTIVE.

SECURITY, SAFETY VICE PRESIDENT -

AND FIRE NUCL?.AR GENERATION.'

PROTECTION SAFETY REVIEW

  • DIRECTOR OF COMMITTEE SAFETY AND

=

FIRE RESIDENT PROTECTION

. MANAGER 4j

+ The Executive Vice President - Nuclear Generation is responsible for administering the Fire Protection Program.

  • The Director of Safety and Fire Protection Division, which is part of the Department of Appraisal and Compliance Services is the offsite management position responsible for assessing the effectiveness of the Fire Protection programs by conducting reviews and audits,

AmendmentNo.[,[5,123

-.