Text
hk July 8, 1987 For:
The Commissioners From:
.T. A. Rehm, Assistant for Operations', Office of the ED0
Subject:
WEEKLY INFORMATION REPORT - WEEK ENDING ' JULY 3,1987 A summary of key events is included as a ' convenience to those Connissioners who may prefer a condensed ~ version of this report.
Contents _
Enclosure Administration and Resources Management A
Nuclear Reactor Regulation-B Nuclear Material Safety and Safeguards C
Nuclear Regulatory Research D*
Governmental & Public Affairs E
General Counsel F*
l Personnel G
Analysis and Evaluation-of Operational Data H
Small'& Disadvantaged Business Utilization & Civil Rights I*
Special Projects J
Enforcement K
Consolidation L
Regional Offices M*
CRGR Monthly Reports-N Executive Director for Operations 0*
Items Addressed by the Commission P
Meeting Notices Q
Proprietary or Other Sensitive Information (Not for R
external distribution)
- No input this week.
hDk
$0kkI 0R C
'T.'A.'Rehm,4IsistantforOperations
~'
WEEKLYINFOREPT PDR Office of the Executive Director for Operations
Contact:
T. A. Rehm, EDO 492-7781 t
\\.-
HIGHLIGHTS OF WEEKLY INFORMATION rep 0RT WEEK ENDING JULY 3, 1987 j
}
Fermi-2 A meeting was held with the licensee on June 29, 1987, at the Region III offices to discuss the licensee's request to op(erate the Fermi-2 plant atplant operatio power levels up to 75% of rated thermal power l
limited to 50% power).
It was decided that continued plant operation up to 50% power, without significant events for an additional period of time, was needed before the NRC would consider granting the licensee's request to l
operate above 50% power. This decision was based on continuing problems with plant equipment, the frequency of ESF actuations which have unnecessarily challenged safety) systems (the most recent occurring on June 25th), and the recent (June 26th to a level which resulted in an operating mode change without performing required equipment availability checks and surveillance.
Apparently, the operating shift was not aware that an operating mode change had occurred.
The licensee will be formally informed of this decision by Region III.
Michigan Selected as Host State for LLW Facility The Midwest Compact Commission voted on June 30, 1987, to name Michigan as the Host State for that Compact's first low-level waste facility. Ohio and Minnesota were the second and third choices. Michigan expressed concern about several issues including shared liability and what it considers to be needed j
revisions to the LLRWPAA. Michigan will remain in the Compact while these concerns are being addressed, but is retaining the option to leave the Compact i
if it considers the resolution to be unsatisfactory.
The Compact has agreed to sponsor a national meeting in the next three to six months to address the issues.
Licensability of Canadian "SLOWp0KE" Research Reactor On Monday, June 29, Arkansas Tech University and Atomic Energy of Canada Limited representatives met with NRR, OGC, and GPA/IP to present their plans and obtain guidance on considerations related to licensing the Canadian " SLOWPOKE" research reactor in the U.S.
Several potential licensing issues were discussed, and it was decided that Arkansas Tech University will submit a letter to NRC to obtain preliminary views on these issues before proceeding with a license application. The "SLOWP0KE" is a 20 KWe research reactor that operates with one 8-inch I
control rod and uses a single load of 19.9 percent enriched U-235 with a 20-year fuel life. The "SLOWP0KE" is designed to operate fully automatically with the only control being its on/off switch.
1 l
l
I OFFICE OF ADMINISTRATION AND RESOURCES MANAGEMENT ADMINISTRATION OF THE FREEDOM 0F INFORMATION ACT STATUS OF REQUESTS - 1987 For 4-Day Period of June 26, 1987 - July 1, 1987 Initial Appeal of Request Initial Decision Received This Week 14 2
Completed This Week 23 11 Carryovers From 1986 170 53 Received In 1987 409 45 Granted In 1987 275 14 Denied In 1987 136 41 Pending 168 43 ACTIONS THIS WEEK Received (An individual Requests records maintained in the NRC on himself.
requesting information about himself)
(87 396)
Lindu Pr9 man, Requests copies of records relating to a 235 gallon Govurrent discharge of radioactive cooling water from the Point Accountability Beach Unit i nuclear power plant on June 19, 1987.
l Projece (87.")7) i Linda Baurtn, Requests copies of records relating to a named Government individual's concerns at the Fermi Unit 2 nuclear power Accountability plant from 1985 to the present.
Project (87-398)
Kirk Nevin Requests copies of proceedings involving an alleged incident (87-399) in which an employee was sleeping on the job at the Peach Bottom nuc? ear power plant.
i John Potter, Requests records relating to the Material Safety Regulations Nuclear Licensing Review Study Group and records relating to the lessons Reports learned from the Sequoyah Fuels accident.
(87-400)
CONTACT:
Donnie H. Grimsley 492-7211 JULY 3, 1987 ENCLOSURE A
}
2 Received, Cont'd Michael Knapik, Requests copies of all reports prepared by NRC using McGraw Hill 1986 data from 741 and 742 forms and records generated (87-401) in response to F01A-87-230.
John Potter, Requests three categories of records relating to Nuclear Licensing performance indicators for material licensees.
Reports (87-402)
John Potter, Requests records regarding NRC's consideration of a huclear Licensing rulemaking that would strengthen NRC's oversight of Reports medical licensees.
(87-403)
Teofil Grochowski, Requests a copy of the proposal submitted in response to Engineering RFP RS-NRR-86-051.
Services, Inc.
(87-404)
Julie Berger, Requests specified infomation on contracts: NRC-33-85-318, Planning Research NRC-05-86-162, NRC-14-85-392, and NRC-33-85-327.
Corporation (87-405)
Stewart Wetzel, Requests a copy of the draft general letter on individual NUS Corporation plant examinations which was presented / discussed at the (87-406)
ACRS Subcommittee meeting on May 28, 1987 and the 326th general meeting on June 5, 1987.
Joshua Gordon, Requests three categories of records relating to fines Critical Mass levied against utilities since January 1, 1986.
(f7-407)
John Balitewicz, Requests information on companies that have made The Falk proposals for approval of dry casks for spent nuclear Corporation fuel.
(87-408)
Federal Bureau Referral of one record for NRC's review relating to the of Investigation Nuclear Materials and Equipment Corporation (NUMEC) in (87-409)
Apollo, Pennsylvania.
Linoa Bauman, APPEAL TO THE E00 for the release of four records denied Government in their entirety in response to a request for records Accountability regarding an inspection conducted by R. P. McIntnyre on Project August 25-29, 1966 of the office of Stone & Webster (87-A-44-87-94)
Engineering Corporation, New York, to review the implementation of Stone & Webster's quality assurance program on activities relating to the design requalification of piping and pipe supports of Comanche Peak Units 1 and 2.
JULY 3. 1987 ENCLOSURE A
l 3
Received, Cont'a Susan Lynd, APPEAL TO THE COMMISSION for the release of one specified l
TERA record denied in its entirety relating to a request for (87-A-45-87-289) records concerning the enforceability of licensee commitments.
Granted i
Steven Sholly, In response to requests for records prepared by or for NHB Technical IDCOR concerning severe accident analysis, risk assessment, Analysis source term analysis, and estimation, made available (87-60&87-113) 69 records.
Informed the requester that additional records subject to this request are already available at the PDR.
i 1
Ophelia Williams, In response to a request for copies of correspondence
)
J/R/A Associates between NRC headquarters and Region III regarding (87-121) interpretation of technical specifications, made available 49 records.
Informed the requester that two additional j
records subject to this request are already available at i
the PDR.
Steven Harrison, In response to a request for three copies of the 50 mile North Anna EPZ map for the horth Anna Power Station, made available Power Station copies of the requested map.
(87-351)
Stewart Wetzel, In response to a request for a copy of a January 18, 1974 NUS Corporation ACRS Subcommittee meeting transcript on Grand Gulf, (87-369) informed the requester that this record is already available at the PDR.
(Ar individual In response to a request for records maintained in the NRC requesting on himself, informed the requester that the NRC has no information about records pertaining to him in its document control, or the himself) security systems of records.
(87-396)
Denied Stevi Stephens, In response to a request for two categories of records i
Nuclear Awareness regarding the Wolf Creek nuclear power plant, made l
Network available eight records.
Informed the requester that (86-331) adoitional records subject to this request are alreaoy available at the PDR.
Denied three records in their entirety, cisclosure of which would tend to inhibit the open and frank exchange of ideas essential to the deliberative process.
Denied one record in its entirety, 4
aisclosure of wnich woulo interfere with an enforcement proceeding. Denied portions of six records, disclosure of which would result in a clearly unwarranted invasion of personul privacy.
1 JULY 3, 1987 ENCLOSURE A a
L
(
Received. Cont'd Cindee Virostek, In response to a request for eight categories of records l
Kiski Valley regarding B&W facilities in Apollo and Parks Township, Coalition Pennsylvania, denied portions of four records containing (86-364) commercial or financial (proprietary) information. Denied j
portions of one record containing Classified Restricted j
Data.
l Barbara Zuras, In response to a request, on behalf of her client, for Hoberg, Finger, a copy of the 01 investigation report on allegations Brown, Cox &
of QA violations at the Zimmer nuclear power plant, Molligan made available 20 records. Denied portions of two (86-671) records, disclosure of which would result in a clearly unwarranted invasion of personal privacy and would reveal identities of confidential sources.
Larry Tye, In response to a request for records (1) related to the The Boston Globe utility's proposed reduction of the emergency planning (87-10) zone at Seabrook; (2) on changes to containment that NRC is considering for GE plants generally; and (3) regarding the inspection of Pilgrim since its shutdown in April, made available 70 records.
Informed the requester that additional records subject to this request are already available at the PDR. Denied 10 records in their entirety, disclosure of which would tend to inhibit the open and frank exchange of ideas essential to the deliberative process.
Linda Bauman, In response to a request for records related to inspection Government report 50-424/86-91 dated November 13, 1986, regarding drug Accountability abuse at the Vogtle nuclear power plant, made available Project 69 records.
Informed the requester that additional (87-90) records subject to this request are already available at the PDR.
Denied one record in its entirety and portions of eight records, disclosure of which would result in a clearly unwarranted invasion of personal privacy.
Leonard Trosten, In response to a request for four categories of records LeBoeuf, Lamb, regarding (1) amendment to Part 110; (2) license No.
Leiby & MacRae ISNM-83-025; (3) license No. ISNM-87-005; and (4)
(87-138)
Comprehensive Anti-Apartheid Act of 1986, made available 12 records.
Informed the requester that additional records subject to this request are already available at the FDR.
Denied six records in their entirety, disclosure of which would tend to inhibit the open and frank exchange of ideas essential to the deliberative process. Denied one record in its entirety containing confidential business (proprietary)information.
JULY 3, 1987 ENCLOSURE A
5 l
l j
denied, Cont'd James Flasch, In response to a request for records regarding an The Post-Crescent incident involving a breach of security in July 1986 1
(87-166) at the Point Beach nuclear power plant, made available five records.
Informed the requester that one additional record subject to this request is already j
available at the PDR. Denied 11 records in their entirety containing unclassified safeguards information, proprietary information, and predecisional information.
I Denied portions of two records containing unclassified safeguards information and proprietary information.
i Lynn Connor.
In response to a request for a copy of a December 16, Doc-Search 1985 memorandum referenced on prge 6 of a June 1986 Associates inspection report on the Rancho Seco nuclear power (87-236) plant, denied this recora in its entirety, disclosure of which would interfere with an enforcement proceeding.
Eli Port, In response to a request for all quarterly reports of j
Radiation Safety transfers of devices distributed under general licenses j
Services, Inc.
from 1980 through the first quarter of 1986, informed the
{
(87-267) requester that certain quarterly reports for which no proprietary claim has been made are already uailable at the PDR.
Denied the remaining quarterly reports containing confidential business (proprietary) information.
Francine Lee, In response to a rewest for records regarding the suspension Information of the 1986 license for Radiation Technology, Inc.,
Access Rockaway, New Jersey, informed the requester that records (87-268) relating to this request are already in the PDR in F0IA files85-774, 86-237 and 86-485.
Denied all 01 i
records relating to Radiation Technology, disclosure of I
which would interfere with an enforcement proceeding.
(NRCemployee)
In response to a request for records related to a l
(87-298) specified OIA investigation, made available one record, j
Denied two records in their entirety, disclosure of which would interfere with an enforcement proceeding. Denied portions of one record, disclosure of which would l
constitute an unwarranted invasion of personal privacy.
(NRC employee)
In response to a request for records related to Vacancy (87-307)
Announcement h0. 87-13457-7 and the process and procedures used to arrive at a selection, mace available seven records. Denied portions of four records, disclosure of which woulo result in a clearly unwarranted invasion
(
of personal privacy.
l JULY 3, 1987 ENCLOSURE A
y 6
3nied, Cont'd~
Kay Gorman-In response to a request for copies of a March 19,1987.
(87-309) memorandum that cetails the status of the RESAR-SP/90 review and SERs which are referenced in the memorandum, made available one record.
Informed the requester that-one record subject to this request is already available-at the PDR. Denied 19 records. in their entirety, disclosure of which would tend to inhibit the oper, and frank exchange of.ioeas essential to the deliberative-process.
Linda Bauman, In response to a request for records related to Government communications between NRC and the Florida Power and Accountability Light (FP&L) Company on June 9, 10, and 11, 1987 regarding Project an investigation of alleged kickbacks at FP&L, denied (87-340) all OIA records in their entirety, disclosure of which would interfere with an enforcement proceeding.
Linde Bauman, In response to a request for records related to an OIA Government investigation at the Florida Power and Light Company, Accountability denied all OIA records in their entirety, disclosure of Project which would interfere with an enforcement proceeding.
(87-341)
Billie Gcrde, In response to an APPEAL TO THE COMMISSION for the Government release of the denied portions of an investigation Accountability report related to stainless steel liner plates of the Project spent fuel pool, transfer canal, refueling cavity, or (86-A-221-86-180) any other facility at,the Comanche Peak nuclear power plant, denied portions of the report, disclosure of which would constitute an unwarranted invasion of personal privacy and would reveal identities of confidential sources.
Linda Bauman, In response to an. APPEAL TO THE COMMISSION for the release f
Government of.eight records denied in their eritirety related to a l
Accountability request for records concerning the Brookhaven National l
Project Laboratory investigation of the allegations of a named (87-A-23-85-213) individual, denied seven records in their entirety and portions of one record, disclosure of which would-i' constitute a clearly unwarranted invasion of personal privacy.
l Harry Voigt, in respcase to an APPEAL TO THE COMMISSION for the release LeBoeuf. Lamb, of one denied record relating to the falsification of Leiby & MacRae leak rate test data at TMI-2, continued to ceny this (87-A-28-86-682) record in its entirety, disclosure of which would tend to inhibit the open and frank < exchange of ideas essential to the deliberative process.
JULY 3, 1987 ENCLOSURE A l
WEEKLY IhTORMATION REPORT DIVISION OF CONTRTETS WE E ENDING JULY 3, 1987 IIB ISSUED IFB No. : RS-ARM-88-168
Title:
" Newspaper Clipping Services"
==
Description:==
Gathering and clipping of news articles on a local and nationwide basis.
Period of Perfomance: Two years Sponsor Office of Administration & Resources Management Status: IFB issued on June 29, 1987. Bids due on July 29, 1987.
RFP ISSUED RFP No. : RS-RES-87-085
Title:
" Comprehensive Aging Assessment of Circuit Breakers and Relays"
==
Description:==
Contractor shall conduct a study to identify aging and defect characterization and develop recommendations for inspection, surveillance and maintenance methods for safety-related circuit breakers and relays used in nuclear power plants.
Period of Performance: Three years Sponsor: Office of Nuclear Regulatory Research Status: Closing date has been extended to July 16, 1987.
PROIOSALS UNDER EVALUATION RFP No. : RS-AED-87-129
Title:
" Emergency Response Data Systm Implementation"
==
Description:==
Finalize a design; procure, install, and test the hardware; and develop, install and test the software to produce a functional Emergency Response Data System installed at NRC Bethesda, Maryland facilities.
Period of Performance: Five years Sponsor: Office for Analysis and Evaluation of Operational Data Status: RFP closed on June 29, 1987. Proposals fowarded to Source Evaluation Panel for review on July 1, 1987.
RFP No. : RS-OIE-87-127
Title:
" Specialized Technical Training"
==
Description:==
Provide technical assistance to the IRC in the implementation of identified needs and/or further development of programs to meet future needs for specialized technical training of NRC inspectors in the area of Radiation Protection.
Period of Perfonnance:
36 months Sponsor: Office of Nuclear Reactor Regulation Status: Best and Final offers received on June 30, 1987 and forwarded to Source Evaluation Panel for review on July 1, 1987.
JULY 3, 1987 ENCLOSURE A 1
..;.;;3.y;.
3 i
~
-Weekly Information Report Division of Contracts 00fm UCT AWARD IFB No. : RS-ORM-87-233
Title:
"Micrographic Services for Source Drawing Documents"
==
Description:==
Production of microfiche from source documents. Production
. capability of an estimated 750 microfiche per week of masters of source documents is required.
, Period of Performance: Two years Sponsor Office of Administration and Resources Management Status: A fixed price requirements type Centract No. NRC-33-87-233 was awarded to Microform, Inc.,-in the amount of $86,205.00 effective July 1, 1987.
l JULY 3, 1987 ENCLOSURE A i
L i
OFFICE OF NUCLEAR REACTOR REGULATION ITEMS OF INTEREST Week Ending July 3, 1987 Trojan Nuclear Plant During the course of conducting an expanded piping wall thickness inspection program during the 1987 outage Trojan observed pipe wall thinning in certain safety related and non-safety related portions of
. the main feedwater system.
The affected safety related portion consists of piping between the steam generator and the check valve outside containment, on all feedwater lines. Eight elbows and two straight runs of pipe were found to have thinned to below minimum wall thickness requirements, and have been replaced. The remaining elbows have been determined to be acceptable, but will be replaced during subsequent outages. The i
mechanism for the thinning is being evaluated by the licensee.
Trojan has had-in-place, a corrosion / erosion inspection program which identified portions of fluid systems which may be susceptible to the phenomemon. The program was based on the original EPRI and industry guidelines. The conditions to which the safety related portions of the system were found to have thinned, had not been anticipated by those original guidelines.
)
The licensee is currently developing corrective actions, and a long-term action plan.
Fermi-2 A meeting was held with the licensee on June 29, 1987, at the Region III J
offices to discuss the licensee's request to operate the Fermi-2 plant at power levels up to 75% of rated thermal power (plant operation is currently limited to 50% power).
It was decided that continued plant operation up to 50% power, without significant events for an additional period of time, was needed before the NRC would consider granting the licensee's request to operate above 50% power. This decision was based on continuing problems with plant equipment, the frequency of ESF actuations which have unnecessarily challenfJune26th)ystems(themostrecentoccurringonJune25th),andthe ed safety s recent operator error which allowed reactor temperature to rise to a level which resulted in an operating mode change without performing required equipment availability checks and surveillance. Apparently, the operating shift was not aware that an operating mode change had occurred.
The licensee will be formally informed of this decision by Region III.
JULY 3, 1987 ENCLOSURE B
Palo Verde Unit 3 The Palo Verde licensee informed the staff that Unit 3 8 Emergency Diesel Generator, currently under test after being rebuilt, experienced a crankcase explosion about midnight on June 30, 1987. The diesel had been running for approximately 50 minutes at 100 per cent power when the incident occurred.
The diesel was undergoing a series of test runs following repairs after the December 23, 1986, failure of the #9 connecting rod.
The diesel was on the I
12th of 35 one hour runs at full load in the test program. The diesel tripped on high crankcase pressure and several pressure relief valves on the diesel lifted to relieve oil vapor pressure. There was no report of fire during the event.
The cause of the malfunction is not known and is under investigation by the licensee.
The diesel has a rating of 5500 KW and was supplied by Cooper Energy Services, Inc.
i JULY 3, 1987 ENCLOSURE C
NRC TMI-2 CLEANUP PROJECT DIRECTORATE WEEKLY STATUS REPORT FOR JUNE 29 - JULY 5, 1987 1.-
DEFUELING Pick and place defueling of partial length fuel assemblies and fuel pins continued.
Partial fuel assemblies E-9, E-11 and D-11 were loaded into defueling canisters. A total'of 35 fuel assemblies out of 177 in the core have now been broken free from the lower grid and loaded into canisters.
Four canisters were filled and one partially filled. The four filled canisters were transferred to the spent fuel pool.
A total of approximately 113,000 lbs. out of an estimated 300,000 lbs. of core and other material have now been loaded into canisters.
2.
ENVIRONMENTAL MONITORING US Environmental Protection Agency (EPA) sample analysis results -
show that TMI site liquid effluents are in accordance with regulatory limits NRC requirements, and the City of Lancaster Agreement.
TMI water effluents from the station (Units 1 and 2) discharge are analyzed by EPA.
Gamma spectrum analyses of the seven daily composited samples for June 13 - 20, 1987 indicated Cs-137 slightly above the lower limit of detection. As noted above this is within the allowed discharge limits.
EPA's gamma spectrum analysis of the NRC's TMI outdoor air sample for June 25 - July 2,1987 showed no reactor related radioactivity.
The water works for the City of Lancaster composited seven daily samples from June 14 - 20, 1987.
EPA's gamma spectrum analysis of the composite sample showed no reactor related radioactivity.
3.
NRC EVALUATIONS IN PROGRESS Technical Specification Change Requests 52, 53 and 56.
Recovery Operations Plan Change Requests 38 and 41.
Solid Waste Facility Technical Evaluation Report.
Heavy Load Safety Evaluation Report, Revision 3.
Processed Water Disposition Proposal.
Safety Evaluation Report for Use of Plasma Arc Cutting Torch.
Pressurizer Defueling Safety Evaluation Report.
Safety Evaluation Report for Defueling of the Core Support Assembly.
Environmental Evaluation of the Post-Defueling Monitored Storage Proposal.
Canister Handling and Preparation for Shipment Safety Evaluation Report, Revision 4.
l JULY 3, 1937 ENCLOSURE B o
Defueling Water Cleanup System Technical Evaluation Report Annual Updute.
Defueling Canister Technical Evaluation Report Annual Update.
EPICOR II System Description Annual Update.
Heavy Load Handling - Movement of Missile Shields.
4.
PUBLIC MEETING The Advisory Panel for the Decontamination of Three Mile Islend Unit 2 has tentatively set August 12, 1987 as their next public meeting in Harrisburg, PA. Meeting specifics will be provided at a later date.
JULY 3, 1987 ENCLOSURE B
______-__________s
I' OFFICE OF NUCLEAR MATERIAL SAFETY AND SAFEGUARDS Items of Interest Week Ending July 3, 1987 Nuclear Fuel _ Services, Inc. (NFS1 On June 25, 1987, NMSS gave consent to NFS Services Ltd., of Atlanta, Georgia, for the purchase of the stock of Nuclear Fuel Services Inc. (NFS). NFS began processing radioactive material in 1957, at Erwin, Tennessee. Currently, NFS is the sole supplier of nuclear fuel for Naval Reactor Programs.
West Valley Demonstration Project The unused fuel racks were removed from the Fuel Receiving Station as part of the conversion of the existing fuel storage pool to the Remote Size Reduction l
area. The operation involved 30 underwater entries by contract divers. This area, in conjunction with the Contact Size Reduction Facility, will be used to reduce the size of contaminated process equipment.
NRC/ DOE Meeting on NWPA Transport Packaging l
l On June 26, 1987, representatives from NRC and DOE met to discuss issues I
associated with DOE's transportation programs. The NRC/ DOE Procedural Agree-ment on Spent Fuel and High-Level Waste Transportation Packaging provides I
for periodic meetings to review information and resolve issues related to
)
packaging design, testing and certification. The principal topics discussed at the meeting were the schedule for submittal of DOE package designs for l
NRC review and certification, and a proposal to allow credit for fuel burn-up in package designs.
It was tentatively agreed to schedule the next NRC/ DOE transport packaging meeting for mid-July.
l MichiganSelectedasHostJcateforLLWFacility l
The Midwest Compact Commission voted on June 30, 1987, to name Michigan as the Hott State for that Compact's first low-level waste facility. Ohio and Minnesota were the second and third choices. Michigan expressed concern about several issues including shared liability and what it considers to be needed revisions to the LLRWPAA. Michigan will remain in the Compact while these concerns are being addressed, but is rettining the option to leave the Compact if it considers the resolution to be unsatisfactory. The Compact has agreed to sponsor a national meeting in the next three to six months to address the issues.
I i
JULY 3, 1987 ENCLOSURE C
2 Stabilization of the Rifle Tailings Based on their review, LLWM staff suggested by telephone, on June 29, 1987, that DOE assess alternative sites for stabilization of uranium mill tailings and other contaminated materials at Rifle, Colorado. DOE is cleaning up two abandoned uranium mills at Rifle under the Uranium Mill Tailings Remedial' Action Project. DOE's preferred option for stabilization is to dispose of the tailings at a remote site named Estes Gulch. LLWM staff identified significant concerns regarding DOE's ability to protect against surface water erosion of the tailings during the long time periods required by the EPA standards (40CFRPart192).
In addition, LLWM staff identified deficiencies in DOE's characterization of the geology, hydrogeology, geochemistry, and engineering properties of the Rifle and Estes Gulch sites. These concerns will be transmitted to DOE in the form of staff comments on a draft Remedial Action Plan and Environmental Impact Statement.
Update of NRC Staff Position Regarding Engineered Alternatives LLWM staff presented a paper entitled " Update on NRC Staff Position Regarding Engineered Alternatives" at the Critical Path Disposal Technology Selection Seminar in Boston, MA, on July 1, 1987. The paper addresses three principal areas of LLWM's current work: -(1)activitiesinvolvedwithmeetingmilestones in the Low-Level Radioactive Waste Disposal Amendments Act of 1985; (2) a conceptual design for a Mixed LLW disposal facility (Mixed LLW is waste that is considered both low-level radioactive waste and hazardous waste as defined by EPA regulations); and (3) an overview of NRC comments on the Department of Energy / Rogers and Associates Engineering report on conceptual designs for engineered alternative disposal methods. The paper includes exampies of draft technical review criteria for engineered alternative disposal methods that LLWM will be incorporating into the Standard Review Plan for license applications for LLW disposal facilities once the criteria are finalized.
j
\\
JULY 3, 1987 ENCLOSURE C
1 ITEMS OF INTEREST OFFICE OF GOVERNMENTAL AND PUBLIC AFFAIRS WEEK ENDING JULY 2, 1987
' INTERNATIONAL PROGRAMS:
Licensability of Canadian "SLOWP0KE" Research Reactor On Monday, June 29, Arkansas Tech Universit; and Atomic Energy of Canada Limited representatives met with NRR, 0GC, and GPA/IP to present their plans and obtain guidance on considerations related to licensing the Canadian "SLOWP0KE" research reactor in the U.S.
Several potential licensing issues were discussed, and it was decided that Arkansas Tech University will submit a letter to NRC to obtain preliminary views on these issues before proceeding with a license application. The "SLOWP0KE" is a 20 KWe research reactor thAt operates with one 8-inch control rod and uses a single load of 19.9 percent enriched U-235 with a 20-year fuel life. The "SLOWP0KE" is designed to operate fully automatically with the only control being its on/off switch.
International Observers at Zion FFE A total of 65 foreign regulatory, utility, and contractor representatives from 18 countries and international organizations observed last week's Federal Field Exercise at the Zion Nuclear Plant.
The international observers toured the emergency support facilities associated with the exercise and received briefings on various aspects of the exercise itself.. More than half of the foreign guests also toured the NRC Operations Center in Bethesda as a part of their overall visit to the U.S.
International Meeting Notices The following international meeting notices supplement those announced previously:
IAEA Advisory Group Meeting on Radiation Technology in the Academic Curriculum and Agency Training Programmes, July 27-30, 1987, College Park, Maryland, USA IAEA Advisory Group to Establish Data Base for Radionuclides Transport Models and Technical Report on the Modelling of Atmospheric Transport of Radionuclides, August 24-28, 1987, Vienna, Austria IAEA Advisory Group Meeting on IAEA Program of Activities on Quality Assurance September 7-11, 1987, Vienna, Austria IAEA Specialists Meeting on the Influence of Target and Sample Properties on Nuclear Data Measurements, September 21-24, 1987, Geel, Belgium JULY 3, 1987 ENCLOSURE E
1
- 2.-
International Meeting Notices continued IAEA Advisory Group ~ Meeting on Performance Analysis on Nuclear Power j
Plant Operating Experience, October 5-7,'1987, Vienna, Austria IAEA Consultants Meeting on Coordinated Research Program on Behaviour of Spent Fuel and-Storage Facility Components During Long-Term Storage
-i (Befast-11), October 20-23, 1987, Erlangen, FRG IAEA Seventh Meeting of the International. Working Group on Gas-Cooled Reactors, October 29-30, 1987, Dortmund, FRG IAEA Technical Committee Meeting on Underwater Inspection, Repair'and Reconstitution of Water Reactor Fuel, November 3-6, 1987, Paris, France 1
IAEA Specialists Meeting on Operational Experience with Control and
. Instrumentation Systems in Nuclear Power Plants, November 4-6, 1987, Brussels, Belgium IAEA Advisory Group Meeting on Methods and Techniques for the NDA of Power Reactor Spent Fuel, November 16-20, 1987, Vienna, Austria IAEA/ CEC International Symposium on Management of Low-and Intermediate-Level Radioactive Wastes, May 16-20, 1988, Stockholm, Sweden Foreign Visitors On Monday Mr. T. Inoue, President of the Japan Power Engineering and Inspection Corporation (JAPEIC); Mr. Matsui, JAPEIC; Mr. Hatano, Washington Office of the Japan Electric Power Information Center, Inc.;
and Mr. Togo, a Japanese assignee at NRC, met with Chairman Zech, GPA Director H. Denton, and GPA/IP Director J. Shea to discuss items of mutual interest.
D. Ross, R. Bosnak, and J. Cortez of RES and H. Faulkner of GPA/IP met with the visitors earlier in the day to discuss possibilities for future cooperation in the areas of ageing and nondestructive examination (NDE).
On Wednesday Mike Hayns of the Safety end Reliability Directorate of the United Kingdom Atomic Energy Authority met with GPA Director H. Denton and representatives of the EDO, NRR, AE0D, RES and GPA/IP. Mr. Hayns indicated that on June 4 the UK Nuclear Installations Inspectorate approved the start of construction for the Sizewell B reactor and that construction activity is under way.
i JULY 3, 1987 ENCLOSURE E
9 I
State, Local and Indian Tribe Programs Weekly Highlights - July 2,1987 J
Works - in-Progress Paper Presented at Health Physics Society Annual Meeting A paper on contamination of steel scrap by naturally occurring radioactive material will be presented at the 32nd Annual Meeting of the Health Physics Society in Salt Lake City, July 5-9, 1987.. The paper is co-authored by James G. Yusko, Pennsylvania Bureau of. Radiation Protcction and Joel.Lubenau, SLITP and will be presented by Mr. Yusko at the Works-in-Progress session.
SLITP - Second Annual NRC Meeting with States and Tribes in High Level Waste
. Program On June 30, 1987, GPA/SLITP staff supported NMSS' Second Annual Meeting with State and Tribal representatives in the high-level waste program. Harold Denton discussed the NRC reorganization and-the role of the Office of Governmental and Public Affairs. Also in attendance were second round States and Tribes, representatives of the National Congress of American Indians (NCAI) and Council for Energy Resource Tribes (CERT).
Dean Kunihiro, Region V State Liaison Officer also participated.
Region IV - Central Interstat,e Compact Commission Meeting-On June 29, 1987,- Gary Sanborn, Region IV State Liaison Officer, attended a Central Interstate Compact Commission meeting in which it was announced that U.S. Ecology was selected as the developer of a regional low-level waste disposal facility.
U.S. Ecology has chosen Bechtel as the primary contractor for the site selection, development and licensing stages of the project.
Interagency Response Video During the FFE, camera crews from FEMA, DOE, the State of Illinois and Commonwealth Edison videotaped at their pre-assigned locations. The originals of these tapes will be delivered to Argonne National Laboratories by July 13, for preparation of the Interagency Video within the next two months.
l JULY 3, 1987 ENCLOSURE E
Office of Personnel Items of Interest Week Ending July 3 In the area of technical end user computer training, the ITS Training-Laboratory has developed and presented the following customized courses:
l Introduction to the Safety Issues Management System (SIMS).
Eighty nine participants completed SIMS training, which was. offered in a series of eight classes from January to June.
RAMIS II Basic Reporting.
Fifty four NRC staff members completed RAMIS II Reporter training, presented in four separate sessions from April to June.
A new series of courses to train end users on the Safety Issues Network (SINET) system is in-the requirements definition stage. Target date for piloting these courses is October 1.
J LY-3, 1987 Et1 CLOSURE G
Office for Analysis and Evaluation of Operational Data f
Items of Interest Week Ending July 2, 1987
)
Director's Office j
On June 30, 1987, the Director and the two Division Director's met with INP0 representatives in Atlanta to discuss AEOD/INP0 interfaces.
Greater efforts at l
coordination of analysis efforts include, INP0 providing individual reports of l
analysis rather than batching, and encouragement of telephone interaction on i
new studies.
AE0D will continue to distribute the monthly report of work in l
progress and planned. To quantify redundancy, AE0D will tabulate similar l
efforts occurring during CY 1987.
A similar coordination meeting is planned in Washington in December.
Incident Response Branch On June 29-30, 1987, the Incident Response Branch staff met with representatives from the Office of Administration and Resource Management and Region III at Harpers Ferry to conduct a " Lessons Learned" workshop for the recently completed Federal Field Exercise-2 (FFE-2).
ThemajorfindingsrelatedtotheFFE-2were identified and work on drafting the NRC Lessons Learned Report was initiated.
Initial observations and feedback from the participants in the exercise indicate that the FFE-2 was a major improvement over the FFE-1, particularly with respect to coordination among agencies, upgraded response capabilities, and procedures.
Technical Training Center Installation of the Westinghouse Standardized Nuclear Unit Power Plant System (SNUPPS) simulator at the TTC continues to progress ahead of schcdule.
Earlier difficulties in making house power available have now been overcome.
The projecteddateforthestartofsimulatortestingisJuly7,1987.
Simulator room air conditioning is now operational.
Finishinu " xk on the associated building modifications is proceeding in parallel with simulator hardware installation.
It is anticipated that the final point-to point simulator wiring connections, and simulator computer diagnostic testing, will be completed in time to begin simulator shakedown testing on July 6 or 7, 1987.
At the request of Region IV, Len Reidinger of the Pressurized Water Reactor Technology Branch participated in an Operational Readiness Inspection at Comanche Peak during the period from June 9-July 1, 1987.
Chairman Zech is planning to visit the Technical Training Center on July 16, 1987.
During the visit, the Chairman will dedicate the Westinghouse SNUPPS simulator at a ribbon cutting ceremony for the new facility.
The Chairman will also entertain questions from the Chattanooga press during his visit to the TTC.
l ENCLOSURE H JULY 3, 1987
- >4 i
' Preliminary Notifications The following Preliminary Notifications were. issued during the past week.
PNO-I-87-56, Connecticut Yankee Atomic Power Company (Haddam Neck. Nuclear a.
Power. Plant),EmployeeFoundwithMarijuana.
b.
PN0-I-87-58A, Maine Yankee Atomic Power Company'(Main Yankee Atomic Power Station),UnscheduledPlantShutdown.
PN0-I-87-59, Public' Service Electric and Gas (Salem Unit ),LReactor' Shutdown c.
for Greater than'48 Hours.
d.'.
PNO-III-87-91, Detroit' Edison (Fermi 2)~, Unplanned Mode Change.
PNO-IIJ-87-93,-Cleveland Electric 111uminating Company (Perry 1), Generator.
e.
Hydrogen Leak, f.
PNO-V-87-46,. Sacramento Municipal Utility District.(Rancho Seco), Cable Routing Errors at Rancho Seco, PNO-V-87-11 Update.
PNO-V-87-48, Portland General. Electric Company (Trojan Nuclear Power Plant),
g.
Feedwater Systems Pipe Wall Thinning.
- h.'
PN0-V-87-49,ArizonaNuclearPowerProject(PaloVerdeUnit1),"A" Training Circulating Water Loop Piping Rupture - Unit 1.
- i, ENCLOSURE H JULY 3, 1987
h Office of Special Projects items of Interest Week Ending July 2, 1987 1.
U.S Court of Appeals Decision The U. S. Court of Appeals for the District of Columbia Circuit issued' review of an Order by the Commission (g a petition by interveners for a its decision on June 26, 1987 regardin CLI 86-4) for the extension of the Comanche Peak Unit 1 Construction Permit. The Court of Appeals affirmed the decision that there is no automatic expiration and forfeiture of a construction permit under Section 185 of the Atomic Energy Act (AEA) and that the Commission could amend the permit to extend the completion date-without instituting a de novo construction permit proceeding.
In addition, the Court held that Section 189(a) of the AEA does not require a pre-amendment hearing for a CP amendment where the Commission has made a "no 1
significant hazards" finding.
l 2.
NRC Appeal Board Decision The Appeal Board issued a decision (ALAB-868) on June 30, 1986, with Dr. Johnson dissenting, which affirms the Licensing Board's admission of a contention by interveners (CASE) in the hearing for the extension of the construction permit for Comanche Peak Unit 1.
The applicants and staff had appealed the ASLB's order granting intervention and a hearing on the CP extension. The amended contention alleges that the applicants had failed to demonstrate good cause for the extension because the " delay of construction of Unit I was caused by Applicant's intentional conduct which had no valid purpose and was the result of corporate policies which have not been discarded or repudiated by Applicants."
i JULY 3, 1987 ENCLOSURE J l
V ITEMS OF M Lh 6T Office of Enforcement Week Ending July 3, 1987 The following Significant Enforcement Action was taken the week of June 29, 1987.
A Notice of Violation and Proposed Imposition of Civil Penalty in the amount of $500 was issued to Aztec Laboratories, Kansas City, Missouri on June 30, 1987. The action was based on failure to (1) make surveys the evaluate the extent of radiation hazards that were present after a fire (2) report an event involving licensed material that caused damage to property in excess of
$2,000,, (3) secure licensed materials, (4) test for leakage and/or contamination at intervals not to exceed six months, (5) maintain records of inventories as required, and (6) use licensed materials only at authorized locations.
(EN87-50)
Civil Penalties Paid the week of July 29, 1987.
1.
E. I. duPont de Nemours & Company, Inc., Boston, Massachusetts paid the civil penalty of $12,500. The action was based on an incident in which an individual did not follow the licensee's procedures and as a result received an overexposure to a small area of the left thumb. The over-exposure occurred when the technologist used his hand, rather than a remote handling device, to remove the cap from a vial containing approximately 300 millicuries of molybdenum-99/ technetium-99m.
(EA87-69) 2.
Arkansas Power and Light Company (Arkansas Nuclear One, Unit 1) paid the imposed civil penalty in the amount of $50,000.
The action was based on violations identified during the NRC's Safety System Functional Inspection.
The most significant violation involved the implementation of a modifica-tion to the steam supply lines to the turbine driven Emergency Feedwater pump.(EA86-151) i JULY 3, 1987 E:lCLOSURE K
l OFFI OF OJNSOLl0ATION ltems of Interest 1
Week Ending July 3, 1987 Parking I
tfC has been informed by the ihlte FIint North Limited Partnership, the 1
developers who built our new building, that they propose to provide up to 450 paid parking spaces at White Flint Mall for use by occupants of One Yhite Flint North. his will require approval by the Montganery County Park and Planning Cmmission of an application to arrend an existing special exception for the lot at the Mall site.
% e partnership wilI operate the facility, and wiiI charge s ployees for parking and shuttle bus service. Staff has been told infonmily that the rates charged would be slightly Imer than connercial rates in the area.
Cabiing he Office of Consolidation has decided to place the order for ADP and broadband cabling itself, without going through a contractor. This means that sane of the critical materials can be delivered within 2 or 3 weeks, and that installation can be expedited, thus preventing sane of the delays that had been anticipated earlier.
Schedule Barring any as yet unforeseen implications, it still looks as if most, if not alI, of the staff scheduled to move to One White FIint North wili be able to move in before the end of the year.
JULY 3, 1937 ENCLOSURE L
p CRGR F10NTHLY REPORTS.
1 Week Ending July _3, 1987 j
CRGR Attached is a summary of the CRGR activities for the period' April-1 through' May 31, 1987. ' Background material on topics reviewed by'the Committee and
~
the minutes ~of CRGR meetings is sent to the Commission.. Copies ~aae provided to the Public Document Room after the NRC has censidered (in a publicLforum) or decided the mattar addressed by the documents.
Questions conce"ning this monthly report should be referred to' Tom Cox (492-4148).
JULY 3, 1987 ENCLOSURE fl
1 O
_ n
_ R D
_ o E
g
_ i
_ g 6
n
_ t
_ n
_ c
_ i i
a d
_ a
_ d n
n
_ n u
e
_ o
_ e J
P
_ N
_ P
_ gg
_ nn
_ i i ot
_ tt
_ fD t n
_ ee
_ oG e
_ ee R
m
_ MM
_ l C c l
ad
_ a n
n vn
_ ro
_ vre o
oe
_ ot
_ oem i
rm
_ f
_ rt m t
pa d
_ pf o a
p
_ d e
_ pac d
adt
_ ev
_ a e
n en l o
,r e
dse
_ um
_ dn 7
m0 eom
_ d
_ eof S8 mD d pm
_ ee
_ di o E9 oE noo
_ h u
_ nt s
I1 c
erc
_ cs euwn
._ ml eo T
eo mp
_ ss I
Rt m
c i
_ moii V1 oei
_ y
_ osvt I3 R
chl l
_ ceea T
G etb l 56
_ errc CY R
r u
_ a11
_ r i
AA C
ep
_ i11 l ff M
R u
_ t
_ R afi R
G sr
_ i..
_ G nad GH R so
_ noo
_ Rit o RG Cif
_ INN
_ Cf sm CU O
FR OH T
e
_ e
_ e Y
t
_ t
_ t R1 e
_ e
_ e A
s l
_ l
_ l ML R u p
_ p
_ p MI Gt m
_ m
_ m UR R a o
_ o
_ o SP Ct C
_ C
_ C A
S a
r 5
_ es2o
) _
)
5 S
l t7f S
2 _
R 0
E
_ ur E
6 _
R 6
0 R
_ radsr R
N 5
P nt a l
ane 8 _
l 4 9
e R "s e
_ aR el 6 _ a4 5
l F
_ nF,mc e
- _ nA e
uCdc
_ iC0 eu c
_ i -
c R
rim
_ f 7 rn i m._ fI i m 0 af e 0
i f eg_
Stf eg d1dft
_ d1
,ug ftt _ dUuftt o i M __
e ooiM e
noi
_ e 1 qn
(
sfk
(
soa
_ so5 ei a
ott g27 _ ot
,rn g2
_ o o c g2 d
p S n 6 _ p o
n 5 _ p an 5
n os i y1 _ o s 0 gi s i y9 _ onl i y7 e
rtd rr# _ rt5 nserr# _ rob rr#
g P nnoo
_ P n isioo sge_Pi oo t nsge easge_ wm0rmineu_ wuoneu e, nit A
wm neu_
sot s ed4 eml ot ed
_ el iot s s_
iot pas inepas_
,coipas_
_ in vedSCI ve nccSCI vsaSCI emo
_ em0oea
_ eet R aC - - - _ R a3 cdf - - - _ R rS - - -
e
.t oa ND gg 7
nn 8
ii
/
tt 7
ee 52 ee 1/
MM 15 s
?
F< u
- G$
Gpo CE z ill
7 c
e
_ e e
8 A
r
_ r r
9 1
O n
_ n n
W D
o
_ o o
E i
_ i i
6 t
_ t t
c
_ c c
e a
_ a a
n u
o
_ o o
J N
_ N N
e rn.
f aae f
cf
_ e p
go n
i a c
_ h ennt o
rt i
_ t ria i
eser R
p ht
~
t n
h e
_ fGd t cc a
eRt n
_ oR e fl e
td gG e
Cd f uej nn R ng
_ e n
asl b eadCi
_ cye t euu n
m e
e
_ nb m srrs o
essysh
_ a m
i l nob et
_ uwo td ee t
pop g
_ sec al vb a
miownn
_ sie h ui d
i t reai
_ i vr t otd n
i pih e
wcl e
d s vcd
_ d rl d
eu 7
mO eoee n
_ e a
etf o d af w S8 mD d ph rd a
_ d rr E9 oE n
t e
_ nees nh e I 1 c
ef rdt
_ et vn et l
T eo mff enr
_ mf eo m
yaw Rt maot eo
_ masi mtl se I
V1 ot f mp
_ o t
oneoi I3 R
cseame
_ cnf a cet pv T
G e
c or
_ eioc emaoe CY R
rwnrc r
_ rt i
ruirr AA C
eaeeGe eff cdp M
R nut ret
_ Rl fi R oe R
R G
st Rt
_ Gl ad Gd mwG GH Rf sefU e
_ R ut o R
meR RG C oil oNl
_ Cb sm C aiNC CU O
FR OH T
e
_ e Y
t
_ t g
R1 e
_ e n
A s
l l
i ML R u p
_ p d
MI Gt m
_ m n
UR R a o
_ o e
SP Ct C
_ C P
A S
r "s
e c
i
_ n t
t r
e
_ i n
t e
f u
_ t a
e n
osR
_ e l R L
S e
sR l ePR E
G nIN l p N
c e
R
_ ui r itt o
l 3i g-2
_ BP e-rna a1t n 2
w eer n3 uie
_ Cf oe nm e
i0l k c
_ R oP c ene c
_ N im Gig i m f - ocim Gsaf eg grf e aa f e dE erftt
_ d naft dtk ft eR rC oiM
_ eieoi ena oi sU
(
_ snl s oe a
oN g e g2
_ o n c g2 8 ocl g26 _
d p
npn 6
pi un 6
p n
6 _
n odiii y5
_ ohNi y1 o gd i y1 _
e rntP rr#) _ rT rr#
rne rr# _
g P an oo 9 _
P" noo Pit oo A
eR sge8 _
isge na sge_
wrsWneu
_ w neu wrr
. n e u __
eeeB ot s,_ exsot s eegsot s
it r pas 1 _ ixl pas i cet pas _
vt peSCI3 _ vl SCI vnt sSCI _
eeeh
_ e7 a eone RL rt - - -
_ R8W-R cit - - - _
e
.t oa ND gg 7
nn 7
8 ii 8
/
tt
/
7 ee 47 31 ee 1/
1/
MM 15 14
, = < d., 8 ~
OEEM 2 c!.
I
.1
1 O
n N
_ n D
o
_ o 0
E i
g
_ i 6
t nO
_ t c
iD
_ c e
a dE
_ a n
n u
o eo
_ o J
N Pt
_N s.
s d
nf
_ e n
e of
_ u o
s fi a
_ s fi o
ftt
_ sdft praas
_inaa oot c at c rf si e o
_ o si p
f c t
_ t r f
dRii eRi eeGdf
_ l tGd l
h uR of at
_ atR o n
t sCmo vn
_ veCm o
s oe
_ ol i
ti rdm rm
_ r gd t
a eea pm
_ pcne a
h etd r po pi i d d
tbf ng ac
_ arwn n
aeo eoe mr dc
_ d nl m e
d e,mp 7
mO ed ei
_ eel m S8 mD dit o dl
_ d goo E9 oE nuncy nb
_ n f c I1 c
egeeb eu
_ ed e
T eo m
mr mp
_ me
,r I
Rt mym e
m
_ mss V1 orofd or
_ ooef I3 R
cocoa co
_ cpro T
G et m
ef
_ eou CY R
racw r
_ rrsw AA C
li ee e
poe M
Rul ib R u
_ R l i R
G gb v G s
_ G ecv GH R eueo R s
_ Rh ne RG Crprt Ci
_ Ct er CU O
FR OH T
e e
_ e Y
t t
_ t R1 e
e
_ e A
s l
l l
ML R u p
p
_ p MI Gt m
m
_ m UR R a o
o
_ o SP Ct C
C
_ C A
S e
ng oa i rr m
yt oe r
rat w R
R e
R ocS o R
R T
R ti P
N d
N c-n N
afd ye
_ i t o li ar ct
_ rri ul ea i a
_ eot gal e e
l r e
_ nh a e
eu l
c og c
_ eS c c
RQdc i m P e i m
_ G i
im eu f e t
f e gf f e d",tN ft d n ft
_ dni ft e
a oi eI oi
_ ei c oi s5l r s
_ sd e a
o-eo g2S on g24 _ o r p s g2 3 _
d p6Rf n
6 po n
6 _ paSt n 6 _
n o0 -
i y1 o
i y1 _ og n i y1 _
e r0 ys rr#
rt srr# _ rel err # _
g pet e".sge oo P neoo
_ P ramoo A
E ei sge_
el cesge_
w f rsneu wmuneu_ wrivneu_
eeaet ot s eed ot s eenoot s idSt npas it ith rpas _
e p a s __
vi t aSCI vt c pS C I _
vahSCI euf al et c
_ eeem RGoBP - - -
RSS - - - _ RLTI - - - _
e
.t
)
oa d
ND eu gg n
nn i
7 ii t
8 tt n
/
ee 3 o 27 ee 1C 1/
MM 1(
14 cF<u, G$
PSEm l
?
c l
M..
7 c
e 8
A r
9 V
1 O
n D
o E
i 6
tc l
e a
MJ nu o
N e
ht we fiove l R a
n vd o
or i
ra t
pd a
pn d
aa n
t e
dS 7
mO e
S8 mD dl E9 oE na.
I 1 c
ens T
eo mie Rt mf g I
V1 o
n I3 R
cd a T
G eeh CY R
rsc AA C
o M
R pn R
G oa GH R rl RG C pP CU O
FR OHT e
Y t
R1 e
A s
l ML R u p
MI Gt m
UR R a o
SP Ct C
A S
o ed t
pn n) ia R
no2 p
R N
)
oi
. s it6td e2 6
net 9
si is3 et a vo mai1 e
eP nel d c
mg r
orues i
l i it ms f et dat usra ftM eccqoel oi(
s i e e pt C a
onS r n
g25 d
ph oi n n
4 n
ocP gt i
i y1 e
reR n y
rr#
g pTSi grsgoo A
( nnaensge wh rirrineu ec1 ett upot s in-caiti pas vaB nl b ppSCI erE oeru RBMcrar3 - - -
e
.t
)
oa d
ND eu gg n
nn i
ii t
tt n
ee 2o ee 1C MM 1(
, a$
9PSEm 2 s
cF< u*
,u
ITEMS ADDRESSED BY THE COMMISSION - WEEK ENDING JULY 3, 1987 A.
STAFF RE0VIREMENTS - AFFIRMATION / DISCUSSION AND V0TE, 10:00 A.M., THURSDAY, JUNE 25,1987, C0ftilSS10NERS' CONFERENCE R00fi, D.C. OFFICE (OPEN TO PUBLIC ATTENDANCE) - Memo to V. Stello, ED0 fm S. Chilk, SECY dated 7/1/87 I.-
SECY-87 Final Rule to Modify the Requirement that Power Reactor Licensees Maintain Property Damage Insurance The Commission, by a 5-0* vote, approved a final rule for publication in the Federal Register.
The rule amends 10 CFR 50.54(w) to require utilities to maintain $1.06 billion in on-site property insurance to provide financial security for stabilizing and decontaminating their licensed reactor in the event of an accident.
All Commissioners also approved OGC's approach (3A) to estab-lishing a trust arrangement to provide greater assurance of availability of funds for decontamination following an accident.
Commissioner Asselstine, while approving, would have preferred additional modifications which would set an absolute minimum of
$1.06 billion even if capacity fell below that amount and would have provided for periodic review by the staff of the amount of insurance required.
The attached editorial comments by Commissioner Carr should also be included in the Federal Register notice.
The Federal Register notice should be revised as noted and forwarded for signature and publication.
Attachment:
Not included
- Section 201 of the Energy Reorganization Act, 42 U.S.C.
55841, provides that action of the Commission shall be determined by a " majority vote of the members present."
Commissioners Bernthal and Carr were not present when this item was affirmed.
Accordingly, the formal vote of the Commission was 3-0 in favor of the decision.
Commissioners Bernthal and Carr, however, had previously indicated that they would approve this paper and had they been present they would have affirmed their prior votes.
JULY 3, 1987 ENCLOSURE P
l lll]
il jIj)
)]qJjIll11 k
n c
k o~
i g
)
T n
s r
n s
C i
u e
i
(
7 A
w g
m a
s e
8 T
h r
o n
s l
9 N
c e
r n
i i
1 O
S F
y D
e V
f C
a K
u c
t 3
R S
L Q
W M
S e
k R
Y N
c L
W R
T A
E G
o d
U J
e c
v i
i m
t o
c t
e e
A p
/
s s
TS X
u e
e NE E
o
/o e
r AE L
C Ch N
k S
CD P
E Sg U
n P
e IN U
N P n P
a P
h LE N
N Wi G
Y W
t PT
/
/
/t
/
/
/
PT C
C Cs C
C C
n AA R
R Re R
R R
i N
N NW N
N N
de hd e
e c
- tn y-s s
e a
nia gr nr e
k e
l iw ooo oa vsn h
p a
C ltt pe ida t
d meR 13 oa osl toy
,d uN dre tec ar n
n rg Ne oee Ru n
t I a a
ood n
hnn y
N rl a A
4 fl n ro teu gr eo Rs e
2 aa ot ega ook trl u
l 4
si fs m
w l oe lto ot.
b 7
ede l
me ol e ano t a3 a
r e
sl raK dFr op t -
l 2
S u gt.
ki ie o
C gc ssp i
9 E
dntg cM et r h c n
l e
N a
4 C
eiin o
h so tirn ide smW v
T S
onmc ro r
Msti nof orr.
a g
I E
cumi lf t
f emeo sl u na n
O O
rioa e
tol ist e
pgo y
i N
P ptCf tn nfa eeya cft sof l
l R
n r
no e
v hSOt i on er c
l G
U ho
.e ii sho t
S l
e rps i
a N
P scht t
ecm wr l p n
l c
I i
cn sa rae.
seog sas sea b
T l aei sr porf sNfn sv scl u
y E
b T
ue r
f u
i uoe unp p
b E
ag s
cp opra cpat cmh ce M
t nXs so tpet sora set sie e
d icr d
e siEu i
abs il t r ir R
enLc dp C b
dece d
me dsu a
n R
iP s o
Sdue ven row ot m
i N
oaUi oo Pnnh oepe ooro oeu a
TtNd Tl Wast TDSG TffR T gf e
t b
bo d
d l s l m e
l l
io b
i i
u g
g u
g g
wo B
n n
B n
n r
n i
i i
i s
a k
d d
k d
d gt c
n l
l n
l l
nn N
a i
i a
i i
ie s
O B
u u
B u
u t m e
I 4B 2B 8B 4B eu c
T 0l 1
1 7l 1
1 ec i
0 1 s 1 s mo t
A 1'
1 s 3s C
1t
- p
- p 5 't p
- p d
o O
6a Pi Pi 6a Pi Pi e
n L
N l
l N
l l
sc m.
ml ml m.
ml ml ei g
o oi oi hl n
o oi oi od oh oh od oh oh tb i
t fp e
o e
l m
sa TR 3
5 9
9 8
ec e
EE 2
0 1
2 0
io s
KB 4
3 2
0 5
rl e
CM a
h OU 0
0 0
0 0
md t
DN 5
5 5
5 5
mn ua f
s o
C fR y
oN r
a se m
i.
m.
a E
M m.
m.
m.
m.
eh m
7 7
7 a 7a 7
it u
I 7
T 8a 8a 8a 8
8 8a p
s
/
/
/
/
/0
/0
/
on E
70 70 70 70 70 80 Ci A
T 00 00 00 0:
0:
00 A
/:
/:
/:
/0
/0
/:
D 79 79 79 71 71 79 aE* ? ~E" my8 mo lllllliIl
l 4
ii jjj
- I
.lillIl1I
]
n o
w r
t
)
e e
n y
s h
h i
e
(
T o
c g
n e
7 C
n y
s g
o l
8 A
o e
i i
o i
9 T
D l
F W
R f
1 N
d O
u t
C N
D C
L L
e k
3 R
c Y
R J
R D
D V
o d
L N
U e
J v
i tc e
p
.o s
C e
G C
r
/
P TS A
E E
P N
e NE V
C S
E Y
h AE T
S P
A V
t CD
/
/
/
/
/
IN C
C C
C C
n LE R
R R
R R
i PT N
N N
N N
d PT y
e AA ghs d
ncr
)
t n
c e
6ito 2
i e
o a
ds 8dit l
r i
l es
/ rwa d
i u
s p
tu 3asr sn b
l n
ncc 1 g e
sa a yi a
d gus
/ern a
et ra p
n idi 6ree p1 dhphf fx a
snd fg y
ntei oe 4
sts Bs a
cl e e
2 eo sl l
4 snl t
ycil dceh ba
'e e a e Ti s b a x g) uo b
7 Dn i
un2 t o a
tg y
eurs nnl o s qt e3 RU sdeai ap l
2 yen s.
t i
9 S
eil u ne i
E deiq erddd dm l sio o
sl a
4 C
nbwe c
a n
ee aumt rN e.
v I
e S
itoya sl n
r o
wue a
g T
p)f l nl c oa asesfk efe n
O eIft e
n2 pS dtn o
i k
y i
N E
dDaa emte o(
eoeoeo vtn l
l S
nit h di g e r
hhdinC ena c
l G
O i( sf tnnrr pn tt ta rey i
a p
l c
N P
f eUef o
eoar s m t c c C.
sst b
I R
snCa sm mo si s
i s
n u
y T
U sort saoen st E
P uiNs u
t O
ua u s e f gD udo p
b E
ct ce e
cc ciein(
cem M
scee ssthn si sssdi ssr e
d i oe d
e ynodf iehh inita if i
R d pt t den S
di dl eml o d pV a
n R
s cur d
ac i o o
m i
N onyy oi ot oo onifur ort a
Tibb Tl afa TM Tal obp Tpa e
t b
bo d
d l s
.l l
l l m e
io b
mP i
i R
u u
g g
wo e
B B
n n
r n
r gN i
i s
a edT k
k d
d gt c
vi n
n l
l nn iR,
a a
i i
ie s
R a
B B
u u
t m e
yg 4B 8B eu c
ero 0l 7l 1
1 ec i
1 s 1 s mo t
N eao 1 't 0 't 1
5
- p
- p d
o O
snn I
soa 6a 6a Pi Pi e
n T
eit N
N l
l sc A
nst m.
m.
ml ml ei g
C nsa o
o oi oi hl n
O eih od od oh oh tb i
t f p e
o e
l m
/
/
/
sa TR 78 12 21 6
1 ec e
EE 22 66 71 1
7 io s
KB 33 33 23 3
2 rl e
CM a
h OU 0
0 0
0 0
md t
DN 5
5 5
5 5
mn ua f
s o
C fR y
oN r
a se m
m.
m.
E eh m
M m.
m.
m.
7 7 a 7
7 a it u
I 7
T 8p 8a 8
8a 8
p s
/
/
/
/0
/
/0 on E
80 90 90 40 40 Ci A
T 00 00 0:
10 1 :
A
/ :
/:
/0
/:
/0 D
71 79 71 79 71 E' r
%m O8EEA c llI!!
7 C
g n
8 A
i i
i e
i 9
T W
t W
F f
1 N
r O
a t
C L
M L
L e
k 3
R c
Y R
D R
D R
o d
L N
U e
J v
i tce G
G p
s G
G e
E E
o r
/
/
o
/
C TS P
C P
E e
NE E
E E
N h
AE A
P A
N t
CD
/
/
/
/
IN C
C C
C n
LE R
R R
R i
PT N
N N
N d
PT e
AA e
c v
2 a
s y
f' s
y l
i p
n b
ot rm n
b o
coo o
3 i -
C sett i -
C d
t ndE urat tndE e
n sinM t rr0 sinM rn a
e aI aoe0 e
aI eo un tcp un tt e
qoso s
oh qoso es l
pt r
c pt ml b
gmm t oea gmm al a
naud nfh e naud ri l
S~
i rpe) e tP i rpe) aM i
E~
d g tk rs
(
d g tk P
a C
nofto rno nofto r
v I
aroio uat e aroio yo a
T t p mC cl u
t p mC tf O
s gs pd s s
gs e
y N
E t rnn.
e es trnn.
f m l
h sti u a i a C.
ae c
u a i a C.
S a
oet r St i
oet r t 'y l G
O e
ystD s
l N
P ystD I
R ee
(
snec ee
(
sy b
T U
v0t s sarn v0ts sS u
E P
l 1 a
up a
l 1 a
u p
cy cmsm c
e E
o e
M sd csr sonr) sd csr sa e
eniee icoo3 eniee il d
R r2 vvt d
if r2 vvt dp a
R rl t et rd rl t s
m N
oneae oh cen oneae oi Tosvl Ttapa Tosvl TD e
b l s l m iowo g
r I
n r
I d
r s
t M
i t
M l
C d
C i
gt l
u nn ee 3B ie
.ee i
mtl u
mtl 3
t m ril 2B ril 0s eu oSi 2
oSi 5t ec N
f v
4 s f
v h
mo O
nk s
- p nk s Rg d
I I on Pi I on Ai e
T oe l
oe R
sc A
kC v ml kC v m
ei C
o e
oi o
e or hl O
oCt oh oCt oi tb L
f p o
l
/
/
sa TR 56 78 56 3
ec EE 1 1 77 11 2
io KB 33 22 33 4
rl CM a
OU 0
0 0
0 ndmn DN 5
5 5
5 ia s C fR oN se E
eh M
m.
m.
m.
m.
7 7
7 it I
7 T
8a 8p 8a 8a p
/
/
/
/
/
on E
50 50 60 20 Ci T
10 10 10 20 A
/:
/:
/:
/:
D 78 72 78 79
- f $"
CMEEA o 2
O l
n t
C u
o e
k A
D c
P o
S O
R J
d ev i
tcep ser
/TS e
NE h
AE t
CD I N n
LE i
PT A
A PT V
V AA T
T de ca l
I p
X d
d n
n a
a n
I g
e l
I i
b I
s S
e a
l G
s d
i N
n I
o t
a T
i n
v E
t e
a E
c d
M e
n y
l S
e D
p c
i E
E.
e l
C Ms d.
b I
S n nn T
Ao io up O
s i
N E
si st S
sr sc e
P O
ua ue d
S P
cp cp am O
R sm ss U
io i n P
Dc Di e
b l
m l s R.
i m
rN wo t
eT o
sr s
v g
e i,
W Ra nt in g
t eo te N
9sg eo em O
1 en sn eu mc I
3Wi sa T
d et o
A mtl nt ed C
osi na sec O
oau eh hi L
f u op TR 01 78 EE 99 22 sl KB 33 33 ea CM ic OU 0'
0 ro DN 5
5 al m
md un sa fC oR E
m.
m.
M 7
7 N
I 8a 8p see T
/
/
/
60 80 ih pt E
20 00 o
T
/:
/:
A 69 71 Cn D
0 0
- i Er* y EPSEm c t
- jt