APPENDIX A NOTICE OF VIOLATION Pacific Gas and Electric Company Docket No. 50-133 Humboldt Bay Power Plant Unit 3 License No. DPR-7 During an NRC inspection conducted on June 2-5, 1987, a violation of NRC requirements was identified.
In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1987), the violation is listed below:
Technical Specification VII.B.2 states, in part, that "The stack particulate filter will normally be removed for laboratory counting on a weekly schedule (sample intervals shall not exceed 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />)."
Contrary to the above, the stack sample was changed on December 8, 1986, at 11:36 p.m. and not removed for laboratory analysis until December 17, 1986, at 8:40 a.m., a time interval of 201 hours0.00233 days <br />0.0558 hours <br />3.323413e-4 weeks <br />7.64805e-5 months <br />.
This is a Severity Level V violation (Supplement VI).
In view of the corrective action taken which was verified by the inspector during the inspection, no response to this Notice is required.
b u
Dated at Walnut Creek, California F.A.yenplawski,Ch f this Q day of.3ttov t967 Emergency' Prepared s and Radiological P otection Branch i
I 8707100083 870623 DR ADOCK 050 3