.. _ . . _ _ . - .- - _ _ -. - . - _ - _ _ - - _ _ _ . - - . . _ - _ . - - - _ _ .- _ _ _ - _ _ _ _ _ _ _ - - _ _ . _ _ - - .

o.

[l I

/l

- I. Monthly Reoort for Byron Unit 1 for the month of' January 1989 A. Summary of Operatino Experience for Unit 1 J

r The unit began this reporting period in Mode 1 (Power Operation)'at approxime sly 100% power. The unit operated at power levels of up to approximately 100% power until 01/10/89 when a power reduction was initiated to repair.a' tube leak in the 1B circulating. water box. The unit was returned to approximately 100% power on 01/11/89. The unit operated at power levels of up to approximately 100% power until 01/31/89 when a manual. reactor. trip was initiated due to a feedwater regulating valve failure. The unit remained in Mode 3 (Hot Standby) for the rest of the reporting period.

O e

R CK 05000454 PDn (0625M/0062M-3) w w :.=__- _ ~ = _ ~ _ - __. . . , __ . _ _ . . .

B. OPERATING DATA REPORT

. DOCKET NO : 050-454 UNIT Byron One DATE: 02/10/89 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 OPERATING STATUS

1. Reporting Period: January 1989. Gross Hours: 744 l
2. Currently Authorized Power Level 3411 (MWt)

Design Electrical Rating: 1175 (MWe-gross)

Design Electrical Rating: 1120 (MWe-net) '

Max Dependable Capacity: 1105 (MWe-net)

3. Power Level to Which Restricted (If Any): N/A
4. Reasons for Restriction (If Any):

THIS MONTH YR TO DATE CUMULATIVE *

5. Report Period Hrs. 744 744 29617
6. Rx Critical Hours 730 730 22527.1
7. Rx Reserve Shutdown Hours 0 0 37.8
8. Hours Generator on Line 730 730 22086.9
9. Unit Reserve Shutdown Hours 'O O O
10. Gross Thermal Energy (MWH) 2435488 2435488 65962801
11. Gross Elec. Energy (MWH) 832709 832709 22145590
12. Net Elec. Energy (MWH) 79290s 792908 20825416
13. Reactor Service Factor 98.1 98.1 76.1 ..
14. Reactor Availability Factor 98.1 98.1 76.2
15. Unit Service Factor 98.1 98.1 74.6
16. Unit Availability Factor 98.1 98.1 74.6
77. Unit Capacity Factor (MDC net) 96.4 96.4 63.6
18. Unit Capacity Factor (DER net) 95.2 95.2 62.8
19. Unit Forced Outage Hrs. 14.0 14.0 1048.6
20. Unit Forced Outage Rate 1.9 1.9 4.5
21. Shutdowns Scheduled Over Next 6 Months:
22. If Shutdown at End of Report Period, Estimated Date of Startup: 02/01/89
23. Units in Test Status (Prior to Commercial Operation)t None
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

(0625M/0062M-4)

_ _ _ , _ _ _ _ _ . _ _ _ - - m_ _ __ __ -__. __ ____ _ _ _ _ _ __ __ _ _ _ _ _ _ _ _ _ _ _ . - - - - - - - - - -_____s

4

-C. AVERAGE' DAILY UNIT POWER LEVEL-

. ' DOCKET NO.f. 050-454' UNIT: Byron One' DATE: 02/10/B9 COMPILED.BY: D. J.-Spitzer TELEPHONE: (815)234-5441-x2023 MONT : January, 1989 DAY AVERAGE DAILY POWER LEVEL .

(MWe-Net)

1. 1087 MW 16. 1102 MW
2. 1070 MW 17. 1104 MW
3. 1099 MW 18. 1107'MW
4. 1099 MW 19. 1109 MW
5. 1098 MW 20. 1104 MW 6, 1100 MW 21. 1091 MW
7. 1087 MW 22. 1091 MW
8. 1087 MW 23. 1104 MW 9, 1075 MW 24. 1109 MW
10. 814 MW 25. 1111 MW
11. 1023 MW 26, 1114 MW
12. 1106 MW 27, 1105 MW 13, 1104 MW 28. 1107 MW .
14. 1092 MW 29. 1106 MW O 15. 1074 MW 30. 1105 MW E

art b 31. 441 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day j in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

(0625M/0062M-t)

R l i

t a n F e

v k 0

_ e a3 r

e5

_ P L W F

o e1 t b ue n T v )

o l 1

  • *
  • i x a t6
  • t oV r1
  • c b o0
  • A r g t p -
  • en n eG
  • e t i e r tR E
  • v at n o e R
  • i W la o p

f f et U

  • t H oh nN
  • c gu m s S e(
  • e ng o & nn v
  • N* r i e C oo yE e
  • C* r t R Fii r l
  • R
  • o a & t t t ei
  • Y* C l r .

t caneF

  • B
  • ue m i urE s
  • * & ct e b r a n)
  • r a t i t paeR
  • e i w s h s et cE
  • s Cd y x nr ail
  • u e S E I PDL(
  • a B e
  • C I F t

n e

n 0 o 3 p 5 m d u W . a a S

N C o F rm o 1 cadL O S re I c ud T l l S ne C m aa i c r U e d u u ot ue D t o nnt ndh E) s h a a uoet R 1 y WW t MMA CR O

/ S CF e - - - - - -

ST M 1 2 3 4 5 9 NI WN r OU e D( b T m U u H N S r R o T E r I L r N E U n r n d i r eo n o mehi o h d pt t i t A- -OO c t e - i ga M 5 2 F GH rnn tii n s nm o et eia s r s R ax a ue rE e l T yT R AA i gr e s

ar nor s F oit on 9 r 0 l at e 8 u pt el ac 9 o 4 n i n u uri 1 H 1 o uif gel s qa e e p y

_ a E MR RO&

g e - - - - -

r p R A B C DE a y u T - F n

a J * *

  • 9 9 *
  • d e 8 8 *
  • o t / / *
  • i a 9 1
  • y*

r D 03

  • r*

e / /

  • a*

P 1 1

  • m* d t

0 0

  • m*
  • u*

ed c e r

  • S
  • r h o .
  • E o c p o 1 2 *
  • P F S e N *
  • Y - -

R * *

  • T F S rff., ii 'r?' F L _l - ,  !

1 i

E. UNIOUE REPORTING REQUIREMENTS (UN3T li for the month of January 1989 j

1. Safety / Relief valve operations for Unit One.

VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None l

1

2. Licensee generated changes to ODCM. (Y/N) >

No

3. Indications of failed fuel. (Y/N)  !

i No

]

l l

(0625M/0062M-7) l 11-_-_a._ __--- - - - - _. '

F. LICENSEE E*!ENT REPORTS (UNIT 1)

The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, January 1 through January 31, 1989. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

Occurrence Licensee Event Report Number Date Title of Occurrence None 4

+m e

(0625M/0062M-8)

. . - . _ _ _ ~ _ _ , _ .-_ = _ . ~ - _ - -

KI. Monthly Report for Byron Unit 2 for the month of January 1989 A- Summary of ODeratina Experience for Unit 2 The unit began this reporting period in Mode 1 (Power Operation) at approximately 34% power. The unit continued it's coastdown until 0021 on 01/07/89 when the unit was taken off line for the first refueling outage. The unit was cooled down and entered Mode 6 (Refueling) at 0800 on 01/16/89. The unit remained in Mode 6 for the rest of the reporting period.

m e

i (0625M/0062M-9)

- *.-..a ~ . _ . + ._ '2._ ~ .n._ ,t~...._2... _ w _....mu.._._.n_-._ .--'---_st'LxJ-._~

B. OPERATING DATA REPORT DOCKET NO.: 050-455 UNIT: Byron Two-DATE: 02/10/89 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 OPERATING STATUS

1. Reporting Period: January 1989. Gross Hours 744
2. Currently Authorized Power Level 3411 (MWt)

Design Electrical Rating: 1175 (MWe-gross)  ;

Design Electrical Rating: 1120 (MWe-net) '

Max Dependable Capacity: 1105 (MWe-net)

3. Power Level to Which Restricted (If Any): N/A
4. Reasons for Restriction (If Any):

THIS MONTH YR TO DATE CUMULATIVE *

5. Report Period Hrs. 744 744 12721
6. Rx Critical Hours- 144.3 144.3 11149.5
7. Rx Reserve Shutdown Hours 0 0 0
8. Hours Generator on Line 144.3 144.3 10845.5
9. Unit Reserve Shutdown Hours 0 0 0
10. Gross Thermal Energy (MWH) 156411 156411 26981828
11. Gross Elec. Energy (MWH) 48706 48706 8946623
12. Net Elec. Energy (MWH) 36114 36114 8364940
13. Reactor Service Factor 19.4 19.4 87.6
14. Reactor Availability Factor 19.4 19.4 87.6
15. Unit Service Factor 19.4 19.4 85.3
16. Unit Availability Facter 19.4 19.4 85.3
17. Unit Capacity Factor (MDC net) 4.4 4.4 60.0
18. Unit Capacity Factor (DER net) 4.3 4.3 58.7 l
19. Unit Forced Outage Hrs. - 0 0 462.6
20. Unit Forced Outage Rate 0 0 4.1
21. Shutdowns Scheduled Over Next 6 Months- i
22. If Shutdown at End of Report Period, Estimated Date of Startup: 03/10/89
23. Units in Test Status (Prior to Commercial Operation): None l
  • Note - The cumulative numbers do not reflect power generated prior to commercial service.

(0625M/0062M-10)

_ - -__ ,_ - .- ~_~ n

C. AS!ERAGE DAILY UNIT POWER LEifEL DOCKET NO.: 050-455 UNIT: Byron Two DATE: 02/10/89 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 MONTH: January, 1989

. DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

1. 318 MW 16. -10 MW
2. 312 MW 17. -10 MW
3. 309 MW 18. -10 MW
4. 309 MW 19. -10 MW
5. 290 MW 20. -10 MW
6. 253 MW 21. -11 MW
7. -21 MW 22. -11 MW
8. -19 MW 23. -9 MW
9. -17 MW 24. -8 MW
10. -16 MW 25. -8 MW i
11. -13 MW 26. -7 MW l

~

12. -11 MW 27. -7 MW
13. -11 MW 28. -7 MW
14. -10 MW 29. -8 MW
15. -10 MW 30. -8 MW i
31. -16 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

(0625M/0062M-11) e i b m_m._ __. _ m e m. c- _-._ u - m, __m- __ > - - - _ _ . . -- m. ..- - -. _ -- - . - - - _ m--- - - -j

_ c e

R t

n e ~

v e

r P

)

o

_ 1

_ t t 6

  • r1
  • n o0
  • o g t p -
  • i n n eG
  • t i e r t R E
  • c l n o e R
  • A e o f f et U
  • u p H oh nN
  • e f m s S e(
  • v e o & nn v
  • N* i R C ooyE e
  • O* t Fii r l
  • R
  • c r & t t t ei
  • Y* e o t caneF
  • B* r F m i urE s
  • r e b r a n)
  • o n t i t paeR
  • C w s h s et cE
  • o y x nr ail
  • * & d S EI PDL(
  • t
  • e u
  • s h
  • u S
  • *
  • a C 2 t

i n

U m d a a S

N t

n rm o cadL O e S r e I n cud T o l l S ne C p aa i c r U m d uuot ue D o o nnt ndh E) C h aauoet R2 t MMACR O

/ m e - - - - - -

S T e M 1 2 3 4 5 9 NI t WN s OU y D( S T

U r H e S b r n

o T m r I N r N E U R n r n E i r eo n L mehi o d pt t i d AOO c t o - - - i ga h . F GH r nn t 1 tii e s nm M et ei a r s R a x n ue rE o l T yT s i gr e a C ar nor s e F oit on 9 R 8

l at e pt el ac 9 s 7 n i. nu uri 1 r o nif gel u 9 s qaeep o 9 a E MR R O&

y H 5 e - - - - -

r R ABCDE a g u g S n y a T J * *

  • 9 *
  • d 8 *
  • o e / *
  • i t 7
  • y*

r a 0

  • r*

e D /

  • a*

P 1

  • m* d t

0

  • m*

u*

ed r

  • c e
  • S* rh o .
  • E oc p o 1 *
  • P F S e N =
  • Y - -

R * *

  • T FS

, : 1 r(Vlf 4 ! P '  ; , ) > 4

L UNIOUE REPORTING REQUIREMENTS (UNIT 2) for the month of January 1989

- l 4

1. Safety / Relief valve operations for Unit Two.

VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVTEI Fone

2. Licensee generated changes to ODCM. (Y/N)

No

3. Indications of failed fuel. (Y/N)

Yes. U.T. exams indicate 6 failed fuel rods

. es O

(0625M/0062M-13)

._.a____ ___.__2_ . _ _ . _ _ .___m_n"_ ._ k _. A.. _ ._ __ _ _ _ _ _ _ = s___ a , a _ m m 1 0 _ * .:

. F. LICENSEE EVENT _. REPORTS (UNIT 21 The following is a tabular summary of all Licensee Event Reports for' Byron Nuclear Power Station, Unit Two, submitted during the reporting period, January 1 through January 31, 1989. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.

Occurrence Licensee Event __ Report Numhal DALg Iltle of Occurrence 88-012 12/15/88 Reactor Trip on Indicated Low Reactor Coolant Flow Rate.

Caused by Cleaning Flow Transmitter Vent Valve.

S (0625M/0062M-14)