Similar Documents at Byron |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 ML20236R1531998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248M3071998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Byron Nuclear Station,Units 1 & 2 ML20247J9091998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20216D5881998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20248L1531998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20202G1881998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Byron Nuclear Power Station,Units 1 & 2 ML20198P2461997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20197F1201997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20199D1491997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Byron Nuclear Power Station Units 1 & 2 ML20211P8861997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20217A9031997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20211P9061997-08-31031 August 1997 Corrected Page 8 of Monthly Operating Rept for Aug 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20210L4061997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20149D9441997-06-30030 June 1997 Monthly Operating Repts for June 1997 Byron Nuclear Power Station,Units 1 & 2 ML20210L4111997-05-31031 May 1997 Corrected Page 6 of Monthly Operating Rept for May 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3081997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141E2491997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3491997-04-30030 April 1997 Corrected Pp 4 & 10 of Monthly Operating Rept for Apr 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20140D7511997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20141C3281997-03-31031 March 1997 Corrected Page 4 of Monthly Operating Rept for Mar 1997 for Byron Nuclear Power Station,Unit 1 ML20141C3131997-02-28028 February 1997 Corrected Pp 4 & 6 of Monthly Operating Rept for Feb 1997 for Byron Nuclear Power Station,Unit 1 ML20136H5811997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Byron Nuclear Power Station,Units 1 & 2 ML20134L8651997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Byron Nuclear Power Station ML20133M2391996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20132C4521996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0561996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20129A6861996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Byron Nuclear Power Station Units 1 & 2 ML20117N5051996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Byron Nuclear Power Station,Units 1 & 2 ML20134N0861996-08-31031 August 1996 Revised Monthly Operating Rept for Aug 1996 for Byron Unit 2 ML20134N0631996-07-31031 July 1996 Revised Monthly Operating Rept for Jul 1996 for Byron Unit 1 ML20116M6481996-07-31031 July 1996 Monthly Operating Rept for July 1996 for Bs NPP Units 1 & 2 ML20115E2141996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Byron Nuclear Power Plant Units 1 & 2 ML20117M3851996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Byron Nuclear Power Station ML20117G6261996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Byron Nuclear Power Station Units 1 & 2 ML20101R6151996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Byron Nuclear Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H5221999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Byron Station, Units 1 & 2.With ML20217P6351999-09-29029 September 1999 Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212B9261999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Byron Station,Units 1 & 2.With ML20210R3431999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Byron Station, Units 1 & 2.With ML20210E2251999-07-21021 July 1999 B1R09 ISI Summary Rept Spring 1999 Outage, 980309-990424 ML20209G1751999-07-0808 July 1999 SG Eddy Current Insp Rept,Cycle 9 Refueling Outage (B1R09) ML20207H7941999-06-30030 June 1999 Rev 0 to WCAP-15180, Commonwealth Edison Co Byron,Unit 2 Surveillance Program Credibility Evaluation ML20207H8071999-06-30030 June 1999 Rev 0 to WCAP-15178, Byron Unit 2 Heatup & Cooldowm Limit Curves for Normal Operations ML20207H7851999-06-30030 June 1999 Rev 0 to WCAP-15183, Commonwealth Edison Co Byron,Unit 1 Surveillance Program Credibility Evaluation ML20207H7771999-06-30030 June 1999 Rev 0 to WCAP-15177, Evaluation of Pressurized Thermal Shock for Byron,Unit 2 ML20209H3711999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Byron Station, Units 1 & 2.With ML20207H7561999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20207H7621999-06-28028 June 1999 Pressure Temp Limits Rept (Ptlr) ML20195J8001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Byron Station,Units 1 & 2.With ML20207B6481999-05-25025 May 1999 SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station ML20195B2591999-05-19019 May 1999 Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations ML20206R6991999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Byron Station Units 1 & 2.With ML20195C7961999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) M980023, Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A)1999-04-28028 April 1999 Rev 2 to NFM9800233, Byron Station Unit 2 COLR for Cycle 8A (BY2C8A) ML20205P7001999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Byron Station,Units 1 & 2.With ML20205B5091999-03-26026 March 1999 SER Accepting Relief Requests 12R-24,Rev 0 & 12R-34,Rev 0, Related to Second 10-year Interval Inservice Insp for Byron Station,Units 1 & 2 ML20205C5101999-03-21021 March 1999 Revised Safety Evaluation Supporting Improved TS Amends Issued by NRC on 981222 to FOLs NPF-37,NPF-66,NPF-72 & NPF-77.Revised Pages Include Editorial Corrections ML20204G3831999-03-19019 March 1999 Safety Evaluation Accepting Second 10-yr Interval ISI Request for Relief 12R-11 M990004, Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function1999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20206A8831999-03-17017 March 1999 Rev 0 to NFM9900043, Byron Unit 1,Cycle 10 COLR in ITS Format W(Z) Function ML20207M9231999-03-12012 March 1999 Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results ML20204H9941999-03-0303 March 1999 Non-proprietary Rev 4 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations ML20204C7671999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Byron Station,Units 1 & 2.With ML20199G8271998-12-31031 December 1998 Rev 1 Comm Ed Byron Nuclear Power Station,Unit 1 Cycle 9 Startup Rept ML20205M7061998-12-31031 December 1998 Unicom Corp 1998 Summary Annual Rept. with ML20202F6181998-12-31031 December 1998 Cycle 8 COLR in ITS Format & W(Z) Function ML20206B4001998-12-31031 December 1998 Annual & 30-Day Rept of ECCS Evaluation Model Changes & Errors for Byron & Braidwood Stations ML20199E6371998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Byron Station,Units 1 & 2.With ML20202F6021998-12-31031 December 1998 Cycle 9 COLR in ITS Format & W(Z) Function ML20196K6731998-12-31031 December 1998 10CFR50.59 Summary Rept for 1998 ML20207H7731998-11-30030 November 1998 Rev 0 to WCAP-15125, Evaluation of Pressurized Thermal Shock for Byron,Unit 1 ML20207H8011998-11-30030 November 1998 Rev 0 to WCAP-15124, Byron Unit 1 Heatup & Cooldown Limit Curves for Normal Operation ML20198D1501998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20196A4191998-11-19019 November 1998 Safety Evaluation Accepting QA TR CE-1-A,Rev 66 Re Changes in Independent & Onsite Review Organization by Creating NSRB ML20195F8321998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Byron Nuclear Power Station,Units 1 & 2.With 05000454/LER-1998-018, Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a1998-10-0909 October 1998 Corrected LER 98-018-00:on 980912,inoperable Unit 1 DG Was Noted.Caused by Low Lube Oil Pressure Condition.Immediately Entered Into Lcoar for AC Sources TS 3.8.1.1,Action a ML20207H7671998-10-0505 October 1998 Rv Weld Chemistry & Initial Rt Ndt ML20154L5501998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20197C9051998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Byron Nuclear Power Station,Units 1 & 2.With ML20151Z9651998-08-31031 August 1998 Revised MOR for Aug 1998 for Byron Nuclear Power Station. Rept Now Includes Page 9 Which Was Omitted from Previously Issued Rept ML20238F6551998-08-28028 August 1998 SE Authorizing Licensee Request for Relief NR-20,Rev 1 & NR-25,Rev 0 Re Relief from Examination Requirement of Applicable ASME BPV Code,Section XI for First ISI Interval Exams ML20237E2331998-08-21021 August 1998 Revised Pages of Section 20 of Rev 66 to CE-1-A, QA Topical Rept ML20237B3361998-08-14014 August 1998 B2R07 ISI Summary Rept,Spring 1998 Outage, 961005-980518 ML20237B4841998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Byron Nuclear Power Station Units 1 & 2 1999-09-30
[Table view] |
Text
.. _ . . _ _ . - .- - _ _ -. - . - _ - _ _ - - _ _ _ . - - . . _ - _ . - - - _ _ .- _ _ _ - _ _ _ _ _ _ _ - - _ _ . _ _ - - .
o.
[l I
/l
- I. Monthly Reoort for Byron Unit 1 for the month of' January 1989 A. Summary of Operatino Experience for Unit 1 J
r The unit began this reporting period in Mode 1 (Power Operation)'at approxime sly 100% power. The unit operated at power levels of up to approximately 100% power until 01/10/89 when a power reduction was initiated to repair.a' tube leak in the 1B circulating. water box. The unit was returned to approximately 100% power on 01/11/89. The unit operated at power levels of up to approximately 100% power until 01/31/89 when a manual. reactor. trip was initiated due to a feedwater regulating valve failure. The unit remained in Mode 3 (Hot Standby) for the rest of the reporting period.
O e
R CK 05000454 PDn (0625M/0062M-3) w w :.=__- _ ~ = _ ~ _ - __. . . , __ . _ _ . . .
B. OPERATING DATA REPORT
. DOCKET NO : 050-454 UNIT Byron One DATE: 02/10/89 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 OPERATING STATUS
- 1. Reporting Period: January 1989. Gross Hours: 744 l
- 2. Currently Authorized Power Level 3411 (MWt)
Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net) '
Max Dependable Capacity: 1105 (MWe-net)
- 3. Power Level to Which Restricted (If Any): N/A
- 4. Reasons for Restriction (If Any):
THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 744 744 29617
- 6. Rx Critical Hours 730 730 22527.1
- 7. Rx Reserve Shutdown Hours 0 0 37.8
- 8. Hours Generator on Line 730 730 22086.9
- 9. Unit Reserve Shutdown Hours 'O O O
- 10. Gross Thermal Energy (MWH) 2435488 2435488 65962801
- 11. Gross Elec. Energy (MWH) 832709 832709 22145590
- 12. Net Elec. Energy (MWH) 79290s 792908 20825416
- 13. Reactor Service Factor 98.1 98.1 76.1 ..
- 14. Reactor Availability Factor 98.1 98.1 76.2
- 15. Unit Service Factor 98.1 98.1 74.6
- 16. Unit Availability Factor 98.1 98.1 74.6
- 77. Unit Capacity Factor (MDC net) 96.4 96.4 63.6
- 18. Unit Capacity Factor (DER net) 95.2 95.2 62.8
- 19. Unit Forced Outage Hrs. 14.0 14.0 1048.6
- 20. Unit Forced Outage Rate 1.9 1.9 4.5
- 21. Shutdowns Scheduled Over Next 6 Months:
- 22. If Shutdown at End of Report Period, Estimated Date of Startup: 02/01/89
- 23. Units in Test Status (Prior to Commercial Operation)t None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(0625M/0062M-4)
_ _ _ , _ _ _ _ _ . _ _ _ - - m_ _ __ __ -__. __ ____ _ _ _ _ _ __ __ _ _ _ _ _ _ _ _ _ _ _ . - - - - - - - - - -_____s
4
-C. AVERAGE' DAILY UNIT POWER LEVEL-
. ' DOCKET NO.f. 050-454' UNIT: Byron One' DATE: 02/10/B9 COMPILED.BY: D. J.-Spitzer TELEPHONE: (815)234-5441-x2023 MONT : January, 1989 DAY AVERAGE DAILY POWER LEVEL .
(MWe-Net)
- 1. 1087 MW 16. 1102 MW
- 2. 1070 MW 17. 1104 MW
- 3. 1099 MW 18. 1107'MW
- 4. 1099 MW 19. 1109 MW
- 5. 1098 MW 20. 1104 MW 6, 1100 MW 21. 1091 MW
- 7. 1087 MW 22. 1091 MW
- 8. 1087 MW 23. 1104 MW 9, 1075 MW 24. 1109 MW
- 10. 814 MW 25. 1111 MW
- 11. 1023 MW 26, 1114 MW
- 12. 1106 MW 27, 1105 MW 13, 1104 MW 28. 1107 MW .
- 14. 1092 MW 29. 1106 MW O 15. 1074 MW 30. 1105 MW E
art b 31. 441 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day j in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(0625M/0062M-t)
R l i
t a n F e
v k 0
_ e a3 r
e5
_ P L W F
o e1 t b ue n T v )
o l 1
f f et U
t caneF
n e
n 0 o 3 p 5 m d u W . a a S
N C o F rm o 1 cadL O S re I c ud T l l S ne C m aa i c r U e d u u ot ue D t o nnt ndh E) s h a a uoet R 1 y WW t MMA CR O
/ S CF e - - - - - -
ST M 1 2 3 4 5 9 NI WN r OU e D( b T m U u H N S r R o T E r I L r N E U n r n d i r eo n o mehi o h d pt t i t A- -OO c t e - i ga M 5 2 F GH rnn tii n s nm o et eia s r s R ax a ue rE e l T yT R AA i gr e s
ar nor s F oit on 9 r 0 l at e 8 u pt el ac 9 o 4 n i n u uri 1 H 1 o uif gel s qa e e p y
_ a E MR RO&
g e - - - - -
r p R A B C DE a y u T - F n
a J * *
r D 03
e / /
P 1 1
0 0
ed c e r
R * *
- T F S rff., ii 'r?' F L _l - , !
1 i
E. UNIOUE REPORTING REQUIREMENTS (UN3T li for the month of January 1989 j
- 1. Safety / Relief valve operations for Unit One.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None l
1
- 2. Licensee generated changes to ODCM. (Y/N) >
No
- 3. Indications of failed fuel. (Y/N) !
i No
]
l l
(0625M/0062M-7) l 11-_-_a._ __--- - - - - _. '
F. LICENSEE E*!ENT REPORTS (UNIT 1)
The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, January 1 through January 31, 1989. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence Licensee Event Report Number Date Title of Occurrence None 4
+m e
(0625M/0062M-8)
. . - . _ _ _ ~ _ _ , _ .-_ = _ . ~ - _ - -
KI. Monthly Report for Byron Unit 2 for the month of January 1989 A- Summary of ODeratina Experience for Unit 2 The unit began this reporting period in Mode 1 (Power Operation) at approximately 34% power. The unit continued it's coastdown until 0021 on 01/07/89 when the unit was taken off line for the first refueling outage. The unit was cooled down and entered Mode 6 (Refueling) at 0800 on 01/16/89. The unit remained in Mode 6 for the rest of the reporting period.
m e
i (0625M/0062M-9)
- *.-..a ~ . _ . + ._ '2._ ~ .n._ ,t~...._2... _ w _....mu.._._.n_-._ .--'---_st'LxJ-._~
B. OPERATING DATA REPORT DOCKET NO.: 050-455 UNIT: Byron Two-DATE: 02/10/89 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 OPERATING STATUS
- 1. Reporting Period: January 1989. Gross Hours 744
- 2. Currently Authorized Power Level 3411 (MWt)
Design Electrical Rating: 1175 (MWe-gross) ;
Design Electrical Rating: 1120 (MWe-net) '
Max Dependable Capacity: 1105 (MWe-net)
- 3. Power Level to Which Restricted (If Any): N/A
- 4. Reasons for Restriction (If Any):
THIS MONTH YR TO DATE CUMULATIVE *
- 5. Report Period Hrs. 744 744 12721
- 6. Rx Critical Hours- 144.3 144.3 11149.5
- 7. Rx Reserve Shutdown Hours 0 0 0
- 8. Hours Generator on Line 144.3 144.3 10845.5
- 9. Unit Reserve Shutdown Hours 0 0 0
- 10. Gross Thermal Energy (MWH) 156411 156411 26981828
- 11. Gross Elec. Energy (MWH) 48706 48706 8946623
- 12. Net Elec. Energy (MWH) 36114 36114 8364940
- 13. Reactor Service Factor 19.4 19.4 87.6
- 14. Reactor Availability Factor 19.4 19.4 87.6
- 15. Unit Service Factor 19.4 19.4 85.3
- 16. Unit Availability Facter 19.4 19.4 85.3
- 17. Unit Capacity Factor (MDC net) 4.4 4.4 60.0
- 18. Unit Capacity Factor (DER net) 4.3 4.3 58.7 l
- 19. Unit Forced Outage Hrs. - 0 0 462.6
- 20. Unit Forced Outage Rate 0 0 4.1
- 21. Shutdowns Scheduled Over Next 6 Months- i
- 22. If Shutdown at End of Report Period, Estimated Date of Startup: 03/10/89
- 23. Units in Test Status (Prior to Commercial Operation): None l
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(0625M/0062M-10)
_ - -__ ,_ - .- ~_~ n
C. AS!ERAGE DAILY UNIT POWER LEifEL DOCKET NO.: 050-455 UNIT: Byron Two DATE: 02/10/89 COMPILED BY: D. J. Spitzer TELEPHONE: (815)234-5441 x2023 MONTH: January, 1989
. DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
- 1. 318 MW 16. -10 MW
- 2. 312 MW 17. -10 MW
- 3. 309 MW 18. -10 MW
- 4. 309 MW 19. -10 MW
- 5. 290 MW 20. -10 MW
- 6. 253 MW 21. -11 MW
- 7. -21 MW 22. -11 MW
- 8. -19 MW 23. -9 MW
- 9. -17 MW 24. -8 MW
- 10. -16 MW 25. -8 MW i
- 11. -13 MW 26. -7 MW l
~
- 12. -11 MW 27. -7 MW
- 13. -11 MW 28. -7 MW
- 14. -10 MW 29. -8 MW
- 15. -10 MW 30. -8 MW i
- 31. -16 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(0625M/0062M-11) e i b m_m._ __. _ m e m. c- _-._ u - m, __m- __ > - - - _ _ . . -- m. ..- - -. _ -- - . - - - _ m--- - - -j
_ c e
R t
n e ~
v e
r P
)
o
_ 1
_ t t 6
i n
U m d a a S
N t
n rm o cadL O e S r e I n cud T o l l S ne C p aa i c r U m d uuot ue D o o nnt ndh E) C h aauoet R2 t MMACR O
/ m e - - - - - -
S T e M 1 2 3 4 5 9 NI t WN s OU y D( S T
U r H e S b r n
o T m r I N r N E U R n r n E i r eo n L mehi o d pt t i d AOO c t o - - - i ga h . F GH r nn t 1 tii e s nm M et ei a r s R a x n ue rE o l T yT s i gr e a C ar nor s e F oit on 9 R 8
l at e pt el ac 9 s 7 n i. nu uri 1 r o nif gel u 9 s qaeep o 9 a E MR R O&
y H 5 e - - - - -
r R ABCDE a g u g S n y a T J * *
r a 0
e D /
P 1
0
u*
ed r
R * *
, : 1 r(Vlf 4 ! P ' ; , ) > 4
L UNIOUE REPORTING REQUIREMENTS (UNIT 2) for the month of January 1989
- l 4
- 1. Safety / Relief valve operations for Unit Two.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVTEI Fone
- 2. Licensee generated changes to ODCM. (Y/N)
No
- 3. Indications of failed fuel. (Y/N)
Yes. U.T. exams indicate 6 failed fuel rods
. es O
(0625M/0062M-13)
._.a____ ___.__2_ . _ _ . _ _ .___m_n"_ ._ k _. A.. _ ._ __ _ _ _ _ _ _ = s___ a , a _ m m 1 0 _ * .:
. F. LICENSEE EVENT _. REPORTS (UNIT 21 The following is a tabular summary of all Licensee Event Reports for' Byron Nuclear Power Station, Unit Two, submitted during the reporting period, January 1 through January 31, 1989. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Occurrence Licensee Event __ Report Numhal DALg Iltle of Occurrence 88-012 12/15/88 Reactor Trip on Indicated Low Reactor Coolant Flow Rate.
Caused by Cleaning Flow Transmitter Vent Valve.