MONTHYEARML20210E0201999-07-16016 July 1999 Summary of 990629 Meeting with Util in Rockville,Md Re Ongoing Efforts in Planning Sf Storage Strategy,Including Licensing of Isfsi,At Plant.With Attendance List & TVA Handout ML20210D7801999-07-16016 July 1999 Summary of 990715 Meeting with TVA Re TVA Evaluation of Fee Structure Compared with Recent Actual Fees & NRC Guidance in Estimating Review Effort for Licensing Actions.List of Attendees & Matl Used in Presentation Enclosed ML20210D7601999-07-16016 July 1999 Summary of 990616 Meeting with TVA in Rockville MD to Brief Staff on Planned SG Replacement.List of Attendees & Handout Provided by TVA Encl ML20237E9811998-08-25025 August 1998 Summary of 980708 Meeting W/Tva & Framatome Cogema Fuel in Rockville,Md Re Ongoing Efforts W/Doe to Fabricate & Install Four Lead Test Assemblies in Plant,Unit 2 Core During Cycle 10 Refueling Outage in Spring of 1999.Attendance List Encl ML20216H5261997-08-26026 August 1997 Summary of 970822 Meeting W/Util in Rockville,Md Re Followup to Series of Conference Calls on 970418,discussing Results of Recent Steam Generator Insps at Sequoyah Unit 1.List of Attendees,Handouts & Staff Questions Encl ML20140B4701997-06-0404 June 1997 Summary of 970530 Meeting W/Tva in Rockville,Md to Discuss Status of Thermo-Lag Fire Barrier Corrective Action Program at Plant & Schedule for Completion of Program.W/Attendance List & TVA Handout ML20140G5621997-05-0808 May 1997 Summary of 970227 Meeting W/Tva in Rockville,Md to Discuss Sequoyah Conversion to Framatome Cogema Fuel.List of Attendees Encl ML20134J7451996-11-0808 November 1996 Summary of 961104 Meeting W/Tva in Rockville,Md Re Status of Thermo-Lag Fire Barrier Upgrades at Plant.List of Attendees & Copies of Handouts Encl ML20129H5211996-10-29029 October 1996 Summary of Operating Reactors Events Meeting 96-13 on 961023,informing Senior Managers from Ofcs of Commission,Oe, NRR & Regional Ofcs of Selected Events That Occurred Since Last Briefing ML20217D1931994-03-0707 March 1994 Summary of Sequoyah Restart Panel 940303 Meeting in Region II Ofc Re Status of NRC & Licensee Activities for Restart of Unit 1.Meeting Minutes & Unit 1 Restart Action Plan Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20056H5721993-08-0505 August 1993 Summary of Operating Reactors Events Meeting 93-28 on 930728 ML20217D2111993-06-16016 June 1993 Summary of Sequoyah Restart Panel 930614 Meeting in Region II Ofc Re Plant Restart & Listed Items.List of Attendees & Checklists Encl.Next Meeting Will Be Held on 930622 ML20127D1321993-01-12012 January 1993 Summary of Operating Reactors Events Meeting 93-01 on 930106 ML20058J8621990-11-27027 November 1990 Summary of 901005 Meeting W/Util in Rockville,Md Re Cable Conduit Testing Program.Viewgraphs & Attendee List Encl ML20058K0311990-11-23023 November 1990 Summary of Operating Reactors Events Meeting 90-28 on 901114 Re Reactor Scrams for Wk Ending 901111.Attendees Listed ML20062C8111990-10-16016 October 1990 Summary of Operating Reactors Events Meeting 90-25 on 901010.List of Attendees,Reactor Scram Statistics & Tabulation of Events Encl ML20059N2091990-09-21021 September 1990 Summary of 900919 Operating Reactors Events Meeting 90-023 to Discuss Significant Elements ML20059D8121990-09-0505 September 1990 Summary of 900817 Meeting W/Util in Rockville,Md Re Schedules of Certain Mods Committed for Completion in Unit 2 Cycle 4 Refueling Outage.Engineeering for Unit 2 Will Be Completed Before Restart from Outage ML20056B4101990-08-20020 August 1990 Summary of 900723 Meeting W/Util in Rockville,Md Re Plant Cable/Conduit Testing Program for safety-related Cable.List of Attendees,Tva & NRR Handouts & Transcript of Meeting Encl ML20055E2081990-07-0505 July 1990 Summary of 900531 Meeting W/Tva in Rockville,Md Re Plant safety-related Cable Inside Containment.List of Attendees, & Handouts Presented at Meeting Encl ML20246J8031989-07-12012 July 1989 Summary of 890609 Meeting W/Util in Rockville,Md Re Dissolution of Engineering Assurance Organization.List of Meeting Attendees,Util Handout,Agenda & Transcript Encl ML20245F9761989-06-22022 June 1989 Summary of 890614 Meeting W/Util & Westinghouse in Rockville,Md Re Future Work for Facility Cycle 4 Refueling Outage ML20247M1001989-05-26026 May 1989 Summary of 890511 Meeting W/Util in Rockville,Md Re Performance of Best Estimate Calculations for App K Analyses.Proposed Plan for LOCA Analyses,Meeting Handouts & List of Attendees Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20155A8081988-09-29029 September 1988 Summary of 880915 Meeting W/Util in Rockville,Md Re Microbiological Influenced Corrosion Program at Plant.List of Attendees & Viewgraphs Encl ML20154M9231988-09-21021 September 1988 Summary of 880913 Meeting W/Util at Site Re Unit 2 Shutdown Margin & Unit 1 Restart Readiness,Per Insp Repts 50-327/88-35 & 50-328/88-35.List of Attendees & Related Info Encl ML20154H4341988-09-16016 September 1988 Summary of 880908 Meeting W/Util in Rockville,Md Re Changes to Conditions Adverse to Quality Program.List of Attendees Encl ML20206B1961988-07-29029 July 1988 Summary of ACRS Subcommittee for TVA Organizational Issues 880722 Meeting in Washington,Dc Re Generic Lessons Learned from NRC Review of Util Concerning Restart of Facility ML20153A8371988-07-0101 July 1988 Summary of 880622 Meeting W/Util in Rockville,Md Re TVA Commitments on Facility.List of Attendees & Util Handout Encl ML20150E2321988-06-21021 June 1988 Summary of 880613 Meeting W/Util to Discuss Restart of Facility in Light of Recent Scrams from Power.Transcript of Meeting Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20154A4061988-05-0404 May 1988 Summary of 880414 Meeting W/Util in Rockville,Md Re Differences Between Units 1 & 2 Nuclear Performance Plan. List of Attendees & Licensee Handout Encl ML20151D2701988-03-12012 March 1988 Summary of ACRS Subcommittee on TVA Organizational Issues Meeting on 880202-03 in Chattanooga,Tn Re Review of TVA Mgt Reorganization & Issues Re Restart of Unit 2 ML20149M6071988-02-22022 February 1988 Summary of 880211 Meeting W/Util Re Load Sequencing of Plant Diesel Generators.Attendance List & Handout Matl Used During Meeting Encl ML20148Q0801988-01-21021 January 1988 Summary of Operating Reactors Events Meeting 88-03 on 880119.List of Events & Summaries of Presented Events & 1988 Scrams Encl ML20195J5251988-01-21021 January 1988 Summary of 880120 Meeting Between Commissioner Bernthal & Admiral White of TVA Re Util Request to Retain Ofc of Special Projects as Overseer of Plants After Sequoyah 1 Restart & Invitation to Bernthal to Tour Sequoyah Plant ML20195J6011987-12-0303 December 1987 Summary of ACRS Subcommittee TVA Organizational Issues 871004 Meeting W/Nrc & Util in Washington,Dc Re Actions Being Taken on Plant Restart Issues ML20236X4741987-12-0202 December 1987 Summary of 871124 Meeting W/Util in Bethesda,Md Re Results of Testing of Silicone Rubber Insulated Cables for Unit 2. Transcript of Meeting Encl ML20236K8951987-11-30030 November 1987 Trip Rept of 871028-30 Site Visit to Gather Info from Files to Facilitate Updating Sims Database ML20235B2261987-09-15015 September 1987 Summary of 870910 Meeting W/Util in Knoxville,Tn Re Status of Cable Test Program.List of Attendees & Transcript Encl ML20235B1271987-09-15015 September 1987 Summary of 870911 Meeting W/Tva Re NRC Staff Presentation to TVA Findings from Integrated Design Insp.List of Attendees & Meeting Transcription Encl ML20239A6691987-09-0404 September 1987 Summary of 870901 Meeting W/Util,Bechtel & S&W in Bethesda, MD Re Criteria for Pipe Supports.List of Attendees,Handouts & SQN-DC-V-24.2 Supports for Rigorously Analyzed Category I Piping Encl ML20237G7631987-08-26026 August 1987 Summary of 870819 & 20 Meetings W/Util at Facility Re Status of Technical Issues Requiring Resolution Prior to Restart. List of Attendees,Agenda & Handouts Encl ML20235X0921987-07-16016 July 1987 Summary of 870713 Meeting W/Util,Franklin Research Ctr, Sandia,S&W & NUS Corp in Bethesda,Md Re Cable Testing Program.Util Proposing Revised Cable Testing Program to Test 380 Cables.Attendees List & Transcript Encl ML20234B9831987-06-26026 June 1987 Summary of 870619 Meeting W/Util in Bethesda,Md Re Util Proposed Program for Regeneration of Nonretrievable Pipe Support Calculations & Verification of Technical Adequacy of Existing Calculations.Attendees List & Util Handout Encl ML20216D0121987-06-19019 June 1987 Summary of 870601 Meeting in Bethesda,Md to Discuss Special Employee Concern Program.Attendee List & Handouts Encl ML20215A1881987-06-0909 June 1987 Trip Rept of 870520-22 Visit to Regional Ofc & Site to Discuss Ofc Procedures for Processing of Util Allegations & Status of Essential Elements of Restart Program ML20214H8681987-05-18018 May 1987 Summary of 870326 Meeting W/Util Re Diesel Generator Sequencing Calculations.Util Response to Questions in Form of Rev 5 to Calculations,Engineering Change Notification, List of Attendees & Other Related Documents Encl 1999-07-16
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20210D7801999-07-16016 July 1999 Summary of 990715 Meeting with TVA Re TVA Evaluation of Fee Structure Compared with Recent Actual Fees & NRC Guidance in Estimating Review Effort for Licensing Actions.List of Attendees & Matl Used in Presentation Enclosed ML20210D7601999-07-16016 July 1999 Summary of 990616 Meeting with TVA in Rockville MD to Brief Staff on Planned SG Replacement.List of Attendees & Handout Provided by TVA Encl ML20210E0201999-07-16016 July 1999 Summary of 990629 Meeting with Util in Rockville,Md Re Ongoing Efforts in Planning Sf Storage Strategy,Including Licensing of Isfsi,At Plant.With Attendance List & TVA Handout ML20237E9811998-08-25025 August 1998 Summary of 980708 Meeting W/Tva & Framatome Cogema Fuel in Rockville,Md Re Ongoing Efforts W/Doe to Fabricate & Install Four Lead Test Assemblies in Plant,Unit 2 Core During Cycle 10 Refueling Outage in Spring of 1999.Attendance List Encl ML20216H5261997-08-26026 August 1997 Summary of 970822 Meeting W/Util in Rockville,Md Re Followup to Series of Conference Calls on 970418,discussing Results of Recent Steam Generator Insps at Sequoyah Unit 1.List of Attendees,Handouts & Staff Questions Encl ML20140B4701997-06-0404 June 1997 Summary of 970530 Meeting W/Tva in Rockville,Md to Discuss Status of Thermo-Lag Fire Barrier Corrective Action Program at Plant & Schedule for Completion of Program.W/Attendance List & TVA Handout ML20140G5621997-05-0808 May 1997 Summary of 970227 Meeting W/Tva in Rockville,Md to Discuss Sequoyah Conversion to Framatome Cogema Fuel.List of Attendees Encl ML20134J7451996-11-0808 November 1996 Summary of 961104 Meeting W/Tva in Rockville,Md Re Status of Thermo-Lag Fire Barrier Upgrades at Plant.List of Attendees & Copies of Handouts Encl ML20129H5211996-10-29029 October 1996 Summary of Operating Reactors Events Meeting 96-13 on 961023,informing Senior Managers from Ofcs of Commission,Oe, NRR & Regional Ofcs of Selected Events That Occurred Since Last Briefing ML20217D1931994-03-0707 March 1994 Summary of Sequoyah Restart Panel 940303 Meeting in Region II Ofc Re Status of NRC & Licensee Activities for Restart of Unit 1.Meeting Minutes & Unit 1 Restart Action Plan Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20056H5721993-08-0505 August 1993 Summary of Operating Reactors Events Meeting 93-28 on 930728 ML20217D2111993-06-16016 June 1993 Summary of Sequoyah Restart Panel 930614 Meeting in Region II Ofc Re Plant Restart & Listed Items.List of Attendees & Checklists Encl.Next Meeting Will Be Held on 930622 ML20127D1321993-01-12012 January 1993 Summary of Operating Reactors Events Meeting 93-01 on 930106 ML20058J8621990-11-27027 November 1990 Summary of 901005 Meeting W/Util in Rockville,Md Re Cable Conduit Testing Program.Viewgraphs & Attendee List Encl ML20058K0311990-11-23023 November 1990 Summary of Operating Reactors Events Meeting 90-28 on 901114 Re Reactor Scrams for Wk Ending 901111.Attendees Listed ML20062C8111990-10-16016 October 1990 Summary of Operating Reactors Events Meeting 90-25 on 901010.List of Attendees,Reactor Scram Statistics & Tabulation of Events Encl ML20059N2091990-09-21021 September 1990 Summary of 900919 Operating Reactors Events Meeting 90-023 to Discuss Significant Elements ML20059D8121990-09-0505 September 1990 Summary of 900817 Meeting W/Util in Rockville,Md Re Schedules of Certain Mods Committed for Completion in Unit 2 Cycle 4 Refueling Outage.Engineeering for Unit 2 Will Be Completed Before Restart from Outage ML20056B4101990-08-20020 August 1990 Summary of 900723 Meeting W/Util in Rockville,Md Re Plant Cable/Conduit Testing Program for safety-related Cable.List of Attendees,Tva & NRR Handouts & Transcript of Meeting Encl ML20055E2081990-07-0505 July 1990 Summary of 900531 Meeting W/Tva in Rockville,Md Re Plant safety-related Cable Inside Containment.List of Attendees, & Handouts Presented at Meeting Encl ML20246J8031989-07-12012 July 1989 Summary of 890609 Meeting W/Util in Rockville,Md Re Dissolution of Engineering Assurance Organization.List of Meeting Attendees,Util Handout,Agenda & Transcript Encl ML20245F9761989-06-22022 June 1989 Summary of 890614 Meeting W/Util & Westinghouse in Rockville,Md Re Future Work for Facility Cycle 4 Refueling Outage ML20247M1001989-05-26026 May 1989 Summary of 890511 Meeting W/Util in Rockville,Md Re Performance of Best Estimate Calculations for App K Analyses.Proposed Plan for LOCA Analyses,Meeting Handouts & List of Attendees Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20155A8081988-09-29029 September 1988 Summary of 880915 Meeting W/Util in Rockville,Md Re Microbiological Influenced Corrosion Program at Plant.List of Attendees & Viewgraphs Encl ML20154M9231988-09-21021 September 1988 Summary of 880913 Meeting W/Util at Site Re Unit 2 Shutdown Margin & Unit 1 Restart Readiness,Per Insp Repts 50-327/88-35 & 50-328/88-35.List of Attendees & Related Info Encl ML20154H4341988-09-16016 September 1988 Summary of 880908 Meeting W/Util in Rockville,Md Re Changes to Conditions Adverse to Quality Program.List of Attendees Encl ML20206B1961988-07-29029 July 1988 Summary of ACRS Subcommittee for TVA Organizational Issues 880722 Meeting in Washington,Dc Re Generic Lessons Learned from NRC Review of Util Concerning Restart of Facility ML20153A8371988-07-0101 July 1988 Summary of 880622 Meeting W/Util in Rockville,Md Re TVA Commitments on Facility.List of Attendees & Util Handout Encl ML20150E2321988-06-21021 June 1988 Summary of 880613 Meeting W/Util to Discuss Restart of Facility in Light of Recent Scrams from Power.Transcript of Meeting Encl ML20196A9201988-06-17017 June 1988 Summary of Operating Reactors Events Meeting 88-24 on 880614.Two Significant Events Identified for Input to NRC Performance Indicator Program.No Events Suggested for long-term Followup.List of Attendees Encl ML20154A4061988-05-0404 May 1988 Summary of 880414 Meeting W/Util in Rockville,Md Re Differences Between Units 1 & 2 Nuclear Performance Plan. List of Attendees & Licensee Handout Encl ML20151D2701988-03-12012 March 1988 Summary of ACRS Subcommittee on TVA Organizational Issues Meeting on 880202-03 in Chattanooga,Tn Re Review of TVA Mgt Reorganization & Issues Re Restart of Unit 2 ML20149M6071988-02-22022 February 1988 Summary of 880211 Meeting W/Util Re Load Sequencing of Plant Diesel Generators.Attendance List & Handout Matl Used During Meeting Encl ML20148Q0801988-01-21021 January 1988 Summary of Operating Reactors Events Meeting 88-03 on 880119.List of Events & Summaries of Presented Events & 1988 Scrams Encl ML20195J5251988-01-21021 January 1988 Summary of 880120 Meeting Between Commissioner Bernthal & Admiral White of TVA Re Util Request to Retain Ofc of Special Projects as Overseer of Plants After Sequoyah 1 Restart & Invitation to Bernthal to Tour Sequoyah Plant ML20195J6011987-12-0303 December 1987 Summary of ACRS Subcommittee TVA Organizational Issues 871004 Meeting W/Nrc & Util in Washington,Dc Re Actions Being Taken on Plant Restart Issues ML20236X4741987-12-0202 December 1987 Summary of 871124 Meeting W/Util in Bethesda,Md Re Results of Testing of Silicone Rubber Insulated Cables for Unit 2. Transcript of Meeting Encl ML20235B1271987-09-15015 September 1987 Summary of 870911 Meeting W/Tva Re NRC Staff Presentation to TVA Findings from Integrated Design Insp.List of Attendees & Meeting Transcription Encl ML20235B2261987-09-15015 September 1987 Summary of 870910 Meeting W/Util in Knoxville,Tn Re Status of Cable Test Program.List of Attendees & Transcript Encl ML20239A6691987-09-0404 September 1987 Summary of 870901 Meeting W/Util,Bechtel & S&W in Bethesda, MD Re Criteria for Pipe Supports.List of Attendees,Handouts & SQN-DC-V-24.2 Supports for Rigorously Analyzed Category I Piping Encl ML20237G7631987-08-26026 August 1987 Summary of 870819 & 20 Meetings W/Util at Facility Re Status of Technical Issues Requiring Resolution Prior to Restart. List of Attendees,Agenda & Handouts Encl ML20235X0921987-07-16016 July 1987 Summary of 870713 Meeting W/Util,Franklin Research Ctr, Sandia,S&W & NUS Corp in Bethesda,Md Re Cable Testing Program.Util Proposing Revised Cable Testing Program to Test 380 Cables.Attendees List & Transcript Encl ML20234B9831987-06-26026 June 1987 Summary of 870619 Meeting W/Util in Bethesda,Md Re Util Proposed Program for Regeneration of Nonretrievable Pipe Support Calculations & Verification of Technical Adequacy of Existing Calculations.Attendees List & Util Handout Encl ML20216D0121987-06-19019 June 1987 Summary of 870601 Meeting in Bethesda,Md to Discuss Special Employee Concern Program.Attendee List & Handouts Encl ML20214H8681987-05-18018 May 1987 Summary of 870326 Meeting W/Util Re Diesel Generator Sequencing Calculations.Util Response to Questions in Form of Rev 5 to Calculations,Engineering Change Notification, List of Attendees & Other Related Documents Encl ML20214L5911987-05-18018 May 1987 Summary of 870420 Meeting W/Tva in Chattanooga,Tn Re Review of Rev 4 to Vol 1 of TVA Nuclear Performance Plan & Status of Vol II of Plan.Agenda,Transcript of Meeting,List of Attendees & Viewgraphs Encl ML20214F4431987-05-0808 May 1987 Summary of 870410 Meeting W/Tva in Bethesda,Md Re Status of Plant Restart Issues.Meeting Transcript & Related Documentation Encl 1999-07-16
[Table view] |
Text
_ _ _ _ - _ _ _ _ _ _ _ _ _ .
September 15, 1987 Docket Nos: '50-327/328 LICENSEE: Tennessee Valley Authority FACILITIES: Sequoyah Nuclear Plant, Units 1 and 2
SUBJECT:
MINUTES OF THE SEPTEMBER 10, 1987 MEETING WITH TENNESSEE VALLEY AUTHORITY On September 10, 1987, Mr. J. G. Keppler and staff members of the Office of Special Projects, NRC, met with Mr. S. A. White and representatives of the Tennessee Valley Authority (TVA). The purpose of the meeting was for the TVA to present to the NRC the status of their cable test program. Enclosure 1 is a list of attendees. Enclosure 2 is letter from the TVA to the NRC containing a preliminary 10 CFR 21 report on silicon rubber-insulated cables. The meeting transcription, which includes a copy of the meeting handouts, is provided as Enclosure 3.
If you should have any questions regarding the information provided, please contact me at (301) 492-8845.
I Original signed by:
M. B. Fields, Project Manager Sequoych Restart Branch TVA Projects Division Office of Special _ Projects Enclosures
- 1. List of Attendees
- 2. 10 CFR 21 Letter
- 3. Transcription and Handouts i
l l
8709240027 870915 l
(DR ADocK 05000327 PDR l
1 l
9
\
TV OSP/PM TVA:AD/P MF elds:pw JZwolinski 7 // f/87 ?/@/87 l
. .a - ~!
ss neau
'A j%, UNITED STATES
! g NUCLEAR REGULATORY COMMISSION j 5 j WASHINGTON. D. C. 20555
,,,.. September 15, 1987
] l J
l Docket Nes: 50-327/328
- i l
LICENSEE: Tennessee Valley Authority ,
i FACILITIES: Sequoyah Nuclear Plant, Units 1 and 2
SUBJECT:
MINUTES OF THE SEPTEMBER 10, 1987 MEETING WITH TENNESSEE i
VALLEY AUTHORITY On September 10, 1987, Mr. J. G. Keppler and staff members of the' Office of- 3 Special Projects, NRC, met with Mr. S. A. White and representatives of the Tennessee Valley Authority (TVA). The purpose of the meeting was for the TVA to present to the NRC the status of-their cable test program. Enclosure 1 is J a list of attendees. Enclosure 2 is letter from the TVA to the NRC containing !
a prelimin6ry 10 CFR 21 report on silicon rubber-insulated cables. The i meeting transcription, which includes a copy of the meeting handouts, is i provided as Enclosure 3. :
If you should have any questions regarding the information provided, please contact me at (301) 492-8845.
k ..
h :
M. B. Fields, Project Manager-Sequoyah Restart Branch TVA Projects Division Office of Special Projects i Enclosures
- 1. List of Attendees
- 2. 10 CFR 21 Letter .;
- 3. Transcription and Handouts
)
a
H i
Mr. S..A. White Tennessee Valley Authority Sequoyah Nuclear Plant CC:
General Counsel Regional Administrator, Region II Tennessee Valley Authority U.S. Nuclear Regulatory Commission 400 West Summit Hill Drive 101 Marietta Street, N.W.
E11 B33 Atlanta, Georgia 30323 Knoxville, Tennessee 37902 Resident Insoector/Sequoyah NP .
Mr. R. L. Gridley c/o U.S. Nuclear Regulatory Commission ,
i Tennessee Valley Authority 2600 Igou Ferry Road l L 5N 157B Lookout Place Soddy Daisy, Tennessce 37379 Chattanooga, Tennessee 37402-2801 Mr. Richard King Mr. H. L. Abercrombie c/o U.S. GA0 l Tennessee Valley Authority 1111 North Shore Drive l
> Sequoyah Nuclear Plant Suite 225, Box 194 I P.O. Box 2000 Knoxville, Tennessee 37919 'l Soddy Daisy, Tennessee 37379 '
Tennessee Department of Mr. M. R. Harding Public Health Tennessee Valley Authority ATTN: Director, Bureau of Sequoyah Nuclear Plant Environmental Health Services P.O. Box 2000 Cordell Hull Building Soddy Daisy, Tennessee 37379 Nashville, Tennessee 37219 Mr. D. L. Williams Fr. Michael H. Mobley, Director Tennessee Valley Authority Division of Radiological Health 400 West Summit Hill Drive T.E.R.R.A. Building I W10 B85 150 9th Avenue North Knoxville, Tennessee 37902 Nashville, Tennessee 37203 County Judge Mr. S. A. White Hamilton County Courthouse Manager of Nuclear Power Chattanooga, Tennessee 37402 Tennessee Valley Authority 6N 38A Lookout Place l 1101 Market Street l
Chattanooga, Tennessee 37402-2801 l .g:
1
ENCLOSURE 1 q TVA/NRC MEETING 3 CABLE TEST PROGRAM September 10,. 19B7 Name Organization
)
R. Luther ' Consultant-A. R. Fitzpatrick Stone & Webster P. S. Cardello '
Newtown Assoc. 1 Joel Kitchens ; Bechtel )
Barry Kimsey SQN TVA Regulatory Licensing l Timothy M. Shea 'TVA-EBB (SWEC)
Kent Brown TVA-EEB
, G. T. Hall . TVA-SQN-EWGR l R. G. McCoppin UE&C - Cetaract J. D. Dunlap TVA-50N-DPS0 4 M. R. Harding TVA-SQN-DNSL
- 0. J. Mavro Stone & Webster W. Wegner ,
BETA Sherry Johnson TVA Darrell Eisenhut NUS M. T. Tormey TVA Engineering Assurance Carol Ayers TVA 0NP B. Charlson TVA-CNP J. Blankenship TVA-ONP ')
D. E. McCloud TVA-OND-DNSL Patrick Willard Knoxville Journal Morris G. Herndon TVA GM Office I
Stew Ebneter NRC/OSP/TVA M. Fields NRC/OSP l G. Toman FRC
'l J. B. Gardner Consultant /FRC E. F. Goodwin NRC/OSP W. A..Thue Consultatn/FRC .
H. C. Garg NRC/OSP Joe Rutberg .NRC/0GC Janet Kelly NRC/0SP Jiin Clifford i NRC/OSP John Zwolir..ki NRC/OSP Jim Keppler NRC/OSP- 1 Jcne Aye1 rad NRC/OSP l Angelo Marinos NRC/OSP i Steve Hedgepetz NUS Corp Peter V. Judd NUS Corp Katherine Chenault Oversight & Investigation Consnittee Richard King Oversight & Investigation Committee Johnny Clark Oversight & Investigation Committee 1 M. C. Brickey TVA-DNE Gene Imbro NRC/NRR R. E. Shewmaker NRC/OSP ;
1'
i i
Name Organization' j i
j
-Ken Clark NRC OGP/PA 1 NRC-Brian Grimes l Gary Zech. NRC/OSP R. J. McMahow TVA/UBN TVA Richard Levi . i Douglas R. Nichols TVA TVA-BFN Site Licensing l Art Alford Kay Whittenburg TVA-0WP l
i 1
E 1
1 l
I
I
- So - 39
-DISTIRUBTION FOR MEETING
SUMMARY
DATED: September 15,.1987 Facility: Sequoyah Nuclear Plant, Units 1 and 2*
w/ enclosures w/o enclosures i
iDocket? File, EMcKenna NRC PDR MFields ')
Local PDR Projects Rdg.
JKeppler/JAxelrad SQN File SEbneter. JClifford SRichardson JDonohew JZwolinski EGoodwin BDLiaw CJamerson ,
TRote11a FMiraglia .J AMarinos JPartlow OGC-Bethesda EJordan ,
l L HGarg j GZech FMcCoy
( ACRS(10) 7 Hon. M. Lloyd**
Hon. J. Cooper **
( Hon. A. Gore **
Dr. Henry Myers**
Mr. R. King, GA0**
CMiller H-1149 JHeltemes, Jr. H-1149 l CAder H-1149 JMilhoan H-1149 ,
PGwynn H-1149 FCombs H-1159 TRehm TVA-Bethesda
}
i j
- Copies sent to person on facility service list
- Advance copy of transcript sent under separate cover ;
l i
(
i TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 6N 38A Lookout Place I September 10, 1987 l
J Mr. James G. Keppler. Director '
Office of Special Projects 1 U.S. Nuclear Regulatory Commission )
4350 East-West Highwsy. )
EW 322 1 Bethesda, Maryland 20814 )
t J
['
Dear Mr. Keppler:
i SEQUOYAH NUCLEAR PLANT UNITS 1 AND 2 - DOCKET NOS. 50-327 and 50-328 - i FACILITY OPERATING LICENSES DPR 72 AND 77 - PRELIMINARY 10 CFR 21 REPORT ON ,. j SILICONE RUBBER-INSULATED CABLES '
I l'
TVA has conducted special high-potential withstand tests on a number of i installed No. 14 silicone rubber-insulated single conductor cables. As of !
this date, 9 of 66 tests of cables have not met the environmental !
qualification acceptance criteria of 240 volts per all of insulation. Cables from two of the three vendors that supplied this type of cable to TVA are involved, i
l TVA has conducted laboratory tests on' cables from each vendor and has been unable to determine the nature or cause of this condition.- However, these ;
laboratory t'ests did indicate that significant decreases in insulation wall '
thickness result from lower than espected impact forces. The level of impact force which results in such decreases may be caused by damage occurring during manufacturing, shipping, or handling. Cables from all.three vendors were j tested'in the laboratory and evidenced similar reductions in wall thickness.
1
-As'a result, a determination'has been made that this problem is reportable.
pursuant to the requirements of 10 CFR 21. As you know. I received a September 4.'1987 briefing on the potential problem. Subsequently I gave you- i a verbal report by telephone that day.. In addition, on September 5, 1987, R. L. Gridley of my staff gave a verbal report by telephone to Dr. J. Nelson-Grace, Regional Administrator of NRC Region II. ,
q
~
, . . A6 3 3j')Y J*
,i,,W h 4
m bnn h- A- -
.e
-2 Mr. James G. Keppler September 10, 1987 The enclosed preliminary report contains additional information about this matter. An extension to September 10, 1987 for submittal of.this report was discussed with and approved by you on September 9, 1987. T7A is providing this report before completion of further tests and evaluation in order to keep the NRC fully apprised of the situation.
TVA will submit a further report upon completion of the additional tests and evaluation. i l
Very truly yours, l TENNESSEE VALLEY AUTHORITY
]
- 5. CA. A S. A. White Manager of Nuclear Power l
Enclosure cc (Enclosure): .
U.S. Nuclear Regulatory Commission i Region II j
l Attn: Dr. J. Nelson Grace Regional Administrator i 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 l j
U.S. Nuclear Regulatory Commission Region II ,
l Attn: Mr. G. G. Zech, Director of TVA Projects 101 Marietta St'., NW, Suite 2900 Atlanta, Georgia 30323
? . .
1 4
l .
i l
j
[. .
Y .
ENCLOSURE SEQUOYAH NUCLEAR PLANT PRELIMINARY REPORT SILICONE RUBBER-INSULATED CABLES i
Nature of Defect and Cause a As a result of the nonconformances of three. silicone rubber-insulated single conductor No. 14 cables identified during special high potential tests, subsequent testing was-initiated by TVA on silicone rubber-insulated cables installed at the Sequoyah Nuclear Plant (SQN). The subsequent testing identified three additional nonconformances each of AIW Corporation and Rockbestos conductors. The sample population of Anaconda conductors did not !
1
( experience any failures. TVA has now identified a total ~of 9 nonconformances out of 66 tested conductors. To date. TVA has been unable to identify a !
I definitive cause for these nonconformances. TVA has concluded that the performance of silicone rubber-insulated cables is significantly different I than expected. In addition, the performance of silicone rubber-insulated j cables is significantly different from other cables at T7A of which 923 tests ;
were just completed with no failures. ,
~
l i
TVA authorized laboratory testing of silicone rubber-insulated cables, and I this testing indicated that significant decreases in insulation wall thickness result from lower than expected impact forces. The level of impact force which results in such decreases may be within that which could possibly occur during (1) manufacturing operations following the factory high potential withstand test. (2) handling at the manufacturer. (3) shipping, (4) receipt / storage by TVA, or (5) the installation process. TVA has, however, been unable to consistently. correlate this data to the nonconformances identified.
These cables are manufactured by American Insulated Wire (AIW) Corporation, 36 Freeman Street Pawtucket, RI 02862; Anaconda-Ericsson (Continental),
P.O. Box 1863, New Haven, York, PA' 17405; and the Rockbestos Company, P.O. Drawer 1102, C7 06504.
'}
The determination that a reportable condition may exist was reached on September 4, 1987.
Estent of Safety Hazard A nonconformance of the cable at voltages below that accepted by the industry to demonstrate insulation integrity during equipment qualification testing may indicate the inability of the cable to perform its intended function under design basis accident conditions. The inability of these cables to perform as designed could create a substantial safety harard.
Silicone rubber-insulated cables are used in low voltage power and control circuits (both safety and nonsafety related) inside the reactor containment buildings of SQN units 1.and 2.
limited applications in other areas These cables of these have two also been utilized in units.
____-_______._________.__m______ _ _ _ _ _ _
e<
Number of Identical Components in'Use '
There are approximately 252 silicone rubber-insulated cables which require j qualification under the requirements of 10CFR50.49, installed inside the i containment of SQN unit 2.
the containment of SQN unit 2.It is espected that a similar number existsLinside. -l I
Location of Components The silicone rubber-insulated cables at SQN are located primarily.inside the reactor containment buildings in units 1 and 2.
utilized in limited applications in other areas ofThese thesecables have also been !
two units.
Corrective Action and Recurrence Control Taken or To Be Taken TVA will continue to evaluate silicene rubber cable. TVA will continue performing cables. high voltage withstand tests on an expanded sample of the installed This testing is intended to provide a level of confidence in the integrity of the qualification cable (i.e. commensurate with that provided during the equipment 10CFR50.49) testing' previously performed.
The results of the additional testing planned by TVA as well as those. .
previously extent of the performed problem. on installed cables will.be analyzed to determine the 9
4 0
L 9
1 !
l 1