ML20235A321

From kanterella
Jump to navigation Jump to search
Requests Extension Until 870801 to Submit Tech Spec Changes Required by 10CFR50,App H Following Capsule Withdrawal.Addl Time Needed to Allow Util & Westinghouse to Develop Curves Which Use Info from Capsule Evaluation
ML20235A321
Person / Time
Site: Callaway 
Issue date: 07/01/1987
From: Schnell D
UNION ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
ULNRC-1544, NUDOCS 8707080397
Download: ML20235A321 (2)


Text

.-

UMON' Etscauc a

'1901 Statiot S: rect. St. Louis Donald F. SchneII Wce Presioent July 1, 1987 U.S. Nuclear Regulatory Commission

-ATTN:

Document Control Desk Washington, D.C.

20555

_ Gentlemen:

ULNRC-1544 Docket Nu:nber 50-483 Callaway Plant Request For Extension Of-Technical Specification Revision Submittal

References:

ULNRC-1469 dated March 18, 1987 Transmittal of Callaway Surveillance Capsule test report Reference 1 transmitted the Callaway Surveillance Capsule test report.

In this transmittal, Union Electric projected a date of July 1, 1987 for submittal of Technical Specification Changes required by 10CFR50 Appendix H following a capsule withdrawal.

t Additional time is requested to allow Union Electric and Westinghouse to develop curves which utilize the information from the capusle evaluation and which also factor 'in the lower' leakage core designs currently associated with Cycle 2 and future cycles.

Based on this, an extension to August 1, 1987 is requested.

If you have any questions concerning this request, please contact us.

Very truly yours, n

7.

Donald F.

Schnell TEH/ mat 8707080397 870701 PDR ADOCK 05000483 p

PDR O!

/)O

</O Mailing Address: P O. Box 149, St. Lo.ns, MO 63166

m

~ ~:

I cc:

Gerald'Charnoff, Esq.

Shaw Pittman, Potts & Trowhridge e

2300 N. Street, N.W.

Washington, D.C.

20037 i

Dr. J. O. Cermak CFA, Inc.

4 Professional Drive (Suite 110)

Gaithersburg, MD 20879 W.

L.

Forney d

Division of Projecto and Resident Programs, Chief, Section 1A 1

U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road

' Glen Ellyn, Illinois 60137 Bruce Little Callaway Resident Office U.S. Nuclear Regulatory Commission-1 RR#1 Steedman, Missouri 65077 Tom Alexion (2)

Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 316 7920 Norfolk Avenue Bethesda, MD 20014 Manager, Electric Department Missouri Public Service Commission P.O. Box 360 Jefferson City, MO C5102 l

l i

o