Monthly Operating Repts for Aug 1987
ML20235A102
Person / Time
Site: Peach Bottom  
Issue date: 08/31/1987
From: Alden W, Middleton L
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8709230208
Download: ML20235A102 (13)


Text

Docket No. 50-277 Attachment to Monthly Operating Report for August, 1987 UNIT 2 REFUELING INFORMATION 1.

Name of facility:

Peach Bottom Unit 2 2.

Scheduled date for next refueling shutdown:

Reload 7 in progress 3.

Scheduled date for restart following refueling:

Indeterminate - Dependent upon satisying NRC Shutdown Order.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Yes If answer is yes, what, in general, will these be?

Technical Specifications to acconnodate reload fuel. Modifications to reactor core operating limits.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

Reload 7 Amendment submitted January 9, 1987.

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

1 None expected.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel l

storage pool:

(a) Core - 764 Fuel Assemblics, Core Offloaded During Outage (b) fuel Pool - 1462 Fuel Assemblies, 58 Fuel Rods 8.

The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:

The spent fuel pool ctorage capacity has been relicensed for 3819 fuel assemblies.

8709230200 8708311

,y

>[

PDR ADOCK 05000277

/

6, R

PDR

'ft

L Docket No. 50-277 Attachment to

),

Monthly Operating Report for August,1987 Pege 2

-UNIT 2 REFUELING INFORMATION (Continued) i 9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present1 capacity.-subsequent to the completion of the new fuel racks installation:

March,1998 (March 1995, with reserve full cora discharge) f i

j J

l Docket No. 50-278 l

Attachment to Monthly Operating Report for August, 1987 l

l UNIT 3 REFUELING INFORMATION 1.

Name of facility:

~ Peach Bottom Unit 3 2.

Scheduled date for next refueling shutdown:

October 1, 1987 (Major Pipe Replacement Outage) 3.

Scheduled date for restart following refueling:

July 9,1988 4.

Will refueling ~or resumption of operation thereaf ter require a technical specification change or other license amendment?

Yes.

If answer is yes, what, in general, will these be?

Technical Specifications to accommodate reload fuel. Modifications to reactor core operating limits.

5.

Scheduled date(s) for submitting proposed licensing action and supporting information:

1 Reload 7 License Amendment to be submitted March 11, 1988 1

6.

Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:

None expected.

i l

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:

(a) Core - 764 Fuel Assemblies (b) Fuel Pool - 1496 Fuel Assemblies, 6 Fuel Rods

Docket No. 50-278 Attachment.to i

Monthly Operating J

Report for August 1987 Page 2 UNIT 3 REFUELING INFORMATION (Continued) 8.

The present' licensed spent fuel pool storage capacity and ti.e size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel.. assemblies:

1 The. spent fuel pool storage capacity has been relicensed for 3819 fuel assemblies. This modification began on February '20,1987. - The 4

completion date for this modification has been rescheduled for -

February ?1989 to'accosanodate the Unit.3. pipe replacement outage.

9.

The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present capacity, prior to the ccenpletion of the new fuel racks installation:

March, 1993 (September, 1987, with reserve full l

core discharge)

10..The projected'date of the last refueling that can be discharged to the j

spent fuel pool ~ assuming the relicensed capacity. subsequent to the i

completion of the new fuel racks installation:

{

i March, 1999 (March, 1996, with reserve full coredischarge)

{

i l

l l

AVERAGE DAILY UNIT P0HER LEVEL DOCKET NO. 50 - 277 j.

UNIT PEACH BOTTOM UNIT 2 l

................ = _._=_____

l DATE SEPTEtDER 15,1987 I

COMPANY PHILADELPHIA ELECTRIC CONPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICEtGING SECTION IRJCLEAR SUPPORT DEPARTMENT TELEPHONE (215) 841-6374 HONTH AUGUST 1987 l

l DAY AVERAGE DAILY P0HER LEVEL DAY AVERAGE DAILY P0HER LEVEL I F54E-NET )

(MHE-NET) l 1

0 17 0

l 2

0 18 0

1 1

5 0

19 0

Q 0

20 0

l l

5 0

21 0

l G

0 2t 0

7 0

23 0

'8 0

24 0

0 0

25 0

10 0

26 0

11 0

27 0

12 0

2S 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

a

a l

AVERAGE DAILY M4IT P0HER LEVEL DOCKET No. 50 - 278

)

U4IT PEACH BOTT0H UNIT 3 DATE SEPTEMBER 15,1987 COMPANY PHILADELPHIA ELECTRIC COMPANY L. L. HIDDLETON TECHNICAL ASSISTANT i

LICENSING SECTION

'I HUCLEAR SUPPORT DEPARTMEKr TELEPHONE ( 215) 841-6374 HONTH AUGUST 1987

...= -

DK(

AVERAGE DAILY P0HER LEVEL DAY AVERAGE DAILY POHER LEVEL (PHE-NETI (MHE-NET) 1 0

17 0

2 0

18 0

3 0

19 0

0 0

20 0

5 0

21 0

}

O O

22 0

7 0

23 0

)

)

Q 0

24 0

i 9

0 25 0

10 0

26 0

11 0

27 0

h2 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

i 1

OPERATING DATA REPORT l

l t

l' DOCKET No. 50 - 277 DATE SEPTEMBER 15,1987 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. MIDDLETON TECHNICAL ASSISTANT LICENSING CECTION NUCLEAR SUPPORT DEPARTMENT TELEPH0t4E (215T 641-6!74

=...

OPERATING STATUS

1. UNIT NAMES PEACH BOTTOM Ut1IT 2 l NOTES 3 UNIT 2 REMAINED SHUTDOHN I

g i

2. REPORTItlG PERIOD:

AUGUST, 1987 l

FOR ITS SEVENTH REFUELItG

.1 l

3. LICENSED THERNAL 90HER(HNT):

3293 l

OUTAGE. THE UNIT NILL l

l l

4. NAMEPLATE RATING (CROSS NHE 18 1152 l

RENAIN SHUTDOHN IN COMPLIANCE l l

l

5. DESIGN ELECTRICAL RATING (HET HHE):

1065 l

HITH THE MARCH 31, 1987 l

l l

6. HAXIMUM DEPtNOABLE CAPACITY (GROSS HHE)* 1098 l

SHIJTD0lH ORDER.

l l

l

7. HAXIttJH DEPENDABLE CAPACITY (t<ET HHE ):

1051 l

l

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITE.83 NUtBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSI Q. P0HER LEVEL To HHICH RESTRICTED, IF ANY (NET HHE):
10. REAS0t13 FOR RESTRICTIONS, IF ANY:

THIS HotWH VR-TO-DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 5,831 115,343
12. NUMBER OF HOURS REACTOR HAS CRITICAL 0

1,729.L 743196.8

13. REACTOR RESERVE SHUT 00NN HOURS 0.0 0.0 0.0
14. HOURS GENERATOR ON-LINE 0.0 1,724.0 71,866.8
15. UNIT RESERVE SHUTDONN HOURS 0.0 0.0 0.0
10. GROSS THERHAL ENERGY GENERATED (tHH) 0 4,979,576 212,810,745
17. GROSS ELECTRICAL ENERGY GENERATED tHHH) 0 1,648,230 70,019,230
18. NET ELECTRICAL ENERGY GEt4ERATED (HHH)

-5,862 1,570,t335 67,059,655

._.......__~

PAGE 1 0F 2

OPERATING DATA REPORT (CDtRINUED)

DOCKET Ho. 50 - 277 1

i l

DATE SEPTEMBER 15,1987 1

I i

'THIS HONTH YR-TO-DATE CUTLATIVE 1

J

19. UNIT SEkVICE FACTOR 0.0 29.6 62.3.

l

20. UNIT AVAILABILITY FACTOR 0.0 29.6 62.3
21. UNIT CAPACITY FACTOR (USING HDC NET) 0.0 25.6 55.3

.=----

22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 25.3 54.6
23. UNIT FORCED OUTAGE RATE 100.0 26.6 14.0 l

1

24. SHUTD0tNS SCHEDULED OVER NEXT 6 NONTHS (TYPE, DATE, AND DURATION OF EACH):

1 REFUELINO OUTAGE

25. IF SHUTDOHN AT END OF REPORT PERIOD, ESTINATED DATE OF STARTUP2
25. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

. FORECAST ACHIEVED INITIAL CRITICALITY 09/I6/73 INITIAL ELECTRICITY 02/18/74 CONMERCIAL OPERATION 07/05//4 i

t t

PAGE 2 0F 2

  1. - NE0ATIVE VALUE REPORTED FOR CONSISTENCY HITH FEDERAL ENERGY REGULATORY Cott1ISSION REPORTS.

i l

l L ---

l I

1 OPERATING DATA REPCI.'

1 I

I

. DOCKET No. 50 - 278 l

j 1

DATE SEPTEHbER 15,1987 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY L. L. HIDDLETON TECHNICAL ASSISTANT LICENSING SECTION NUCLEAR SUPPORT DEPARTHENT TELEPHONE ( 215) 841-6374 OPERATIts STATUS I

1. UNIT HAHEI PEACH BOTT0H UNIT 3 l NOTES UNIT 3 REMAINED SHUTDolff 1

l l

2. REPORTIhG PERIOD AUGUST, 1987 l

IN ACCORDANCE HITH THE 1

l l

3. LICENSED THERMAL PONER(HNT):

3293 l

HARCH 31, 1987 NUCLEAR l

3 l

l j

4. NAMEPLATE RATItG (GROSS HHE)8 1152 l

REGULATORY CCHNICSION ORDER.

l l

l S. DESIGN ELECTRICAL RATING (NET HHE):

1065 l

l l

l j

6. HAXINUM DEPENDABLE CAPACITY (GROSS HHE)* 1098 l

l

)

l

[

7. HAXINUM DEPENDADLE CAPACITY (NET HHE):

1035 l

l

3. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS tRABER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONSt
9. P0HER LEVEL TO HHICH RESTRICT':0, IF ANY (NET HHE la

-10. REASONS FOR RESTRICTIONS, IF ANY 1

THIS HWTH YR-TO-UATE CUMULATIVE

11. HOURS IN REPORTING PERIOD 744 5,831 111,239
12. HUNDER OF HOURS REACTOR HAS CRITICAL 0

1,824,9 76.357.4

13. REACTOR RESERVE SHUTDOHN HOURS 0.0 0.0 0.0

=.

14. HOURS GENERATOR ON-LINE 0.0 1,f59.6 73,929.3
15. UNIT RESERVE SHUTDOHN HOURS 0.0 0.0 0.0
16. GROSS THERHAL ENERGY GENERATED (HKH) 0 4,759,248 215,278,901
17. GROSS ELECTRICAL ENERGY GENERATED (Ft#1) 0 1,555,560 70,611,432

==_._.

18. NET ELECTRICAL ENERGY GENERATED (HMH)

-5,862 1,478,641 67,720,734

=.___

PACE 1 0F 2

OPERATIto DATA REPORT (CONTIttJEll)

DOCKET TC. 60 - 278 DATE SEPTEM0ER 15,1987 t

4.._.

/

l'

. JTHIS 110 NTH YR-To-DATE

,(

CtfSLATIVE

'c ss i

19. UtlIT SERVICE FACTOR O.0 28.5 66.5

./

.t

20. UNIT AVAILABILITY FACTOR 0.0 28.5 66.5 l

j; i

21. Ut(IT CAPACITY FACTOR (USING HDC NET 1 0.0 24.5 58.8

-=

22. UNIT CAPACITY FACTOR (trING DER NET) 0.0 23.8 f57.2
23. UtfIT FORCED OUTAGE RATE 100.0 71.6 12.6
24. SHUTDOHNS SCHEDULED OVER NEXT 6 HONTHS (TYPE, DATE, AND DURATION OF EACH):

INDETERMINATE Ut1TIL NRC ORDER IS SATISFIED.

l J

25. IF SHUTDOHN AT END OF RFPORT PERIOD, ESTIMATE 3 DATE OF STARTUP

{ f

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OFERATION)

FORECAST ACHIEVED INITIAL CRITICALITY 08/07/74

,{

r-

,3 INITIAL ELECTRICITY 09/01/74 CotiMERCIAL OPERATION 12/23/74 t

i i

l k

1 I

i ll PAGE 2 CF 2 h

'1 i

m-_-_n-___-__-

v-ll1 i

Ut(IT SHUTDOHttS AND PONER REDUCTI0t1S DOCKET No. 50 - F77

=.........

UNIT NAME PEACH BOTT0t1 UtlIT 2

{

DATE SEP1Et13ER 15,1907 REPORT HONTH AUGUST, 1987 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY

__= -

L. L. MIDDLETCH TECHNICAL ASSISTANT LICENSING SECTION j

l HUCLEAR SUPPORT DEPARTMENT lr TELEPHONE ( 215) 841-6374 l

l

===_

= = _ - _ -

__-=.................................=- ----_ ___

l l

l 1

l l HCTHOD CF l LICENSEE lSYSTEHlCOMP0tlENTI CAUSE AtlD CORRECTIVE l

l l

lTYPElDURATIONIREASONISHUTTItlG DOHNl EVENT l CODE l CODE l ACTION TO CD.l DATE l I lli 4 HOURS )l 121 l REACTOR (3) l REPORT # 1 (4) 1 (5) l PREVENT RECURRENCE L...===

--==.. _......_

I I

l 1

1 I

I l

l 5 I 870001 l S l 120.0 1 C l 1

l N/A l RC l FUELXX l SHUTDOHN FOR ITS SEVEtfTH REFUELING OUTAGE.

l l

l 1

1 I

I I

I 6l8fdOD6l r i 624.0 l D l 1

l N/A l ZZ l ZZZZZZ l CONTIt4UATION OF SHLTfDOHti IN COMPLIANCE HITH I

1, j

l l

l l

l l THE COMMISSION'S ORDER.

1 Ji 1 ----- l l

l 1

1 I

l l

l 744.0 l l

l l

l l

i l

l 11)

(2)

(3)

A41 7 - FORCED REASON METHOD EXHIBIT G - IttSTRUCTI0tts 3 - SCHEDULED A - EQUIPMUKT FA1.URE (EXPLAIN) 1 - HANUAL FOP PREPARATI0f4 0F DATA 6 - KLINTENANCf! Ct (EST 2 - HANUAL SCRAM.

DITRY SHEETS FOR LICEtCEE C - REFUELItu 3 - AUTOMATIC SCRAN.

EVEtiT REPORT I LER)

D - REGULA4d4V RESTRICTION 4 - OTHER (EXPLAIN)

FILE (HUREG-0161)

E-OPERATC)7AAIN.1[NG+LICENSEEXAMINATION (5)

F. ADMINISTRATIVE,,

G -- OPERATIOt4AL ERMLH (EXPLAIN)

H - OTHER(EXPLAIN)

EXHIBIT I - SAME COURCE l

l e

l 1

I s

i UNIT SHUTDDIRC AND P0HER REDUCTIONS DOCKET No. SD - 278 j

i l

Ul4IT NAME PEACH BOTTON UNIT 3 DATE SEPTElEER 15,1987 REPORT HoffTH AUOUST, 1987 COMPLETED BY PHILADELPHIA ELECTRIC C0t1PANY L. L. MIDDLETON TECHNICAL ASSISTANT LICEt1 SING SECT'ON PUCLEAR SUPPORT DEPARTNENT TELEPHONE 1215) 841-6374 3..............

I I

I I

I HETHOD OF l LICEICEE ISYSTEMICOMPONENTI CAUSE AND CORRECTIVE l

ITYPEIDURATIONlRfASONISHUTTING DOHN!

EVENT l CODE l CODE l ACTION TO Q). I CATE I (Ill (HOURS)] (2) l REACTOR ( 3 ) l REPORT 8 l (4) l

15) l PREVENT RECURRENCE
........................==_.

I I

I I

I I

I I

I O I 870901 1 F l 744.0 l D l 1

1 N/A l ZZ l ZZZZZZ l SHUTDONN OF Ut4IT ON THE ORDER OF THE NRC.

I I

I ----- 1 I

I I

I I

I I

I 744.0 I I

I l

l l

(1) 42)

II)

(4) 7 - FORCED REASON HETHOD EXHIBIT G - INSTRUCTIOtG B - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - HANUAL FOR PREPARATION OF DATA B HAINTENAtlCE OR TEST 2 - MAtMAL SCRAM.

ENTRY SHEETS FOR LICENSEE C - REFUEL 7HG 3 - AUTOMATIC SCRAM.

EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

FILE (f0 REG-0161)

E - CPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE 15)

G - OPERATIONAL ERROR (EXPLAIN)

H - DTHER(EXPLAIN)

EXHIBIT I - SAME SOURCE l

l I

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA A, PA.19101 (2151841 4000 September 15, 1987 Docket Nos. 50-277 50-278 Director Office of-Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention: Document Control Desk y,"

SUBJECT:

Peach Bottom Atomic Power Station

' Monthly Operating Report Gentlemen:

Attached are twelve copies of the monthly operating report for Peach Botton Units 2 and 3 for the month of August 1987, forwarded pursuant to Technical Specification 6.9.1.d under the guidance of Regulatory Guide 10.1, Revision 4.

Very truly yours,

/

/

W. M. Alden Engineer-In-Cherge Licensing Section Nuclear Support Department Attachment cc:

W. T. Russell, Administrator, Region I, USNRC T. P. Johnson, PBAPS Resident Inspector S. P. Mangi. Dept. of Envir. Resources P. A. Ross, NRC (2 copies)

R. E. Martin, NRC Project Manager Thomas Magette, Maryland Power Plant Siting INP0 Records Center t \\