Advises That Projected Completion Dates for Items Identified in Encl Shift Technical Advisor/Senior Reactor Operator Training Program Schedule Provided in ,Per Generic Ltr 86-04
ML20234F458
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/31/1987
From: Shelton D
TOLEDO EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
1452, GL-86-04, GL-86-4, NUDOCS 8801110488
Download: ML20234F458 (3)


Text

,

s 4-s i

TOLEDO EDISON -

1 Docket No. 50-346 DONALD C. SHEl TON

)

w,%_ww.c.

(419l EdB 7399 License No. NPF-3 Serial No. 1452 December 31, 1987 I

United States Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555

Subject:

STA/SPO Training Program Schedule l

Gentlemen:

1 The Toledo Edison (TFD) Davis-Besse Course of Action (COA) dated September d

10, 1985 (Serial No. 1182, pages 79 and 80) and TED's' response (Serial No.

1274, May 16, 1936) to Generie Letter No. 86-04 identified long-term actions to upgrade the training attd qualification of Shif t Technical j

Advisors (STAS). The projected completion dates for these actions were i

provided in letter Serial Fo. 1355 dated March'9, 1987.

Our current STA training program was outlined in our response to Generic Letter No. 86-04.

In that responre, TED advised the NRC that we had adopted the policy that it was desirable for the current STA's to obtain an SRO. license. De also stated that TED intended to replace the STA pcsition with the Shift Manager pcsition by March of'1988.

Toledo Edison Davis-Besse Management not with NRC Region III staff on August 28, 1987, to update you on the Operations Department' status and future plans. A portion of the plan includes the Shift Manager replacing the STA position. During the August meeting, TED advised the' NRC that the f'lrst Shift Manager would be plactd on shift in January of 1989 rather than March of 1988 (as previously projected in Serial 1274).

The STA schedule needs to be consistent. The schedule provided in Attachment 1 is contingent upon the Operator Licensing Examination schedule provided in-Serial No. 1424 dated September 14, 1987, and the expected 100 percent pass rates (i.e., the current schedule does not allow time for re-examination).

8801110488 871231 PDR ADOCK 05000346 F W

PDR.:

0 hr THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 w

L--___-_______-___-_---____

1 j

s Docket No. 50-346 Linetise No. NPF-3 Serial No. 1452 1

3 Page 2 i

Of the original seven STA trainees, six have received their SRO licenses.

The remaining STA/SRO candidate is scheduled to be examined the week of j

May 16, 1988.

1 Very t

yours, f

,/h ES:bam Attachment I

cc:

DB-1 Resident Inspector

{

A. B. Davis, Regional Administrator

{

A. W. DeAgazio G. C. Wright T. M. Burdick l

1 i

4 I

I

o Docket No. 50-346 License No. NPF-3 Serial No. 1452

{

i Page 1 Item Scheduled Completion Date 1.

Once STA Staffing has been 02/01/88 increased from the current Training Program, each STA will be a full time member of a shift and will rotate with and participate in all functions of that shift j

i 2.

Completion of STA Training Program 07/31/88 3.

The STA position will be replaced 01/31/89 by the Shift Menager position l

1 1

I