ML20234E409
| ML20234E409 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Hatch |
| Issue date: | 09/18/1987 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| SL-3249, NUDOCS 8709220380 | |
| Download: ML20234E409 (2) | |
Text
.
p4 Ghorgia Power Cornpany s 333 Piedmont Avenue -
Atlanta, Georgia 30308 -
Telephone 404 526-6516
-Malling Address:
. Fbst othce Box 4545 i.
Atlarda, Georgia 30302.
L Georgia Power anage Nuclear Safety 4
. and Licensing.
1698C X7GJ10-H770-September 18, 1987 U. S. Nuclear Regulatory Commission
. Director of Nuclear Reactor Regulation Washington, D. C.
20555 PLANT HATCH - UNITS 1, 2 L
NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 SECURITY PLAN AMENDMENT ADDITIONAL INFORMATION Gentlemen:
. Georgia Power Company (GPC) proposed changes to th'e ' Plant Hatch Physical Security Plan (PSP) by letters of December 12, 1986, and December 22, 1986.
These changes ~ proposed to incorporate revisions reflecting changes to 10 CFR 73.55 published in the Federal Reaister on August 4, 1986.
Subsequent to these submittals, on April 13, 1987, GPC provided to NRC a complete re-issue of _the PSP.
That submittal, -which was.provided in accordance with 10 CFR 50.54 (p), superseded the original PSP in its entirety.
As provided by 10 CFR 50.54 (p), the new PSP and implementing-procedures were effected at the plant on April-15, 1987.
NRC review of the new PSP is continuing at the present time.
By letter of August 19,
- 1987, NRC notified GPC that numerous additional revisions were required to the changes proposed to the oriainal PSP by the above letters of December 12, 1986, and December 22, i
1986.
However, that document, and the changes proposed in the reference letters, have been superseded by the new issue of the PSP.
l He therefore request that NRC staff review of implementation of PSP changes reflecting the revised 10 CFR 73.55 be conducted against the new PSP, as reflected in the April 13, 1987, submittal.
He will be happy to address any comments relative to this review.
$DO ph
s.
Georgia Potver A h
U.:S. Nuclear Regulatory Commission September 18, 1987 1
Page 2:
If you have anyLquestions~ in this regard, please contact this office at-any time.
-.1 i
Sincerely, J
L. T. Gucwa j
REB /lc c: Georoia Power Comoany
.Mr. J. P. O'Reilly, Sr. Vice President - Nuclear Operations Mr. J. T. Beckham, Jr., Vice President - Plant Hatch i
G0-NORMS U. S. Nuclear Regulatory Commission. Washinaton. D. C.
Mr. L. P. Crocker, Licensing Project Manager - Hatch U. S. Nuclear Regulatory Commission. Reaion II Dr.-J. N. Grace,' Regional Administrator Mr. P. Holmes-Ray, Senior Resident Inspector - Hatch 1698C mns.